ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.

Slides:



Advertisements
Similar presentations
CH12.Problems JH.131. Take the lower center as rotation center then: M2 (L/4) = M3 (3L/4)  M2= 3 M3 Now the upper center: M1 (L/4) = (M2+M3)
Advertisements

WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Honda 450 Installation Manual.
Click on this image to open the full PDF document.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Competency: Design and draw interior elevations for kitchens and baths Objective: Explain the elements of kitchen and bath design.
Robot Classifications by Manipulator
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Instruction Manual for inserting the CMS ZDCs using the crane.
Ken YoussefiMechanical Engineering Dept., SJSU 1 Introduction to Fundamentals of Assembly.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
SQXF Shell & Yoke Assembly Procedure
P13458 RIT Senior Design Team May 3, AM-11AM Dresser- Rand, Painted Post Separables Project Close-out.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
A PS/2 mouse is shown above with the cover removed. The ball (upper right) rolls two plastic X and Y axles with a slotted wheel at one end. The slotted.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
Entablature Entablature is the name given to the cylinder block, which incorporates the scavenge air space and the cooling water space. It forms the housing.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
1 Loscam Limited. 2 Pallets should be stored in a clean and dry facility Secure and with adequate air circulation, free from the possibility of flooding.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
The Victorian Gazebo Assembly Instruction By Laser Dollhouse Designs.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
The analysis runs in the following slides are based on a W8 x 58.0 wide beam with dimensions shown bellow.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Citizens Serving Communities
Annex 5 - Tower and Lock installation
Annex 4 - Moving Frame and Whiffletree assembly
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
STRAIGHT ARM WALL LADDER RAISE LD16’-4
STRAIGHT WALL LADDER OVERHEAD RAISE LOW SHOULDER CARRY
Two Person Low Shoulder Raise and Carry
Crush while transporting and unloading steel frame structure
Warm Vessel South Wall Installation, Sub-assembly Option
SHAPER MACHINE SHAPER MACHINE SHAPER MACHINE.
Objective: Explain the elements of kitchen and bath design.
Neutron guide Shielding Concept
Links in Technical objects
Step 1:Disassemble battery case
Panel Riveting Dept. Adjustable Part Holding Fixture
Four Jaw Collimator.


Presentation transcript:

ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN

ZDC partially lifted vertically out of TAN slot

ZDC fully lifted out of TAN slot ZDC

ZDC lifted – Crane partially rotated toward Sarco on floor

Crane rotated nearly over Sarco

Crane system aligned and mated with Sarco

ZDC partially lowered into Sarco

ZDC fully lowered into Sarco – ZDC then removed from crane and taken to storage

See ZDC_Crane_Test_Fixture.pdf for dimensions Forbidden volumes of testing fixture – space reserved for ZDC and Crane movements Swivel mount Pivot mount

Possibly don’t use upper blocks Bolt beam assmbly into lower blocks instead

All-thread and spherical washers