3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Gantt Chart.
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
PRESENTATION BY DR. RAJESH KUMAR CLASS-BA 2 ND YEAR P.G. G.C.G. SECTOR-11, CHANDIGARH.
TK3333 Software Management Topic 7: Schedule Control.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
OPSM 639, C. Akkan Monitoring Progress How does a project get one year late? … One day at a time –Frederick P. Brooks MBWA: Management by Walking Around.
Systems Analysis, Prototyping and Iteration Systems Analysis.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Planning. Learning Objectives: By the end of this topic you should be able to:
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
Chapter 3 Managing the Information Systems Project
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Programme/ Project Title Programme/ Project Leader Project Team Members.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
The ADDIE Instructional Design Process
Science and Engineering Practices
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
La Naturaleza.  The generic term for the five-phase instructional design model consisting of Analysis, Design, Development, Implementation, and Evaluation.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Reaching Goals: Plans and Controls
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Appendix A Project Management: Process, Techniques, and Tools.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Software Project Management
Planning Your Time. Why plan instead of just do? Time is one of the most critical resources in any project. Good planning spreads the necessary work over.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Project Management Yonsei University 2 nd Semester, 2012 Sanghyun Park.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
PERT and CPM.
Project Management Theory. Planning a Project Identify the problems and inefficiency of system. – Design brief Design brief: A statement that contains.
Chapter9Chapter9 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Activities Budget Critical path Events Forecasting.
Project Management.
Project Management Inspections and Reviews 1 February.
TANZANIA FELLOWSHIP OF EVANGELICAL STUDENTS (TAFES)
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Project Management Organization Scheduling 31 January.
Topic 4 - Database Design Unit 1 – Database Analysis and Design Advanced Higher Information Systems St Kentigern’s Academy.
TOTAL QUALITY MANAGEMENT
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Research refers to a search for knowledge Research means a scientific and systematic search for pertinent information on a specific topic In fact, research.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Chapter 7 Project Management and Event Implementation
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
HNDIT23082 Lecture 10:Software Project Management
A Brief intro to Project Management What can it do for you
Project Management Systems
The ADDIE Instructional Design Process
BSBWOR301 Organise personal work priorities and development
WHAT IS A GANTT CHART.
Gantt Chart Presentation Name Course Name
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Business Decision Making
2.2 | Use Planning Tools.
ENGINEERING MANAGEMENT (GE 404)
Gantt Chart.
Facilities Planning and Design Course code:
Teaching slides Chapter 13
Project Management II The Project Value Creation Process
Presentation transcript:

3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project development, we are now moving into more challenging tasks about the time planning and the design process for the proposed project development.

Here, the time planning is regarding with the detailed time plans and techniques for the proposed project to be followed. The Project Manager is going to do/show his overall responsibility to undertake that project especially during the construction time/period. The next step allows the plan to be ready and to make understanding to all parties involved in the project. The objective is to make the major revision early in the planning stage and make some minor changes (if necessary) to the plan. The idea here, so that everybody in the team will be able to understand what is the progress for the proposed project. This is known as visibility and is an essential features for both, the plan and the process during construction stage. The most commonly used techniques here is by using the bar or Gantt Chart or Cash-Flow.

PHOTO 1: SHOWING SEVERAL PROJECT DEVELOPMENTS UNDER CONSTRUCTION.

From the Photo 1 above, shows the progress of the construction sites being carried out and should be completed within a specified time frame. Every construction site has its own responsibility according to the schedule or programme to avoid any delays or other unforeseen circumstances such as delayed in materials supply, increased in construction costs, extension of time periods, rainy day and any other reasons.

3.2 SCHEDULING OF PROJECT Knowing the phases and duration of activities is a major step. Certain critical activities has taken placed at a particular time and the entire plan will be disrupted. If there is likely to be clashes/problems with the project schedules in a project development, there will be a constraint of the scheduling process. As a result the activities and phases will needs to be changed. But where different group of people are involved at different stages of the project, that team will focus on their part of the project only, with no consideration of the outcome of the whole. However, the Project Manager must identify the problems or he himself to be informed by the team.

So, having a proper scheduling in the project implementation, the Project Manager would like to see certain problems that might arise could be avoided and to adjust wherever possible so that the proposed project can runs smoothly. 3.3 CONCLUSION The objectives of time planning is to optimise the project scheduling and to prevent any problem during that process. This is to achieve through the systematic evaluation of the project’s activities, their duration and linkages.

PHOTO 2: SHOWING THE PROPOSED LAYOUT PLAN

This is the most widely use technique for the development schedule by using the Gantt Chart and network technique. Thus, it is a graphical planning tool to represents for the relationship between activities and the duration of the project to be carried out by the Project Manager.

THANK YOU