Guideline for Civil Infrastructure for AWP & B 2015-16.

Slides:



Advertisements
Similar presentations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Advertisements

Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Environmental Assessment Survey of School Building.
SCHOOL MAPPI NG PRESENTATION BY SATISH GIROTRA Senior Consultant, TSG, EDCIL.
CUMULATIVE PROGRESS (PHYSICAL STATUS) State:DELHI S. No.Activities Targets till date (Units) Cumulative Completed (Units) Cumulative In Progress (Units)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
By Satish Girotra Implementation of school infrastructure.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
SCHOOL INFRASTRUCTURE SURVEY
USDA Civil Rights and Child Nutrition Programs. Child Nutrition Program Civil Rights Understanding Civil Rights And Civil Rights Training In 10 Easy Steps!
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
PRESENTATION ON CIVIL WORKS
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Write it Right.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
1 APIP for From , submission of APIP by States/UTs in the prescribed format is mandatory.APIP to be prepared based on the Administrative.
`.  SSA-RTE Objectives  At a glance  Outcome Indicators  RTE Preparedness  School mapping exercise  Physical Achievement  Financial Achievement.
WASH Cluster Response Plan Summary Cluster lead agency United Nations International Children’s Emergency Fund Number of projects Estimated 18 from.
ASER PAKISTAN 2011  ASER- Annual Status of Education report is a survey of the quality of education.  ASER seeks to fill a gap in educational data by.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Shelter Centre Meeting, Geneva24 May 2012 Sustainable Reconstruction in Urban Areas A Handbook Project Coordinator: Sandra D’Urzo, IFRC Lead Author and.
Technical Proposals Written in order to expedite job-related processes: Significant operational improvements New business Additional jobs Safer working.
Saxilby with Ingleby Parish council These slides highlight what your Parish Council has achieved in 2009/10. If you have any questions please contact:
Water Country Briefs Diagnostic Workshop Didier Allély Abdou Savadogo World Health Organization Geneva, 8-9 December 2010.
WEL COME PREPARATION OF CASE RECORDS. MODEL CASE RECORDS A Model Case Record should contain  Order sheet duly numbered  Copy of Approved Annual Action.
Progress of WASH-in-Schools in Chhattisgarh 2013 A perspective of status of drinking water and sanitation in schools in Chhattisgarh unite for children.
Karnataka – Key Information* Population million Proportion of Child Population in age group 0- 6 years : 11.2% Sex Ratio: 968 females for 1000 males.
ASER Pakistan a citizens’ led initiative 1. About the ASER Survey The purpose of the ASER rapid assessment survey and its planned annual rounds in rural.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
Regional Workshop on Sustainable Sanitation in South Asia April 27 – 29, 2009 Water, Sanitation and Hygiene Education Sector - Afghanistan.
Civil works component is one of the important interventions of SSA. It helps in bridging the infrastructural gaps and acts as a visible intervention to.
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ANNUAL STATUS OF EDUCATION REPORT (ASER)
MDM-PAB Meeting- MEGHALAYA
Addressing Local Priorities in Primary Education – Issues & Perspectives Dipak Ray (OPEPA, D/O S & ME)
Architectural Drafting
City:- Corporation of City of Panaji
ANNUAL STATUS OF EDUCATION REPORT (ASER)
Residential Placement Application 2011
Chapter 15 Site Plan Layout.
ANNUAL STATUS OF EDUCATION REPORT (ASER)
MID DAY MEAL SCHEME MEGHALAYA
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
SCCF Narrative Reporting
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
WASH in Schools – Project Update
Guide To Reconcile Sales Tax Updated June 2019
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
ANNUAL STATUS OF EDUCATION REPORT (ASER)
Presentation transcript:

Guideline for Civil Infrastructure for AWP & B

Plan Proposal for Major Repair / Reconstruction / Retrofitting & Renovation. For proposing Plan Proposal for Major Repair / Reconstruction / Retrofitting & Renovation if any, SPO memo no:154(20)/CW/PBSSM/2013, Dated:28/11/2013, is to be followed. Summery sheet of schools requiring repair works should bear current U-DISE code along with individual estimated amount. All proposal for CLRC/CRC repair if any also be made as similar with school building repair proposal along with 2 sets of complete DPR.

Boundary Wall / Guard Wall / Retaining Wall Boundary Wall / Guard Wall / Retaining Wall can be proposed only for those schools where children’s safety is concerned. For proposing Boundary Wall / Guard Wall / Retaining Wall, individual school is to be identified first beside National/ State Highway (for boundary Wall) and large water body (for Guard Wall / Retaining Wall) and the site plan of each and every school should also be given in a booklet form separately mentioning the approach road, location of water body, location of different building blocks of the school, north-south direction, total area to be covered by Boundary Wall / Guard Wall / Retaining Wall highlighting the existing and proposed periphery through separate colors. Two copies of booklets (spiral binding), containing individual site plan for each school for Boundary Wall / Guard Wall / Retaining Wall are to be submitted along with the Summary Sheets enclosed and a forwarding letter from the concerned District Project Officer. Another copy along with other relevant documents must also be kept with the district authority for future reference towards implementing the works. Site plan for individual school (as already circulated vide SPO Memo No: 1/PBSSM/CW/2013, Dated: 07/01/2013) is to be given as shown in next slide.

Sanitation Facility District may propose additional requirement of Boys’/ Girls’ Toilet separately in urban and rural areas based on current enrollment ( per 80 Children) if gap of Toilet facility is already met. If there is any further requirement of Drinking Water facility District may propose the same separately for urban and rural areas. Requirement of Barrier Free Toilet should be based on 5 CWSN enrollment for each school.

THANKS