1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
[ 1 ] LVDS links Servizio Elettronico Laboratori Frascati INFN - Laboratori Nazionali di Frascati G. Felici LVDS links.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
STAR Forward GEM Tracker Safety Review Electrical
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
A 72 Channel 125 MSPS Analog-to-Digital Converter Module for Drift Chamber Readout for the GlueX Detector G. Visser 1, D. Abbot 2, F. Barbosa 2, C. Cuevas.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
2012 repairs, upgrades, work to complete FGT Readout/DAQ Gerard Visser FGT Meeting April 16, 2012.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Update on the CDC GlueX Collaboration Meeting October 2006.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Final Review March 2015.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
1 10 th October 2007Luciano Musa Considerations on readout plane IC Area (die size) 1-2 mm 2 /channel Shaping amplifier 0.2 mm 2 ADC0.6 mm 2 (estimate)
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
FGT Readout/DAQ Update, FGT electronics integration – reminder/update ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 kV.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
LHCb Outer Tracker Electronics 40MHz Upgrade
Markus Friedl (HEPHY Vienna)
Calorimeter Mu2e Development electronics Front-end Review
AFE II Status First board under test!!.
A Readout Electronics System for GEM Detectors
ALICE Muon Tracking Upgrade EDR Answers
Front-end electronic system for large area photomultipliers readout
Example of DAQ Trigger issues for the SoLID experiment
Overview of T1 detector T1 is composed by 2 arms
Optical links in the 25ns test beam
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility 5/16/2008

2 (Gerard Visser – STAR Integration Meeting 5/16/2008) Modular readout crate architecture backplane ARCARM Optical fiber to D-RORC 7 pair cable or optical fiber from STAR TCD ALICE SIU (mezzanine board) Signal & Power cables, ≈ 8.3 m, to APV Connector/Motherboards Remote regulated DC power Two crates, each handles 12 cables, 10 APV’s per cable, a total of detector channels per crate ARM (APV Readout Module): 20 ADC channels and data processing FPGA’s (zero suppression, pileup rejection); power for APV on ARM or separate new board (4/crate) ARC (APV Readout Controller): control FPGA’s, STAR clock/trigger interface and ALICE SIU (data/control link) Connected by passive backplane, 30 MHz synchronous 24 bit datapath Uses commercial hardware (6U crate, VME P1 backplane) Crates mounted on west end ring of STAR magnet, e.g., in former location of SVT crate; magnetic field tolerant design

3 (Gerard Visser – STAR Integration Meeting 5/16/2008) FGT DC Power and Grounding readout crate backplane Isolated dual DC supply (Wiener PL-508) 4x 4AWG sense lines 4C 18AWG A, A Quasi-isolated output +/-1.8V regulator Low-dropout low noise regulator +/-1.25V 3x 20AWGAPV25 ASIC’s 20AWG FEE GND OPTION JUMPER A, A STAR GND (magnet steel) GEM bias divider / bypass caps STAR GND (TPC structure) Non-isolated HV DC supply PREFERRED FEE GND OPTION ARM (only 1 shown here) APV Motherboard assy. (1 of 24 shown here) 8.3 m 24 m Local loads, not detailed here HV coax, shown here as two lines for clarity south platform 2 nd levelreadout crate (only 1 shown here) POWER SUMMARY (ENTIRE FGT LV) 240 APV CHIPS74 W FEE (MOTHERBOARDS) TOTAL106 W READOUT CABLES25 W READOUT CRATES577 W DC INPUT CABLES137 W DC SUPPLY LOSSES173 W OVERALL TOTAL1019 W Inside, at detector

4 (Gerard Visser – STAR Integration Meeting 5/16/2008) (Stock) Cables from ARM to ACB/AMB Power & ground, 7C #20 AWG – Belden #5405FE, 5.1mm dia., 56.7 g/m +1.8 V force +1.8 V sense power return “ground” force ground sense -1.8 V force -1.8 V sense detector ground connection foil shield w/ #22 AWG drain wire Control & signal, 18Pair (3 unused) #28 AWG – Alpha #6398 or Belden #9819, 9.8mm dia., estimated 112 g/m CLK to ACB/AMB CLK loopback from ACB (arrives at ADC automatically in time w/ signals) TRG APV signals to RDO (10 pairs) I 2 C SDA/GND I 2 C SCLK/GND foil shield w/ #28 AWG drain wire, and tinned copper braid (rather not have it) Total cross-section passing last FGT disk: 19.2 cm 2 (20 power & 20 signal cables), total mass about 5.5 kg

5 (Gerard Visser – STAR Integration Meeting 5/16/2008) APV analog output driving a long cable Noise level 11.5 bit dynamic range With equalization, full swing is restored, sample-sample crosstalk almost completely cancelled, within 1 sample time (56 ns) Remaining <1% sample-sample crosstalk may be robustly removed with FIR digital filter APV ONLY – NO CABLE – 110 Ω LOAD19 m PVC CABLE IN/OUT (DOUBLE TERMINATED, AD8129 RECV.) In contrast to CMS, we will send the APV analog signals a considerable distance (8.3 m) from the detector, with no buffering or optical conversion at the detector. CABLE OUT (DOUBLE TERMINATED, AD8129 RECV., EQ. ) The APV “digital” header provides a convenient test pattern Works fine, even in this test w/ more than double the planned length (ok we could even consider to allow longer cable if we must… I’d like to know this soon!)