TOWN OF PENETANGUISHENE PAYETTE RESERVOIR UPGRADES July 24, 2014.

Slides:



Advertisements
Similar presentations
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
Presented by: Ronald O. Nichols LADWP General Manager
HSDRRS Wave Overtopping Risk Reduction for Return Events Greater than 100 yr. By: John Monzon, P.E. Flood Protection Division Chief and Rickey Brouillette,
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
Fluid Mechanics 07.
HHWSP Act for Clean Water Source Water Protection Issues Hamilton-Halton Watershed Stewardship Program (HHWSP) of Hamilton Conservation Authority and Conservation.
GIBSON ISLAND WATER SYSTEM CAPITAL IMPROVEMENT PROJECT Public Information Meeting June 5, 2012.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Definition and choice system for maintenance with water the population of small village Submitted by: Pavel Kostyuk Student, WR227 December 6, 2004 (
Connecticut Department of Energy and Environmental Protection.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Energy Efficiency Office, EMSD
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Massachusetts Department of Environmental Protection Drinking Water Program.
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
Lecture 1 Water Distribution Systems
Water System Planning Study
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Selecting Application.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
HYDRO POWER PLANT
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Introduction Before going ahead into our project I want first talk in a brief about the importance of water, water is essential to sustain a life and.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
Proposed Retail Rate Change Effective January 1, 2008.
1 Public Hearing User Rate Adjustments April 8, 2008.
CE 3372 Water Systems Design
Group Exercise: Assess the condition and criticality of the following assets Based on description of the asset, give your opinion on.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Baltimore City Department of Public Works. Design Notice to Proceed: October % Design Completed: July % Design Completion: November 2015.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Prepared by: Alex Fisch Planning Services Division.
DIAPHRAGM WALLS.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
 Plumbing refers to the laying and repairing of pipes and fixtures for the distribution of water or gas in a building, and for the disposal of sewage.
Course Content  Layout of distribution  networks, methods of water  distribution, storage capacity of ESR, and underground service reservoir.
DZ11 Qweisma.
DZ01 – Marka D B E C B G A B C.
PUBLIC MEETING 2017 Water and Sewer Budget December 13th, 2016.
View display boards and speak one-on-one with staff
Highveld Industrial Park Storage Warehouse No. 3
Baltimore City Department of Public Works
Parul Institute of Technology
TOWN OF Penetanguishene Payette Reservoir Upgrades
Parkland/Brookdale Interceptor Replacement
The sport hall.
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Reservoir Capacity (m3)
Metropolitan Tunnel Redundancy Program Update
Presentation transcript:

TOWN OF PENETANGUISHENE PAYETTE RESERVOIR UPGRADES July 24, 2014

Welcome and Introductions C.C. Tatham & Associates Ltd.: Rod Langford, C.E.T., Project Manager Suzanne Troxler, M.Sc., P.Eng., Manager – Environmental Engineering Town of Penetanguishene: Bryan Murray, P.Eng., Director of Public Works Moe Lefaive, C.Tech., Chief Operator, Water Division 2

Project Purpose Implement recommendations of 2012 Class EA Study. Replace aging drinking water reservoir at Payette Drive. 3

Existing Drinking Water System Payette DWS: 3 groundwater supply wells 3 water reservoirs (1 on-site, 2 off-site) 1 pump house 4 pressure zones Water Storage: Payette Drive Reservoir Robert Street West Reservoir Centennial Drive Elevated Tank 4

Existing Payette DWS Site Church Street Payette Drive Reservoir Pump House Well No. 3 Well No. 2 Well No. 1 Supply Water Main

Constructed in 1910 (104 yrs old) Above-grade, earth berm around it 1,100 m³ capacity Payette Drive Reservoir

Constructed in 1931 (83 yrs old) Partially above-grade 1,100 m³ capacity Robert Street West Reservoir

Constructed in 1993 (21 yrs old) Entirely above-grade/elevated 5,000 m³ capacity Centennial Drive Elevated Tank

2012 Class EA Study Payette Drive and Robert Street West reservoirs approaching end of life. Need to be replaced to prevent failure and loss of service. Preferred solution is to construct new reservoir at Payette Drive site. Then decommission Payette Drive and Robert Street West reservoirs. 9

Preliminary Design of Upgrades Existing Payette Drive reservoir is 15.5 m diameter and 6.5 m high. Cast-in-place concrete, above-grade and bermed with earth all around. No redundancy. Difficult to service without taking off-line, causing service interruptions. New Payette reservoir capacity: 2,200 m³ (combined capacity of existing Payette Drive and Robert Street West reservoirs). 10

Preliminary Design of Upgrades Two above-grade reservoirs, each 12.8 m diameter and 8.5 m high, 1,100 m³ capacity (2,200 m³ total). Proposed location is generally behind existing reservoir berm. Also replacing existing 104 year old supply water main from existing reservoir to Church Street. Has reached end of life. Needs to be replaced to prevent failure and loss of service. 11

Proposed Payette DWS Site Payette Drive Reservoir Well No. 3 Well No. 2 Well No. 1 Proposed Reservoirs Church Street Pump House Supply Water Main Replaced in Same Location

Proposed Payette DWS Site Plan

Viewing Angles for Graphic Visualizations Payette Drive View #3 View #1a View #2 Church Street View #1b

Proposed view from end of Payette Drive Graphic Visualization #1a

Proposed close-up view from end of Payette Drive Graphic Visualization #1b

Proposed close-up view from entrance to pumphouse Graphic Visualization #2

Proposed view from edge of existing tree line Graphic Visualization #3

Benefits of Proposed Reservoirs Glass-coated steel construction. Requires very little exterior maintenance. Not bermed around. Easier access for inspection, maintenance and repair. Two reservoirs allows one to remain in service if other is off-line, providing uninterrupted water supply. 2 m of additional height improves operating pressure in lower zones. 19

Benefits of Proposed Reservoirs Reduces overall operating costs. Optimized site layout: less excavation and piping, few changes to green and open spaces. Limited and short-term interruptions to water supply. 20

Schedule Complete design and obtain approvals in Construction scheduled for

Questions & Comments Questions & Comments? Please complete and hand-in comment sheet. 22