EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.

Slides:



Advertisements
Similar presentations
T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
PHOS data taking status - lessons learned/implications for EMCAL Outline Recent work in PHOS CERN, May and June 2007 (PHOS & EMCAL team; Josh, Lamia,
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
DCal Meeting
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
S-2S memo WC Toshiyuki Gogami 24Apr2015.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
IFR Status Report W. Baldini, on behalf of the Ferrara SuperB-Group XIV SuperB General Meeting, Frascati Sept.27 – Oct
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
The ALICE Electromagnetic Calorimeter
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
EMCal – France Status report, July 2008 Manpower Technical activities
CERN SPS and PS Tests 2007 Goals: Show we have a working EMCal system
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Presentation transcript:

EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008

Mark HeinzEMCAL Meeting July Status Facilities for Assembly and Calibration are ready Cosmic scintillator trigger parts are scheduled for delivery by July 31. –Subsequently configuration and testing for signals and position resolution can start. Final electronics configuration will be determined after first tests with final scintillators setup. –Goal: Be ready for triggering cosmics by Sep 15. EMCAL DAQ (incl FEE, DCS): Configured at CERN and ready to be shipped to Yale (thanks to David & Terry) Software for data-taking: available from test-beam (CERN CVS D.Silvermyr) and further development in Aliroot by offline group Software for triggering and analysis: first analysis tools available by Grenoble (Sebastien) and WSU (Aleksei). Further development in collaboration with Grenoble/WSU SM Shipping contract (Yale-CERN): Initial bids by 2 international logistics firms expected. Negotiation stage to start soon.

Mark HeinzEMCAL Meeting July Yale Calibration Lab Facilities are adjacent to RHI offices, and within 50m of truck loading dock. Room 1: Main Calibration LabRoom 2: Storage & Packaging

Mark HeinzEMCAL Meeting July Scintillator triggers 16 scintillator slats ordered for each site (Yale/Grenoble) from EljenTechnology (Texas, US). Each slat will be read-out by 2 PMT’s on opposite ends. Configuration will allow to accumulate data & calibrate ¼ (Yale), 1/3 (LPHC) SM during one run (12 hours) Coincidence signal between 2 slats (up & down) will be organized (1 strip module). PMT Timing and Amplitude information will be processed CAD by JFM

Mark HeinzEMCAL Meeting July Other Trigger Components Power Supplies for PMT (32 channels) –Custom-Made (N.Smirnov) Cockroft-Walton (CW) power base separately at Yale –Grenoble uses different PMT’s 1 unit for 2x4 channels shown

Mark HeinzEMCAL Meeting July Trigger Electronics (version 1) Meeting Yale-Grenoble, March 11, 2008

Mark HeinzEMCAL Meeting July PS710 4 channels PS754 PS705 PS715 PS794 PS715 D.L. OUT VETO BUSY “FAST” OR START TDC ADC GATE D.L. 24 channels STOP TDC 24 “A” channels ADC 24 “D” channels PS776CR µs “FAST” OR OR IN REGISTOR, 6 channels Trigger Setup (version 2) Thanks to University Houston & BNL for temporary donation of critical components Shaper/Discriminator 4-fold coincidence Gate Generator

Mark HeinzEMCAL Meeting July Time-Difference Measurement Goal is to be able to get position measurement of cosmic track along strip- module coordinate using timing difference. Can be used during offline analysis. Additional possibility maybe to use ADC information Nikolai did a preliminary study (using available scintillator, different dimensions) This needs to be repeated with final scintillator and incorporated into datastream.

Mark HeinzEMCAL Meeting July Handling Tools Grenoble has designed and manufactured a set of strip handling tools for Yale. These will be shipped by the end of the month. This also includes support structures for Scintillator positioning for cosmic test. In return Yale has purchased Scintillator strips for the Grenoble lab.

Mark HeinzEMCAL Meeting July SM Calibration Procedure Common Yale/Grenoble approach has been agreed upon and a draft documentation is available on web: – Most important steps are: 1.Mount SM-crate on shipping platform 2.Test each Strip-Module with LED before insertion 3.Install strip modules 1-8(6) 4.First LED&pedestal run with nominal gain 5.Cosmic trigger aligned with strip 1-8(6) & start 1 st cosmic run 6.Analyze data and obtain MIP peaks, determine new APD bias 7.Remove any bad strips found. 8.Repeat with strips 9-16, and 17-24

Mark HeinzEMCAL Meeting July Summary On track: –Cosmic trigger parts available for installation by July 31. Configuration and setup thereafter will take 1-2 months. –EMCAL DAQ will be in place at Yale/Grenoble labs by end of July. Needs to be tested. Next steps (Yale/Grenoble): –Software needs to be developed/adapted to the cosmic trigger setup. Analysis tools need to be streamlined. Outstanding Issues (Yale): –HV EMCAL supply needs to be ordered for Yale –EMCAL Test-modules need to be made available at Yale by Mid- August to commence realistic trigger testing.