ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
GLOBALink/HF Data Link
SESAR position on ATM Communication Technologies and future trends Kors VAN DEN BOOGAARD, SESAR CIT Hanspeter KULHEN, SESAR Task 2.5 R - EADS Astrium Cedric.
ACARS & VDL Mode AVICOM Japan
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) SEVENTEENTH MEETING OF THE WORKING GROUP M Bangkok, Thailand.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
EN 3 29/04/2015 © Astrium 1 The future role of satcom in civil aviation ATN 2002, London, September 25th, 2002.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN Air-Ground Subnetworks
Secure Communications in Civil Aviation Paul Wells A presentation to ATN September 2002.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
ATN Subnetwork Implementation:
ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
FCC Narrowbanding Overview What is a radio channel? What is narrowbanding? What are the FCC deadlines?
Interdependence between Critical Infrastructures Broadening the definition of infrastructure: from transport to logistics.
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
1 2 nd Australian based CGSIC Meeting Ground based Regional Augmentation System (GRAS) Keith McPherson, Manager GNSS.
Doc.: IEEE /0242r0 Submission Doc.:IEEE /0242r0 February 14, 2011 Rolf de Vegt (Qualcomm)Slide ah Usage Model Submission Sensor.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Report number: Project Cost: $32,922 Project Duration: 12 months
2004 Friends/Partners in Aviation Weather Forum 1 Progress in Weather Information Management and Dissemination 2004 Friends/Partners in Aviation Weather.
International Air Transport Association Transition to the new CNS/ATM ATN 2000, September 2000, London Günther Matschnigg IATA Vice President Operations.
11 Space Weather Services in Support of Global Air Navigation – Role of the Neutron Monitor Doug Biesecker Bob Rutledge NOAA Space Weather Prediction Center.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
Submission doc.: IEEE /0339r0 Jul 2004 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Satcom2016.
Rebecca M. Cowen-Hirsch Inmarsat, Inc.
Integration of Temperature Control into the Supply Chain
Workshop on preparations for ANConf/12 − ASBU methodology
Economics and Timing of Migration to IMT-2000
Broadband Satcom for Aeronautical Communications
AERONAUTICAL COMMUNICATIONS PANEL (ACP)   SEVENTEENTH MEETING OF THE WORKING GROUP M   Bangkok, Thailand 31 January – 1 February 2011 INFORMATION PAPER.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
The Air Ground Datalink Server (AGDS)
Airbus work on VDL Mode 4 ACP WGM8 / WP-08 Rev. A
ATN/VDL Mode 2 Implementation Status
ATN Air-Ground Subnetworks
Aeronautical Communications Global Needs Global Solutions
Long Range Satellite Communications
FANS 1/A over Iridium (FOI)
9/17/2018 Boeing ATN/IPS (Aeronautical Telecommunications Network/Internet Protocol Suite) Activities Title Option 1: Environment, Health & Safety Standard.
NEXCOM by Bruce Eckstein FAA.
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
ATN Subnetwork Implementation:
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002
ICAO ACP Working Group M Iridium Sub Group Overview
International Civil Aviation Organization
Presentation transcript:

ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group

Why?  Media management is a part of the framework in which FANS operates.  Media management is used today to meet existing user requirements for shared use networks to be used for ATS services.

Goals of media management inquiry Establish a common understanding of ACARS media management – Media management may mean different things to different groups Identify operational impacts of media management, if any Identify systemic approaches to mitigating impacts of media management

The state of ACARS media management as understood today Existing media – VHF Plain Old ACARS (POA) AOA (VDL Mode 2) – SATCOM INMARSAT IRIDIUM – HF Aircraft behavior depends greatly upon individual ship configuration Ground (CSP) behavior driven by operator requirements – Can be affected by ground automation (FAA) requests (e.g. TEI) – Operator configuration controls order in which media are used

Purpose of media in ACARS POA – First media used for ACARS, extremely limited growth potential at this point AOA – More efficient use of VHF spectrum, support for future technology (ATN) SATCOM(INMARSAT) – Support for remote coverage, also first HF – Adds to SATCOM with global coverage including polar coverage IRIDIUM – Alternative form of global coverage

Impacts to operation Use of VDL Mode 2 media – Frequency and duration of usage – Latency Thresholds for acceptability – Per service?

Future possibilities for understanding Types of timers in the CHI What is the impact to controllers when these timers are exceeded