15 December 2015Alan Norton, NA62, LKR WG 1 LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses LKR.

Slides:



Advertisements
Similar presentations
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Advertisements

GWDAW 16/12/2004 Inspiral analysis of the Virgo commissioning run 4 Leone B. Bosi VIRGO coalescing binaries group on behalf of the VIRGO collaboration.
Frank Geurts Rice University.  Time-of-Flight in STAR ◦ start & stop detectors in Run 9  Time-of-Flight Calibration ◦ upVPD ◦ Barrel TOF ◦ preliminary.
HLT & Calibration.
Reconstruction and Analysis on Demand: A Success Story Christopher D. Jones Cornell University, USA.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
LKr readout: present and future R. Fantechi 30/8/2012.
1 TPC online  offline calibration November 2002.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Alan Watson Atlas Trigger Workshop, Amsterdam, 18-22/10/10 1 Calibration of L1Calo L1Calo Calibration Overview L1Calo Calibration Overview Calibration.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
PHOS offline status report Dmitri Peressounko ALICE offline week,
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
TPC QA + experience with the AMORE framework Marian Ivanov, Peter Christiansen + GSI group.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
AliRoot survey: Analysis P.Hristov 11/06/2013. Are you involved in analysis activities?(85.1% Yes, 14.9% No) 2 Involved since 4.5±2.4 years Dedicated.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
The Lead Glass Detector Overview, Experience and Direction.
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Calorimeter Task Force Workshop February 10, 2003 Leslie Groer, Columbia UniversityCalorimeter Software Status 1 Past Calorimeter Software Improvements.
M.D. Nov 27th 2002M0' workshop1 M0’ linearity study  Contents : Electronic injection Laser injection Beam injection Conclusion.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Custom Classes DetectorShapeView2D: Detector mouseover callbacks (default is mouse click). EventControl:
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
A. Salamon - TDAQ WG Pisa 27/03/ Lkr/L0 Trigger V. Bonaiuto, N. De Simone, L. Federici, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Rainer Stamen, Norman Gee
LKr status R. Fantechi.
CALGO: Software Tasks cal software:
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
The Silicon Drift Detector of the ALICE Experiment
Online Calibration Online calibration: validation: L3fCalCalibTool –
HLT & Calibration.
Design of Digital Filter Bank and General Purpose Digital Shaper
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
CMS Pixel Data Quality Monitoring
VELO Software Update TELL1 Algorithms Error analysis
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

15 December 2015Alan Norton, NA62, LKR WG 1 LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses Alan Norton / Ferrara

15 December 2015Alan Norton, NA62, LKR WG 2  Continue to monitor bad pulses from Transceiver Power Supplies. There is a clear improvement with repairs, which should be completed for the 2016 run.  Channel gains are very stable (no signs of the frequent gain jumps seen in the past with CPDs).  Pedestals must be better monitored. Baseline Equalisation degrades with time (glitches, firmware resets, … ). Wandering pedestals directly impact cluster energy biases and resolution.  In 2016, random NZS pedestals, and pulser calibrations, should be recorded during data taking (as in the past), and streamed for fast analysis (best online and automatic).  Give more priority to the transition from old to new software, with storage of run-dependent constants in the NA62 DB. Next Actions (from October 2015)

15 December 2015Alan Norton, NA62, LKR WG 3 TOO UNSTABLE in 2015 : ( Baseline Equalisation not robust enough) Cream firmware? Random hiccups? Temperature variation? ….. NEED routine procedures to monitor and record history On-line, (semi)-automatic Regular NZS events with random trigger Early detection of problem channels or Creams Unless Baseline Equalisation improves: NEED run-dependent peds in reconstruction Only one set in 2015! Make available fast for online and offline PEDESTALS

15 December 2015Alan Norton, NA62, LKR WG 4 GAINS Stable in 2015 but : Need to check for unexpected behaviour e.g. bad pulses seen at high energy (TX PS) NEED routine procedures to monitor and record history On-line, (semi)-automatic Regular samples with calibration trigger.. end of each burst or dedicated runs Early detection of problem channels or Creams Add histograms to the online monitor PULSER CALIBRATION

15 December 2015Alan Norton, NA62, LKR WG 5 NEED to monitor, and store history : Fixed list, e.g. dead preamps Dynamic list from pedestal & Pulser runs Occasional bad Creams NEED UP-TO-DATE run-dependent lists for: On-line reconstruction Offline reconstruction and MC Analysis Easy visual inspection NEED to be consistent: Fix different lists e.g. from Alan and Michal Avoid ad hoc lists in reconstruction BAD CHANNELS

15 December 2015Alan Norton, NA62, LKR WG 6 T 0 s for 2015 were extracted by Riccardo : Using physics triggers (  +  0 ?) Limited statistics, especially on boundaries Resolution about 700 ps (?) - should it not be better? (my question) - is there any energy dependence of the T 0 ’s ? STUDY if calibration pulser can help (started by Alan) More promising with Creams, but … different cable lengths in the pulse distribution Small differences in pulse shape TIME CALIBRATION

15 December 2015Alan Norton, NA62, LKR WG 7 Suggested further study with a mixture of physics and calibration data Issues with present ZS - single pulse level in Creams Non-uniform / biased pulse suppression because of noise variation across the LKR (X-dependence) Cutting power reduced by noise with the present algorithm (cut on max-min in 8 samples) No halo expansion biases cluster energies in a complicated way, and reduces resolution; clusters may be split Is there scope for more elaborate Cream algorithms? Can we go back to precise pedestals with extra logic for pile-up? Can we envisage two-level ZS: Cream + online PCs? Have we given up on no-loss bit compression? Digital Filtering limitations and possible improvements Energy (non-)linearity SMALL PULSES

15 December 2015Alan Norton, NA62, LKR WG 8  2015 was about SURVIVAL during hectic evolution with many other priorities  2016 should be about moving to ROUTINE (semi-)automatic procedures  Time-dependent calibration data sets are needed, accessible at all levels. Ad hoc data bases are not sustainable.  There is need for more cross-talk between Basic Calibration (single channels) and Reconstruction (clusters).  In 2015, there was limited effort for Basic Calibration : Riccardo:indispensable, but everywhere Michal:other responsibilities; focusing on Analysis Alan:part-time; a reluctant novice with NA62 software Some Comments