L. Fiscarelli O. Dunkel, J. Feuvrier, S. Izquierdo Bermudez, G. Willering International Review of the HL-LHC 11 T Dipole for DS collimation December 2014.

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Rotating Magnetic Field
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
ECE 4411 Introduction to DC Machines Advantages –Adjustable speed –Develop rated torque at all speeds –Higher torque than an equivalent AC machine Uses.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Rotating Coils - Giordana Severino – Rotating Coils PACMAN meeting Printed Circuit Coils – Future developments.
S. Russenschuck, CLIC-Workshop, WP2-Pacman, R&D projects on rotating coil probe and stretched wire techniques for CLIC / PACMAN Stephan Russenschuck.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
Geneva, 12/06/ Results of Magnetic Measurements on MQXC 02 L. Fiscarelli on behalf of TE/MSC/MM section
MQY-30: Measurement of magnetic cross-talk with imbalanced powering L. Fiscarelli on behalf of TE/MSC/MM
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
HQ02 Magnetic Measurements Prelim. Results Overview 28Jun2013.
HQ02 Magnetic Measurements Prelim. Results Overview 28Jun2013.
L. Fiscarelli, S. Izquierdo Bermudez, O. Dunkel, S. Russenschuck, G. Willering, J. Feuvrier 22 nd September 2015.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
Field Model for the Multipoles Factory FQWG, 17/3/2004 S.Amet, L.Deniau, M.Haverkamp, L.Larsson, T.Pieloni, S.Sanfilippo, M. Schneider, R. Wolf, G.Ambrosio.
SCU1 Vertical Test Results Matt Kasa 9/16/2014. Vertical Cryostat Assembly Coil Training Record the current decay and the terminal voltage across the.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
Susana Izquierdo Bermudez, Lucio Fiscarelli. Susana Izquierdo Bermudez Contents Transfer function Geometric Allowed harmonics Non allowed harmonics Inter.
L. Fiscarelli, O. Dunkel, S. Russenschuck, S. Izquierdo Bermudez, G. Willering, J. Feuvrier 21 st July 2015.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
Update on Q4 DSM/IRFU/SACM The HiLumi LHC Design Study (a sub-system of HL-LHC) is partly funded by the European Commission within the Framework Programme.
Cold test of SIS-300 dipole model Sergey Kozub Institute for High Energy Physics (IHEP), Protvino, Moscow region, Russia.
November 19, 2008 SLAC Linear Collider Department Slide 1 ILC Superconducting Quadrupole Characterization J. C. Sheppard, Cherrill Spencer, et al. SLAC.
AT/MTM, August 2004 Quench Test Results obtained with The Local Quench Antennas on selected magnets M. Calvi S. Kouzue A. Forrester E. Floch P. Pugnat.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
SC Quadrupole Discussion Chris Adolphsen. Comments from Fernando Toral on SC Development for XFEL and ILC.
Presentation 7/05/2015 Giordana Severino ESR2.2, WP2 CERN Supervisors Marco Buzio Academic supervisor Prof. Pasquale Arpaia.
Analysis of magnetic measurements 11-T single-aperture demonstrator built and tested at FNAL B. Auchmann, M. Karppinen, D. Tsirigkas for the 11-T collaboration.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Perturbation of vacuum magnetic fields in W7X due to construction errors Outline: Introduction concerning the generation of magnetic islands Sensitivity.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
Cold powering test results of the 11 T cosθ model magnets at CERN Gerard Willering With thanks to Jerome Feuvrier, Vincent Desbiolles, Hugo Bajas, Marta.
17 th April 2007 Nicholas J. Sammut Decay Prediction and Minimisation During LHC Operation University of Malta Field Quality Working Group with several.
Magnetic measurements on MBHSP104
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Model magnet test results at FNAL
TQS Structure Design and Modeling
11 T cable development and procurement strategy at CERN
CLAS12 Torus Magnetic Field Mapping
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
EuroCirCol: 16T dipole based on common coils
Update on test results MBHDP102 Re-discussion of test program
Status of MB Data Retrieval
DS11 T Transfer function, integral field and coil length
MBHSP02 test STATUS and first results
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Flux jumps in HQ Hugo BAJAS
HQ01 field quality study update
Long term behavior and high-QI test in the MQXFS program
Magnetic measurements at ambient temperature on the MQXFBP1
On reproducibility From several inputs of N. Sammut, S. Sanfilippo, W. Venturini Presented by L. Bottura LHCCWG
Magnetic measurements on the MQXFS6b at ambient temperature
Presentation transcript:

L. Fiscarelli O. Dunkel, J. Feuvrier, S. Izquierdo Bermudez, G. Willering International Review of the HL-LHC 11 T Dipole for DS collimation December 2014

Click here to add footer 2 Outline Magnetic measurement systems Measurement results TF Allowed multipoles Other multipoles σ of multipoles and mechanical tolerances Ramp rate dependence Magnetization Field repeatability Effect of temperature New measurement shafts Conclusions L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014

Click here to add footer 3 Measurement system 300 K o Motor + encoder + slip-ring unit (MRU) o Fast Digital Integrator (FDI) o FuG low voltage power supply (40 V, 20 A) o DCCT Hitec MACC-plus o Search coil shafts (radius 22 mm, length 1.2 m) o Flexible software Framework for Magnetic Measurements (FFMM) Number of turns(-)256 Inner width(mm)13.41 Inner length(mm) Groove thickness(mm)1.4 Magnetic surface(m 2 ) Center radius(mm) L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 A measurement is an average over 1.2 m

Click here to add footer 4 Measurement system 1.9 K o Flexible software Framework for Magnetic Measurements (FFMM) o Fast Digital Integrators (FDI) o Motor + encoder + slip-ring unit (MRU) o Vertical rotating shaft in liquid He L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Number of turns(-)150 Inner width(mm)6.43 Inner length(mm) Groove thickness(mm)0.80 Magnetic surface(m 2 ) Center radius(mm)18.91 pos. 1 pos. 2 pos. 3 pos. 4 pos. 5 A measurement is an average over 250 mm

Click here to add footer 5 At 1.9 K  -30 units measured on geometric  +55 units measured on saturation at 11 kA At 300 K  +50 units measured on geometric Transfer function L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Measurements vs model 300K I20A center50units 1.9K I411kA pos units pos units pos units

Click here to add footer 6 Stair-step cycle Simulated machine cycle Allowed multipoles  25 unit of change during up-ramp from 760  Decay and snap─back of ~1.2 units L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Reference radius 17 mm

Click here to add footer 7 Other multipoles L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 centerpos 1pos 2pos 3 Temp K TF9.987E E E E-04T/A nbnanbnanbnanbnan units at 17 mm Reference radius 17 mm

Click here to add footer 8 σ of multipoles and tolerances L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 measurementstolerances σ TF units at 17 mm nσ bnσ anσ bnσ an  σ of measured multipoles is compatible with random block displacements of 60  m  small sample size for statistics Reference radius 17 mm

Click here to add footer 9 Ramp rate dependence L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 A/s  b n at 5 kA (units)  a n at 5 kA (units) Small ramp-rate effects both on TF and multipoles. Stainless steel core works well. Reference radius 17 mm

Click here to add footer 10 Magnetization at 1.9 K  Difference on measured/modelled magnetization contribution on TF  Better agreement on b 3 L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Reference radius 17 mm

Click here to add footer 11 Field repeatability L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014  The field is repeatable within the measurement precision both for TF and multipoles Reference radius 17 mm

Click here to add footer 12 Effect of temperature Magnetization contribution results to be  larger at 1.9 K on TF  smaller at 1.9 K on b 3 Measurements at 4.3 K show noise due to flux jumps L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Courtesy of L. Bottura

Click here to add footer 13 Field repeatability at low current L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 At 1.9 K  Noise up to 600 A  Both on TF and multipoles At 4.3 K  No noise at low current  Noise of smaller amplitude at higher current

Click here to add footer 14 New shaft for 2-m models at 1.9 K Design  7 sectors  Dipole compensation scheme (3 tangential coils/sector)  l = 434 mm to cover the coil heads, end field and splice region  l = 249 mm in the straight part  Measurement radius of 22 mm  Full rotation symmetry for high rotation speed  Possible use for quench location Production baseline  Design ready, orders placed  Delivery expected Dec  Coil winding Jan  Assembly and Calibration Feb  Shaft operational end Feb L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014

Click here to add footer 15 New shaft for models at 300 K L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Production baseline o Design ready, inquiries under way o Delivery expected mid Feb o Coil winding Feb./Mar o Assembly and Calibration Mar./Apr o Shaft operational end Apr Shaft design o 3 sectors, l = 130 mm/each o 5 tangential coils/sector – due to an existing standard o Measurement radius 22 mm o Horizontal position

Click here to add footer 16 Conclusions MBHSP101 has been tested at room temperature cryogenic temperature Measured geometric TF results to be in agreement with model Saturation seems to be overestimated by the model Difference on measured/modelled magnetization contribution on TF Allowed multipoles are in agreement with model Non-allowed multipoles are compatible with mechanical tolerances of 60  m Low ramp rate dependence as expected Noise from flux jumps noticeable L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014

Click here to add footer 17 Annex 1: voltage jumps at 1.9 K L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014 Courtesy of G. Willering

Click here to add footer 18 Annex 2: current cycles L. Fiscarelli International Review of the HL-LHC 11 T Dipole for DS collimation, December 2014