April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

National CAD Standard In a world where globalization is invading and distinction is becoming the rule, We feel the urge to pass some of the knowledge.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Commercial Building Project Portfolio
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Systems Engineering Management
Primary Residential Design Considerations
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Design & Layout of Foodservice Facilities
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Project Management Requirements
Forging new generations of engineers. CEA Presentations.
Organizing Your Information
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
3TB Project Review Tax Increment Financing (“TIF”) Overview January 25, 2013.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
Preparing the Bid Package (A Developers Perspective)
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
US Army Corps of Engineers BUILDING STRONG ® Keys to a Successful AE Contract David Yankey, PE Chief, Army and Air Force Section Engineering Management.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Construction of a Transfer Station
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
Requirement engineering & Requirement tasks/Management. 1Prepared By:Jay A.Dave.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CEE 578 Senior Capstone Design Types of Construction Drawings
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Session 1: Identifying Construction Drawings and Drawing Components.
Camera PDR/CD1 Planning 19 September 2008
Conventional Facilities and Siting Global Group (ARCFS)
BIM EXECUTION PLANNING PROCESS
Construction Documents
Airport Planning.
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Commercial Building Project Portfolio
BIM EXECUTION PLANNING PROCESS
Presentation transcript:

April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction

April 5, 2005 PPD Informal FLARE Review T. Lackowski 2 Engineering Plan Proposed Services –Participate in meetings. –Continue to help formulate criteria. –Develop a Project Definition Report. Contacts –Tom Lackowski will be the FESS primary contact. –Others in FESS will be utilized as required –Criteria and requirements should be funneled through a single point of contact to myself.

April 5, 2005 PPD Informal FLARE Review T. Lackowski 3 Project Definition Report Describe a snapshot of the project requirements and provide a design solution, on a specific site using text, drawings, and cost estimate. Can be developed into a CDR or used as a scope document for an A&E. Civil scope includes site improvements, utilities, buildings, and tank foundation.

April 5, 2005 PPD Informal FLARE Review T. Lackowski 4 Elements of a Project Definition Report Descriptive text –Stating project criteria –Design solutions –Design requirements (Environmental, site and building codes, funding body requirements)

April 5, 2005 PPD Informal FLARE Review T. Lackowski 5 Elements of a Project Definition Report Drawings –Aerial or Road Map Shows overall location, relationship to cities, rail, roads, power transmission lines. –Site Plan Shows local roads, site access, tank and building locations, containment provisions –Site Section –Detailed Site Plans at Tank and Buildings

April 5, 2005 PPD Informal FLARE Review T. Lackowski 6 Elements of a Project Definition Report Building Plans Showing equipment and space layout. Criteria bubbles –Space Requirements –Creature comforts and equipment requirements (Temperature, humidity, process systems, fire protection, electrical)

April 5, 2005 PPD Informal FLARE Review T. Lackowski 7 Elements of a Project Definition Report Basis of cost estimate Cost Estimate (25% to 50% contingency level) Construction Schedule

April 5, 2005 PPD Informal FLARE Review T. Lackowski 8 Criteria Currently there is a general understanding of criteria. Prior to increasing our effort (to 4 or 5 engineers) we need to solidify and get more specific space and utility requirements. I believe most of the criteria is known, but it still needs refinement, including documentation.

April 5, 2005 PPD Informal FLARE Review T. Lackowski 9 Design Solution While the needed civil construction is all pretty standard there are a number of unique issues to address. –Site selection –Spill containment and environmental issues –Protection from forest fires –Rail spur –Existing site information gathering –Water for hydro testing

April 5, 2005 PPD Informal FLARE Review T. Lackowski 10 FESS Engineering Civil, Environmental, Architectural, Structural,Fire Protection / Detection, Mechanical (HVAC & Process Systems), Electrical and Construction Management. The anticipated effort required is consistent with our (Fess/Eng.)current workload projections.

April 5, 2005 PPD Informal FLARE Review T. Lackowski 11 Time frame We will need about two months to complete the Project Definition Report to a final draft for review after major criteria is understood. (Approx. 200 hrs after criteria is understood) Once a site is selected, partnering with a local engineering firm to establish the existing site features would be cost effective. ($10 to $15K)