Task Group Study of Extended Time PEI Tests on an Oil Matrix ESCIT Meeting 2007 August 9 Midland, Michigan Presented by: Ted Selby Task Group Chair.

Slides:



Advertisements
Similar presentations
EVAULATION OF THE NSCRG SCHOOL SAMPLE Donsig Jang and Xiaojing Lin Third International Conference on Establishment Surveys Montreal, Canada, June 21, 2007.
Advertisements

HAWKES LEARNING SYSTEMS Students Matter. Success Counts. Copyright © 2013 by Hawkes Learning Systems/Quant Systems, Inc. All rights reserved. Section 12.2.
Mehlich 3 Evaluation Robert O. Miller ALP Technical Director Colorado State University Fort Collins, CO SERA-6 Meeting, Raleigh, NC, June 21, 2011 Miller,
Important Points The SWF stands for Standard Workload Form. Workload is covered by Article 11 in the collective agreement. Your SWF is your personal contract.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Hydrogen Production Decisions: Decision Making in View of Differing Stakeholder Preferences Elvin Yuzugullu Doctoral Candidate The George Washington University.
1 Some Tips on Comprehensive Exams in Sociology at UBC Fall 2010.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
FOUNDATIONS OF NURSING RESEARCH Sixth Edition CHAPTER Copyright ©2012 by Pearson Education, Inc. All rights reserved. Foundations of Nursing Research,
SOCIAL SCIENCE INQUIRY MODEL
1 CHAPTER M4 Cost Behavior © 2007 Pearson Custom Publishing.
Chemometrics Method comparison
Faculty Affairs presents:.  Conditions of Appointment  Lecturer Evaluation Process  Reappointment  Entitlements  Order of Assignment  Salary  New.
West Contra Costa USD Update on Bonding Capacity Waiver Presentation to the Board of Education May 28, 2014.
ASSESSMENT OF STUDENT LEARNING Manal bait Gharim.
Marco Ferro, Director of Public Policy Larry Nielsen, Field Consultant With Special Guest Stars: Tammy Pilcher, President Helena Education Association.
© 2003 Prentice-Hall, Inc.Chap 6-1 Business Statistics: A First Course (3 rd Edition) Chapter 6 Sampling Distributions and Confidence Interval Estimation.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
+ The Practice of Statistics, 4 th edition – For AP* STARNES, YATES, MOORE Chapter 8: Estimating with Confidence Section 8.1 Confidence Intervals: The.
Rate Reform Research and Communications Committee April 7, 2011.
Methods/Variable Table. In order to conduct research, investigators should first understand what exactly needs to be documented, analyzed and/or measured.
KENT TEST 2015.
0 Technical Study Implementation Potential Disagreements Content of Progress Report Request for Modification to Approved Studies Request for New Study.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
1 U.S.-Brazil Commercial Dialogue Digital Videoconference Series on Standards 4th Topic: Bioethanol Standardization July 20, 2007 Presented by Frances.
USCEL Third Run EMI Round Robin Roland Gubisch Intertek.
Brian Macpherson Ph.D, Professor of Statistics, University of Manitoba Tom Bingham Statistician, The Boeing Company.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
1 Afton ESCIT Report An Analysis of Sequence IIIG Reference Oil Data Phosphorus Retention - and Volatile Phosphorus Throughput December 12, 2006.
Bernie Kinker June 14, 2007 RohMax Oil Additives ROBO For ESCIT.
Phosphorus Emission Index (PEI) Studies Of ZDDP in Engine Oils ESCIT Meeting, 2006 August 8 At Toyota Technical Center Ann Arbor, Michigan Presented by:
1 Proposal for Phosphorus Emission Index Inclusion in GF-5 ESCIT Meeting April 24, 2007 Presented by: Ted Selby Savant, Inc.
 Job evaluation is the process of systematically determining the relative worth of jobs to create a job structure for the organization  The evaluation.
Sub-regional Workshop on Census Data Evaluation, Phnom Penh, Cambodia, November 2011 Evaluation of Age and Sex Distribution United Nations Statistics.
MSDWT Teacher Evaluation Information.  The primary evaluator will assign the final rating  The primary evaluator will take the lead on any Performance.
Playground Settings and the Impact of Recess on Classroom Attention Christine Peterson, B.A., M.S.E. Psychology Department Human Development Center University.
ESCIT Tuesday April 24, Agenda Welcome & Exit Ballot Review – Murray Welcome & Exit Ballot Review – Murray Stakeholder presentations Stakeholder.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
1 Module One: Measurements and Uncertainties No measurement can perfectly determine the value of the quantity being measured. The uncertainty of a measurement.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Sample Size Determination
1 Phosphorus Emission Index Studies of, and Correlation with, Taxi Fleet Engine Oils ESCIT Meeting, GM PowerTrain Presented by: Ted Selby, Savant, Inc.
Chapter 7 Estimates, Confidence Intervals, and Sample Sizes
ISM Test Development Task Force Report June 21, 2004.
ESCIT Objectives ESCIT is charged to define lube oil effect on catalyst performance, not just to develop a P volatility test ESCIT should consider both.
GCSE CHILD DEVELOPMENT. Summary of Assessment Unit 1 Written Paper 1½ hours (40% final mark, one tier only) Unit 2 Controlled Assessment – Child Study.
PEI as a measure of ZDDP volatility in the engine 1 Phosphorus Emission Index (PEI) Studies Of ZDDP in Engine Oils ESCIT Meeting, 2006 May 4 At Afton Chemical.
Early Identification of Introductory Major's Biology Students for Inclusion in an Academic Support Program BETHANY V. BOWLING and E. DAVID THOMPSON Department.
Writing business reports INTRODUCTIONINTRODUCTION BODYBODY CLOSINGCLOSING.
GF-5 Emissions System Compatibility Improvement Team Chris Engel Report to ILSAC / OIL 9/28/06.
Cat Aeration Task Force Additional Prove Out Testing Proposal 1 PC-11 Statisticians Task Force July 1, 2014.
The symbol is a service mark of Afton Chemical Corporation. Support for a Phosphorus Volatility Specification in GF-5 Report to ESCIT June 14, 2007 Greg.
Abstract A longitudinal study designed to follow children of alcohol and drug dependent fathers from adolescence into adulthood RISK began in 1993 and.
Standards of Achievement for Professional Advancement District 2 Career Ladder Training April 29, 2016 Ronda Alexander & Michael Clawson.
1 Economically Active Population Survey Dong-Wook JEONG Employment Statistics Div. Statistics Korea.
The Math Studies Project for Internal Assessment   Personal research   Relate to student’s own interest   Use mathematical tools from the syllabus.
ESCIT Ballot January 8, Ballot Results Sequence IIIG preferred by a majority of the members –Sequence IIIG-EOT was the preferred duration Secondary.
National Institute Of Standards and Technology Technology Administration, U.S. Department of Commerce Power Loading Effects in Precision 1  Resistors.
Information for Students and Parent(s)/Guardian(s)
IEEE AES Society Proposed ByLaw Change for Board of Governors Election
Commercial Operations Sub-Committee Update to TAC
Using the Seq. IIIG to Reliably Provide Catalyst Protection
Analysis by: Kevin Gallagher (PPG Industries) Sept 26, 2017
Have Instrument, make method; How new methods are made and validated
TECHNICAL COMMUNICATION 1
MPSC Transplant Program Performance Measures (Outcome Measures)
Understanding Standards: An Overview of Course Assessment
Presentation transcript:

Task Group Study of Extended Time PEI Tests on an Oil Matrix ESCIT Meeting 2007 August 9 Midland, Michigan Presented by: Ted Selby Task Group Chair

Scope and Objectives: Scope 1.The Scope of the Phosphorus Emissions Bench Test Task Group is to determine the optimum test length for the PEI(165) protocol to obtain best correlation with field and engine tests. 2.The Scope of the Task Group also includes the setting of Objectives. Objectives 1.To determine, through designed bench studies utilizing the Selby-Noack instrument, the optimum test length that will provide best correlation with data from taxi fleet and engine data. 2.To report the data gathered to the parent ESCIT group with recommendations regarding a subsequent round robin conducted under the auspices of ASTM Committee D02 and its Subcommittee B, Section 7.

Background: Task Group appointed at previous ESCIT meeting, June 14 th

Oils included in the study were selected by Task Group based on two criteria: 1.Oils would include ZDDP products from all four manufacturers. 2.Oils should, if available, carry some background engine performance data.

The PEI testing matrix was selected as being: All of the 16-hour tests had been run on either the newly submitted matrix oils or on their previous samples, so the 16- hour runs were not repeated. No 64-hour tests were scheduled until the matrix to 48 hours was completed (July 31 st ). The 48-hour work led to choice of four oils 64-hour analyses as shown by the blue highlighting and this work is now ongoing.

Results of the Task Group study and prior work on Matrix oils up to 48 hours:

When the results of the Task Group study are graphed, the matrix oils fall into two groups:

The PEI of these matrix oils could not be compared on the basis of one type of engine test and it was suggested that a ranking approach would show reasonable uniformity in ranking the oils. With the exception of the atypical FT-33 and the unknown precision of PEI(165-T), ranking of oils through the aging remained uniform.

A question of the agreement of two ICP methods of determining phosphorus content led to a small cooperative study:

Regarding the determination of phosphorus in the volatilized samples, statistical analysis showed very good agreement:

Chairman’s observations and recommendations: Observations : 1.The primary objectives of the Task Group have been met through due diligence over the last eight weeks. 2.A matrix of eight oils have been evaluated at extended test intervals of 32 and 48 hours. 3.It has been indicated by these tests that the present level of good correlation with different engine tests is not likely to be improved by extending the length time of the PEI(165) protocol. 4.For test precision and conservation of time and effort, it is preferable to run the shortest test that will provide an acceptable level of correlation.

Chairman’s observations and recommendations: Recommendations 1.That the work of the Task Group be continued in collecting the data from remaining 64- and repeat 48-hour tests. 2.That the present Task Group or a new group be charged with setting up and conducting a round robin using the PEI(165-16) protocol under the auspices of the ASTM Committee D02. 3.That the Task Group Chairman as present sponsor of the PEI(165-16) bench test provide a timeline chart for the ESCIT Chair within one week to meet the ESCIT Chair’s need.

Chairman’s personal observations on JAMA engine correlation data: 1.Correlation between bench test and engine test is almost always affected much more by the engine test repeatability than the bench test, which usually fairly repeatable. 2.The JAMA engine tests were run at 85° and 135°C while the PEI test is run at 165°C. 3.It is thus somewhat surprising that the correlations shown were in some cases as good as they were (ranging up to R² values of 0.56) considering the temperature dependence of ZDDP decomposition. 4.For meaningful comparison between PEI(165-16) and the JAMA oil #2, #4, and #5, higher temperature engine tests are needed. 5.Another interesting alternative would be to obtain data using the PEI protocol at 135°C. (PEI studies have been made and reported at temperatures of 120°C that have shown correlation with engine tests.)