Helsinki University of Technology Systems Analysis Laboratory EURO 2009, Bonn Supporting Infrastructure Maintenance Project Selection with Robust Portfolio.

Slides:



Advertisements
Similar presentations
Teknillinen korkeakoulu Systeemianalyysin laboratorio 1 Graduate school seminar Rank-Based DEA-Efficiency Analysis Samuli Leppänen Systems.
Advertisements

Design of the fast-pick area Based on Bartholdi & Hackman, Chpt. 7.
Developing the Strategic Research Agenda (SRA) for the Forest-Based Sector Technology Platform (FTP) RPM-Analysis Ahti Salo, Totti Könnölä and Ville Brummer.
Minimum Clique Partition Problem with Constrained Weight for Interval Graphs Jianping Li Department of Mathematics Yunnan University Jointed by M.X. Chen.
Optimization problems using excel solver
ECE 667 Synthesis and Verification of Digital Circuits
Principal Component Analysis Based on L1-Norm Maximization Nojun Kwak IEEE Transactions on Pattern Analysis and Machine Intelligence, 2008.
Approximation Algorithms Chapter 14: Rounding Applied to Set Cover.
1 Helsinki University of Technology Systems Analysis Laboratory Robust Portfolio Modeling for Scenario-Based Project Appraisal Juuso Liesiö, Pekka Mild.
1 Ratio-Based Efficiency Analysis Antti Punkka and Ahti Salo Systems Analysis Laboratory Aalto University School of Science P.O. Box 11100, Aalto.
Helsinki University of Technology Systems Analysis Laboratory RPM – Robust Portfolio Modeling for Project Selection Pekka Mild, Juuso Liesiö and Ahti Salo.
Helsinki University of Technology Systems Analysis Laboratory RICHER – A Method for Exploiting Incomplete Ordinal Information in Value Trees Antti Punkka.
1 Helsinki University of Technology Systems Analysis Laboratory Multi-Criteria Capital Budgeting with Incomplete Preference Information Pekka Mild, Juuso.
Value of flexibility in funding radical innovations E. Vilkkumaa, A. Salo, J. Liesiö, A. Siddiqui EURO INFORMS Joint meeting, Rome, Jul 1 st -4 th 2013.
Introduction to Management Science
Linear Programming Integer Linear Models. When Variables Have To Be Integers Example – one time production decisions –Fractional values make no sense.
Introduction to Management Science
Linear Programming Optimal Solutions and Models Without Unique Optimal Solutions.
S ystems Analysis Laboratory Helsinki University of Technology A Preference Programming Approach to Make the Even Swaps Method Even Easier Jyri Mustajoki.
S ystems Analysis Laboratory Helsinki University of Technology Decision Support for the Even Swaps Process with Preference Programming Jyri Mustajoki Raimo.
Helsinki University of Technology Systems Analysis Laboratory A Portfolio Model for the Allocation of Resources to Standardization Activities Antti Toppila,
Helsinki University of Technology Systems Analysis Laboratory 1 London Business School Management Science and Operations 1 London Business School Management.
9-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Multicriteria Decision Making Chapter 9.
Multicriteria Decision Making
S ystems Analysis Laboratory Helsinki University of Technology Using Intervals for Global Sensitivity and Worst Case Analyses in Multiattribute Value Trees.
9-1 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Multicriteria Decision Making Chapter 9.
1 Helsinki University of Technology Systems Analysis Laboratory Robust Portfolio Selection in Multiattribute Capital Budgeting Pekka Mild and Ahti Salo.
Helsinki University of Technology Systems Analysis Laboratory Ahti Salo and Antti Punkka Systems Analysis Laboratory Helsinki University of Technology.
1 Helsinki University of Technology Systems Analysis Laboratory Robust Portfolio Modeling in the Development of National Research Priorities Ville Brummer.
Binary decision diagrams for computing the non-dominated set July 13, 2015 Antti Toppila and Ahti Salo 27th European Conference on Operational Research,
1 Helsinki University of Technology Systems Analysis Laboratory Rank-Based Sensitivity Analysis of Multiattribute Value Models Antti Punkka and Ahti Salo.
1 Helsinki University of Technology Systems Analysis Laboratory RPM-Explorer - A Web-based Tool for Interactive Portfolio Decision Analysis Erkka Jalonen.
1 S ystems Analysis Laboratory Helsinki University of Technology Kai Virtanen, Raimo P. Hämäläinen and Ville Mattila Systems Analysis Laboratory Helsinki.
Optimal Power Control, Rate Adaptation and Scheduling for UWB-Based Wireless Networked Control Systems Sinem Coleri Ergen (joint with Yalcin Sadi) Wireless.
Helsinki University of Technology Systems Analysis Laboratory Determining cost-effective portfolios of weapon systems Juuso Liesiö, Ahti Salo and Jussi.
Stochastic Linear Programming by Series of Monte-Carlo Estimators Leonidas SAKALAUSKAS Institute of Mathematics&Informatics Vilnius, Lithuania
1 Helsinki University of Technology Systems Analysis Laboratory INFORMS 2007 Seattle Efficiency and Sensitivity Analyses in the Evaluation of University.
Chapter 9 - Multicriteria Decision Making 1 Chapter 9 Multicriteria Decision Making Introduction to Management Science 8th Edition by Bernard W. Taylor.
Helsinki University of Technology Systems Analysis Laboratory INFORMS Seattle 2007 Integrated Multi-Criteria Budgeting for Maintenance and Rehabilitation.
1 Helsinki University of Technology Systems Analysis Laboratory Selecting Forest Sites for Voluntary Conservation in Finland Antti Punkka and Ahti Salo.
Goal Programming Linear program has multiple objectives, often conflicting in nature Target values or goals can be set for each objective identified Not.
1 Helsinki University of Technology Systems Analysis Laboratory Selecting Forest Sites for Voluntary Conservation with Robust Portfolio Modeling Antti.
Helsinki University of Technology Systems Analysis Laboratory Antti Punkka and Ahti Salo Systems Analysis Laboratory Helsinki University of Technology.
Soham Uday Mehta. Linear Programming in 3 variables.
Optimal revision of uncertain estimates in project portfolio selection Eeva Vilkkumaa, Juuso Liesiö, Ahti Salo Department of Mathematics and Systems Analysis,
Prioritizing Failure Events in Fault Tree Analysis Using Interval-valued Probability Estimates PSAM ’11 and ESREL 2012, Antti Toppila and Ahti.
Exact Differentiable Exterior Penalty for Linear Programming Olvi Mangasarian UW Madison & UCSD La Jolla Edward Wild UW Madison December 20, 2015 TexPoint.
Helsinki University of Technology Systems Analysis Laboratory Portfolio and Scenario Analysis in the Cost-Effectiveness Evaluation of Weapon Systems Jussi.
1 Inventory Control with Time-Varying Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
1 Helsinki University of Technology Systems Analysis Laboratory Fostering the Diversity of Innovation Activities through e-Participation Totti Könnölä,
11 Ahti Salo, Juuso Liesiö and Eeva Vilkkumaa Department of Mathematics and Systems Analysis Aalto University School of Science and Technology P.O. Box.
Helsinki University of Technology Systems Analysis Laboratory Incomplete Ordinal Information in Value Tree Analysis Antti Punkka and Ahti Salo Systems.
Selecting a portfolio of actions with incomplete and action-dependent scenario probabilities E. Vilkkumaa, J. Liesiö, A. Salo EURO XXVII Glasgow 12 th.
1 School of Science and Technology Systems Analysis Laboratory Graduate school seminar presentation Current research topics in Portfolio Decision.
1 S ystems Analysis Laboratory Helsinki University of Technology Master’s Thesis Antti Punkka “ Uses of Ordinal Preference Information in Interactive Decision.
1 Ratio-Based Efficiency Analysis (REA) Antti Punkka and Ahti Salo Systems Analysis Laboratory Aalto University School of Science and Technology P.O. Box.
Efficient Point Coverage in Wireless Sensor Networks Jie Wang and Ning Zhong Department of Computer Science University of Massachusetts Journal of Combinatorial.
1 Helsinki University of Technology Systems Analysis Laboratory Standardization Portfolio Management for a Global Telecom Company Ville Brummer Systems.
Mustajoki, Hämäläinen and Salo Decision support by interval SMART/SWING / 1 S ystems Analysis Laboratory Helsinki University of Technology Decision support.
1 2 Linear Programming Chapter 3 3 Chapter Objectives –Requirements for a linear programming model. –Graphical representation of linear models. –Linear.
CS4234 Optimiz(s)ation Algorithms L2 – Linear Programming.
Learning to Align: a Statistical Approach
An Algorithm for Multi-Criteria Optimization in CSPs
Goal programming.
Incomplete ordinal information in value tree analysis and comparison of DMU’s efficiency ratios with incomplete information Antti Punkka supervisor Prof.
Decision support by interval SMART/SWING Methods to incorporate uncertainty into multiattribute analysis Ahti Salo Jyri Mustajoki Raimo P. Hämäläinen.
Linear Programming Integer Linear Models.
Linear Programming Integer Linear Models.
Juuso Liesiö, Pekka Mild and Ahti Salo Systems Analysis Laboratory
Integer Linear Programming
Presentation transcript:

Helsinki University of Technology Systems Analysis Laboratory EURO 2009, Bonn Supporting Infrastructure Maintenance Project Selection with Robust Portfolio Modelling (RPM) Juuso Liesiö, Pekka Mild and Ahti Salo Systems Analysis Laboratory Helsinki University of Technology P.O. Box 1100, TKK, Finland

Helsinki University of Technology Systems Analysis Laboratory 2EURO 2009, Bonn Road Asset Management in Finland n Central authority Finnish Road Administration (Finnra) –Annual funding on maintenance and repair some 600 Mє –Central administration and 9 road districts –Need for multiple criteria optimization tools to support asset management –Collaboration with Systems Analysis Laboratory since 2004 n This presentation: RPM to support district level bridge repair programming –Which of candidate repair projects to select under limited resources and multiple value criteria? –Hundreds of repair projects → need for approximate optimization algorithms

Helsinki University of Technology Systems Analysis Laboratory 3EURO 2009, Bonn RPM-Model for Bridge Repair Programming n Annually some m= candidate projects –Repair program (= portfolio of projects) for three years »Not scheduled year by year –Repair budget of 9,000,000€ –Maximum of 90 bridges »Limited availability of equipment and personnel etc. –Must repair at least 15,000 ‘damage units’ n Additive-linear value 6 repair urgency criteria »E.g. Sum of damages, Average daily traffic, Road salt usage, Outward appearance → Integer linear programming (ILP) problem

Helsinki University of Technology Systems Analysis Laboratory 4EURO 2009, Bonn Incomplete Preference Information in RPM n Set of feasible criterion weights instead in point estimates –Criteria 1 and 2 most important –Criteria 5 and 6 least important n Interval scores instead in point estimates »e.g. daily traffic is between 3000 and 4000 vehicles n Non-Dominated portfolios –No other feasible portfolio has a greater overall value for all feasible weights and scores Value w2≥w1w2≥w1 ND-portfolios: z 1, z 2, z 3 z1z1 z3z3 z2z2 z4z4

Helsinki University of Technology Systems Analysis Laboratory 5EURO 2009, Bonn Approximate Computation of ND-portfolios (1/3) n What does not work: –Exact dynamic programming algorithm (Liesiö et al. 2008) due to curse of dimensionality –Maximizing value (ILP) with random w,v »e.g. z 2 does not maximize value for any w n New approach: –Measure the value difference in each extreme point w i to a ”utopian portfolio” V* i –Distance: maximum of weighted differences max i λ i (V* i -V(z,w i )) (max-norm) Value utopian portfolio z1z1 z2z2 z3z3 z4z4 λ 1 =λ 2 z1z1 z2z2 z3z3 z4z4

Helsinki University of Technology Systems Analysis Laboratory 6EURO 2009, Bonn Approximate Computation of ND-portfolios (2/3) n Theorem 1.Any ND-portfolio minimizes distance for some v and λ 2.For any v and λ there exists at least one ND-portfolio among the portfolios that minimize the distance n With given v and λ, minimizing distance to utopian portfolio over feasible portfolios is a MILP-problem »t is the number of extreme points in S w

Helsinki University of Technology Systems Analysis Laboratory 7EURO 2009, Bonn Approximate Computation of ND-portfolios (3/3) n Algorithm: 1) Sample λ from a simplex and scores v from the intervals 2) Find portfolios that minimize distance to the utopian portfolios by solving the MILP 3) Store the non-dominated ones to a list (remove duplicate portfolios) 4) Go to 1 until sufficient number of ND-portfolios have been found

Helsinki University of Technology Systems Analysis Laboratory 8EURO 2009, Bonn Bridge Repair Programming Results (1/2) n In each case 10,000 ND-portfolios computed –Some 25,000 MILPs solved in ~1 hour n Core Index: The share of ND-portfolios that include the project »Core projects, CI=1, included in all ND-portfolios »Borderline projects, 0<CI<1 included in some »Exterior projects, CI=0, included in none n Average case with some –15% core, 35% borderline, 50% exterior

Helsinki University of Technology Systems Analysis Laboratory 9EURO 2009, Bonn Bridge Repair Programming Results (2/2) n Projects listed in decreasing order of Core Indexes –Scores, costs and other characteristics displayed –Tentative priority list –Found practical and transparent by the programming managers

Helsinki University of Technology Systems Analysis Laboratory 10EURO 2009, Bonn Conclusions n RPM-model for bridge repair programming –Flexible (=usable) multicriteria prioritization of bridge repair project –Academic research created new business –14 cases carried out in »4 by Systems Analysis Laboratory, 10 by Pöyry ltd consulting company n Approximate algorithm extends applicability RPM of in other contexts –Commercial MILP-solvers can tackle problems with hundreds of projects –Any non-dominated portfolio possible to find –Easy to implement –Compared to ILP, only t additional constraints, one continuous variable

Helsinki University of Technology Systems Analysis Laboratory 11EURO 2009, Bonn References Liesiö, Mild, Salo (2008): Robust Portfolio Modeling with Incomplete Cost and Budget Information, European Journal of Operational Research, Vol. 190, pp Liesiö, Mild, Salo (2007): Preference Programming for Robust Portfolio Modeling and Project Selection, European Journal of Operational Research, Vol. 181, pp