LAT-PR-07488-011 GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

First Article Inspection Report
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Dec. 18, 2003 LAT-PR-02590: Grid Manufacturing Readiness Review 1.Introduction Marc Campell.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
First Article Inspection
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
The GNWT Action Plan – The Levelton Report Jan 18, 2011 Yellowknife 1.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
From Research Prototype to Production
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
THEMIS Mission Assurance
ISUAL Product Assurance
2K CB FDR Overview:  Agenda, Charge, Review Process
First Article Inspection
Peer Review Agenda (Suggested).
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
SQA01 Guidance Material: FAI Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
First Article Inspection
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Presentation transcript:

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson Bill Olson

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Agenda 1. Introduction (Olson) –Agenda –Goals of review 2. Overview (Olson) –Hardware to be Fabricated –Summary of Allied’s Purchase Order Terms 3. Engineering Status (Olson, Ku) –Changes since Contract Award –Drawing Status –Analysis Status 4. Manufacturing Plan (Allied) –Block Diagram of MFG flow –Documentation status –Inspection Plan –Schedule 5. Quality Plan (Cullinan) –Quality Assurance Plan 6. Conclusions (Olson) –Summary and Conclusions

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Goals Goals –Approve LAT Test Stand for fabrication –Identify any design or prototyping issues that must be resolved prior to start of fab

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Readiness Review 2. Overview Bill Olson Manufacturing Readiness Review 2. Overview Bill Olson Bill Olson

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Overview Hardware to be Fabricated –LAT Test Stand Assembly –Test Stand Spreader Bars

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Overview Summary of Allied Engineering Purchase Order Terms –Allied shall fabricate and proof load test the Test Stand Assy and Spreader Bars per drawing requirements –Allied shall procure all materials, fabricate, inspect, assemble, and load test the Test Stand Assy. –Allied shall develop a manufacturing plan, inspection plan, Weld/NDE plan, and Proof test plan. –Allied shall provide a data package at the pre-ship review consisting of certifications of conformance, certification of compliance for special processes, discrepancy reports, inspection reports, and proof test certifications. –Allied shall ship the completed assembly to NRL.

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Readiness Review 3.Engineering Status Bill Olson Manufacturing Readiness Review 3.Engineering Status Bill Olson Bill Olson

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Engineering Status Changes since Allied Engineering contract award Sept. 26, drawings were revised –LAT-DS Test Stand Weldment Assy –LAT-DS Test Stand Spreader Bar –LAT-DS Caster Pad Weldment Allied will incorporate these changes at no cost Pending changes –Revise position of cross bar to align Radiator struts to stand. This will be the 03 revision to LAT-DS-06179

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Drawing Status Drawing Status - 8 of 9 released Part NoDescriptionStatus LAT-DS Test Stand Weldment AssyRevision in process LAT-DS Test Stand Spreader BarApproved LAT-DS Lower Extension BeamApproved LAT-DS Upper Extension BeamApproved LAT-DS Caster Pad WeldmentApproved LAT-DS Turnbuckle AssyApproved LAT-DS Leveling FootApproved LAT-DS Test Stand Assy & Load Test ConfigurationsApproved LAT-DS Leveling Foot Threaded RodApproved

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Analysis Status Analysis presented by John Ku at the final design review showed all positive margins of safety. The design review actions were: 1.Thermal stresses (need gradients from Jack); thermally induced stresses between shoes and flexures (incomplete, non-critical) 2.Check overturning moment for stability requirement (complete -- OK) 3. Radiator punch loads and stiffness (complete -- mods made) 4. Calculate effective stiffness needed at radiator strut (complete -- OK) 5. perturbation analysis of leveling pad (incomplete) 6. Single failure point on welds (complete -- OK, no SFP) 7. DMIG LAT and get loads into combined assy (incomplete, non-critical) John addressed items 2, 3, 4, and 6, but items 1, 5, and 7 are still incomplete. He believes these are non-critical because if a problem is found, it can be fixed later, i.e. the fix will not affect the current test stand design.

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Analysis Summary

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Readiness Review 4.Manufacturing Status Allied Engineering Manufacturing Readiness Review 4.Manufacturing Status Allied Engineering Dave

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Test Stand Assembly Mfg Flow

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Documentation Status Shop orders –Complete Project Schedule –Estimated 50 working days – need start date for fabrication - MRR Internal drawings –Drawings released –Procedures/Processes –Vibratory Stress procedure – draft complete –Processes are per MIL specs, Industry standards or Manufacturers instructions QA plan –Detailed plan to be released 3 days after drawing package issued to Allied Engineering Quality Manual –Submitted and reviewed by SLAC MFG plan –Block diagram exists

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 In-Process Testing Cleaning inside of tubing before welding Weld Inspection –Mag-particle/Dye penetrant Vibratory Stress Relief –Used between welding and machining operations –Vendor to evaluate necessity

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Inspection Plan Final dimensional inspection Welds

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Allied’s Schedule

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Readiness Review 5. Fabrication Quality Assurance Manufacturing Readiness Review 5. Fabrication Quality Assurance Joe

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Quality Assurance Plan for Fabrication Approve vendor’s quality system, process control and documentation Review and approve vendor’s manufacturing plan SLAC/LAT QA and Mechanical Systems to witness Test Stand proof load tests Verify test, measurement and inspection data meets LAT program requirements Ensure non-conformances are documented and resolved Review, approve and retain data package Photo documentation Photos taken to document discrepant hardware At mandatory inspect points Conduct pre-ship review

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Manufacturing Readiness Review 6. Conclusions Manufacturing Readiness Review 6. Conclusions Bill Olson

LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 Summary and Conclusions Summary All MFG drawings are released except latest revision for location of Radiator mounting bar on Test Stand Weldment drawing LAT-DS Risk assessment is complete. Allied Engineering is at a sufficient level of readiness to proceed with a plan in place to complete the open items. LAT Quality Plan is in place. Conclusion Proceed with the manufacturing of the Test Stand Assy