MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.

Slides:



Advertisements
Similar presentations
ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon.
Muon Spectrometer Nomenclature Kevin Black/Vivek Jain/Stephane Willocq went through various documents and produced what we think are the correct names.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
L. Pontecorvo MDT Status: Installation and Commissioning 5 Missing 9 stations.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Gnam Monitoring Overview M. Della Pietra, D. della Volpe (Napoli), A. Di Girolamo (Roma1), R. Ferrari, G. Gaudio, W. Vandelli (Pavia) D. Salvatore, P.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Technical Support Activities in PH-ADO-PO
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
1 Possible setup for the H8 test beam F.Cerutti pIntroduction: from H8 Phase I to the system test pPossible setup in : Magnets on the H8 beam.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
1 MuonGeoModel status report focus on issues relevant to , 20 Access to Condition DB with M. Verducci, R. Harrington MDT deformations with I. Logashenco.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
STATUS OF COMPASS. /74 Status of the Collaboration MoU signatures Status of the run – Preparation – Run 18/11/2014COMPASS FRC - 17th meeting2 Outline.
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Broken Hill Solar Plant
PANDA Muon Group Meeting, Protvino 7 June 2011 G
CSP 25th November 2010 Technical agreement number 3: overview
for the transition region on behalf of the RPC upgrade group
Commissioning of the MUON Spectrometers in ATLAS and CMS
F.Guber, A.Ivashkin INR, Moscow
MicroMegas Mechanical Meeting --- Cern April 2014
Installation plans from mid 2005
CMS Goal of the experiment
Muon Installation Status
Plans for the 2004 CSC Beam Test
Presentation transcript:

MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.

Action Items from September meeting Define position of connections and electronics in BMS. –Status: still pending, although accessibility to spacer still available. Possibility to use the space around the ribs Design of BIR, BIM, BMF, BMS, BOG, BOF Supports and Installation Procedures. –Being done, with new Barrel Engineering team. BOF support has been design by MPI. BOG is being design by Freiburg. Evaluate the adjustment procedure for Barrel Brackets and installation of rails, to proceed to main order. –Done, changes have been made, rails follows the brackets to within 1mm. Order for brackets has been placed (no cost to the collaboration). Finalize rail design: –Done, tender is under way (possibility to obtain them at 50% cost) Start construction of Common RPC-MDT Supports. –Done for the first 4. Agreement has been signed with JINR for the full construction, including BML, BMS, BOL, EIL4 and EO supports. Positioning of alignment platforms: –Needs a procedure to calibrate or cross-check: PENDING

Worries related to chamber completion –Lack of Technical manpower and problems of panels fabrication to ensure timely delivery of RPC’s. Action item: hired Protvino manpower to ensure ramp-up to 3 chamber/day; ONGOING Action item: TC has made arrangements with Protvino to ensure timely delivery of panels, in exchange for Protvino manpower. –Outcome: production rate has strongly incresed, but it is not yet sufficient to ensure timely delivery of the chambers. –Very tight schedule in most sites for MDT service completion (see Gregor’s update), but it seems possible.

Financial worries Electronic items not fully covered: –High cost of Mezz-CSM cable: Still a problem. Some lower cost offer has been received from Italian firm. –High cost of Power supplies and cables: Cover power supplies by Italian funds, and try to get additional funds for the LV cables. –CSM (Chamber Service Module) was not part of original design. Michigan has done the design. Full cost has been included in the C-C, US part should be paid from US-MC. Italy, Germany, Holland have asked for the needed funding. It is not clear how to cover the Russian, Greek and Chinese parts. Could be cover with some of the C&I funds. Cash-flow problem could be covered by Resource Coordinator. –ROD crates for MDT (included in C-C, will depend on the contribution from the various funding agencies) Pending

Open issues for MUON Barrel Installation  Defining the routing of services and cable trays (ongoing).  Logistic aspects during installation: after platforms have been defined, need to workout every installation step (November 2003, with new Barrel Engineering Team)  Final Scenario for BIR, BIM installation  Installation time (has been confirmed following the 2003 test)  Understanding magnet deformations (pending).

Forthcoming events.. Prepare and start the chamber assembly and pre-testing before installation. Here we are going to find most of our problems. This is being postponed to the end of 2003, due to availability of components. Start preparation for Short-Term Commission of detector. For the End-Cap, this activity will be organized by Sandro, while Ludovico will start some activity for the Barrel –First program has been shown in the previous two talks. –Ludovico will prepare an organizational meeting for the Barrel institution around the December MUON week. Need to prepare MUON Spectrometer System Commissioning Group (MSSC), that will take us from sub-systems pre-commissioning to an Spectrometer commissioning. Such a group should include: –Commissioning Coordinator (proposals for names should be send to me during next two weeks). –2 Trigger experts from the RPC and TGC communities S. Veneziano, O. Sasaki) –4 ROD experts (from the 4 subsystems) (A. Konig, S. Pier ?, S. Venziano, L. Levinson) –1 Simulation Coordinator (C. Guyot) –2 Alignment experts (J. Bensinger, C. Guyot) – The MUON DIG representative (Speranza) –The two Short-Term Commissioning Coordinators (Sandro and Ludovico)

Proposed Meetings dates for February (ATLAS week) April (with Engineering meeting) June (ATLAS week, if not in Seattle) September December (with Engineering meeting)