Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 December 2013 LAV construction & installation status.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Compressor status AWAKE Technical Board meeting 19 August 2015.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 14 December 2010.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Roman Pots and Microstations based on talk by Jaak Lippmaa Helsinki CERN 2005.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
LAV HV repair plans Matthew Moulson
Installation of the T600 at Fermilab
QXF Coil Fabrication & Tooling Reaction / Impregnation
LAV front-end and readout status
CSP 25th November 2010 Technical agreement number 3: overview
HFM Test Station Main Cryostat
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
Teleconference ACS – FREIA 18th April 2017
News about the WA104 Programme
Far Detector Activities Late 2017 – Early 2018
Prototype cryomodule development
Two-beam Test-stand Design and Construction Status
WA105: Order Status IFAE Thorsten Lux.
Presentation transcript:

Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Summary: Where we stand 2 A1-A3Installed, cabled, read-out in technical run A4-A8Installed, ready for cabling A11At CERN, ready to install A9 & A10 Vessels under construction at Fantini Bananas under construction at Frascati

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 A1-A3 cabling 3 Thanks to Frascati technicians for excellent cable routing!

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 A9-A10: Status of vessels 4 Progress on A9: Vessel rolled and welded Turning of interior on vertical lathe in progress, will finish today End flanges in forged 304L have been prepared on lathe End flanges welded by mid next week (19/12) Pieces in 304L (manhole covers, external supports) sent out for solution treatment (heating) to reduce magnetic permeability Preliminary vacuum test week of 07/01/13 Other progress: A10 vessel rolled Dedicated, enclosed area at Fantini set up for work with stainless steel New set of rotation bars ready, awaiting test

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Rolling of A9 vessel 5

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Rolling of A9 vessel 6

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Welding tests for stainless steel 7 Thanks to C. Capoccia

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Welding tests for stainless steel 8 Thanks to C. Capoccia Welds obtained with TUBE S 964 G are mechanically and structurally good Magnetic properties of 304L similarly unaffected, like for 304LN (μ/μ 0 = 1.05 both before and after welding)

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Work in progress in Frascati 9 A9: 60 of 60 bananas ready A10: 2 bananas ready blocks ready Continue to produce of new blocks

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Modifications for type 9 blocks (A10) 10 Mu-metal housing for PMT is longer for type 9 blocks Small modifications to: Banana hardware Cable routing Cover for oven increase depth 125 mm narrower support

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 11 December 2012 Conclusions 11 Schedule for delivery of A9 and A10 vessels slipped slightly due to experimentation with weld filler material Expect A9 vessel to be delivered week of 11 March 2013 A9 banana assembly complete A10 banana assembly will be complete before A10 delivered