Horizon 2020 Call ICT 7 & ICT 8 5G PPP INFO DAY, Brussels

Slides:



Advertisements
Similar presentations
HOlistic Platform Design for Smart Buildings
Advertisements

Expanding LTE for Devices European Commission Information Society and Media The aim of EXATED is to realise the vision of a new scalable.
All rights reserved © 2006, Alcatel Grid Standardization & ETSI (May 2006) B. Berde, Alcatel R & I.
Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
DG INFSO- Grid Research & Infrastructures: W. Boch, M. Campolargo 1 Delivery of Industrial-strength Grid Middleware: establishing an effective European.
"The views expressed in this presentation are those of the author and do not necessarily reflect the views of the European Commission" Mário Campolargo.
Information Society Technologies programme 1 IST Programme - 8th Call Area IV.2 : Computing Communications and Networks Area.
The role of virtualisation in the dense wireless networks of the future Sokol Kosta CINI.
Advanced 5G Network Infrastructure for the Future Internet From IoT to U-HDTV, ubiquity Restless Pressure on bandwidth, spectrum crunch Complex traffic.
Vehicle-infrastructure integration: creating co-operative mobility systems and services Hearing EU Parliament, 22 January 2009 Hermann Meyer, CEO.
ICT Work Programme NCP Infoday 23 June Maria Geronymaki DG INFSO.H.2 ICT for Government & Public Services Objective.
0 0 0 BBWF Madrid October 2005 Access-independent Core Networks: Converging towards all-IP Andy Jones Head of Transmission & Interconnectivity Vodafone.
End-to-End Efficiency (E 3 ) Integrated Project of the EC 7 th Framework Programme E 3 WP5 Objectives E 3 WP5 Structure and Research Challenges
Towards a Virtual European Supercomputing Infrastructure Vision & issues Sanzio Bassini
European Network Technologies Connecting the Digital Society Future Networks EU Research for the ubiquitous ultrafast Internet of the future enabling every.
Grant agreement n° SDN architectures for orchestration of mobile cloud services with converged control of wireless access and optical transport network.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
The Network of the Future European Research in FP7 Rainer Zimmermann Head of Unit “Future Networks” European Commission DG Information Society and Media.
/17Advanced Radio Interface TechnologIes for 4G SysTems24/03/2011 Project’s Overview Date: Thursday, March 24 th 2011 Alexandre Gouraud (Orange) Canada-EU.
Emerging Research Dimensions in IT Security Dr. Salar H. Naqvi Senior Member IEEE Research Fellow, CoreGRID Network of Excellence European.
Project Results Colin Willcock, Project Coordinator for SEMAFOUR Project.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
Research Activities of IMT-2020 (5G) Promotion Group
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
COnvergence of fixed and Mobile BrOadband access/aggregation networks Work programme topic: ICT Future Networks Type of project: Large scale integrating.
Confidential and proprietary material for authorized Verizon Wireless personnel only. Use, disclosure or distribution of this material is not permitted.
Objective 1.2 Cloud Computing, Internet of Services and Advanced Software Engineering Arian Zwegers European Commission Information Society and Media Directorate.
HORIZON 2020 The EU Framework Programme for Research and Innovation Societal Challenge 6 Topics under DG CONNECT H3 responsibility European Commission,
IP-Based Emergency Applications and Services for Next Generation Networks PEACE Presented by Suji Gunaratne PhD.
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
4G-LTE: Enhancing Efficiency in Organizations. Factors Impacting Digitization Processes and Systems January Powerful Platforms and Devices Storage.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
1 © NOKIA FILENAMs.PPT/ DATE / NN WWRF Status & Direction (Wireless World Research Forum) July 12, 2002 S00VISION A.
The FI-WARE Project – Base Platform for Future Service Infrastructures FI-WARE Interface to the network and Devices Chapter.
Information Society Technologies (IST) Programme 5th EU RTD Framework Programme.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
WP Strategic Objective Networked Audio Visual Systems and Home Platforms.
Main trends affecting research and innovation in the communications networks area Societal drivers: Urbanisation Smart cities Mobility Information availability.
1 BRUSSELS - 14 July 2003 Full Security Support in a heterogeneous mobile GRID testbed for wireless extensions to the.
Jose Jimenez Telefónica I+D Future Network & Mobile Summit 2011 The vision of Future Internet in the FI PPP Core Platform project.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
Motivations for Innovations in Operational Excellence Bruce Rodin VP – Wireless Technology Bell Canada.
STREP Research Project HOBNET (FP7- ICT , ) HOlistic Platform Design for Smart Buildings of the Future InterNET (
Internet of Things. IoT Novel paradigm – Rapidly gaining ground in the wireless scenario Basic idea – Pervasive presence around us a variety of things.
GRID ANATOMY Advanced Computing Concepts – Dr. Emmanuel Pilli.
NCP Info DAY, Brussels, 23 June 2010 NCP Information Day: ICT WP Call 7 - Objective 1.3 Internet-connected Objects Alain Jaume, Deputy Head of Unit.
Technology-enhanced Learning: EU research and its role in current and future ICT based learning environments Pat Manson Head of Unit Technology Enhanced.
5G PPP Stakeholders event From Phase 1 to Phase 2
Phase 2 Pre-structuring Model
Huawei Technologies 1 Technology changes. Communication lasts. AIE Requirements and Competitions.
Leveraging SDN for The 5G Networks: Trends, Prospects and Challenges ADVISOR: 林甫俊教授 Presenter: Jimmy DATE: 2016/3/21 1.
Submission May 2016 H. H. LEESlide 1 IEEE Framework and Its Applicability to IMT-2020 Date: Authors:
IoT R&I on IoT integration and platforms INTERNET OF THINGS
Towards more flexible networks -- backyard of IMT Takashi Egawa NEC Corporation Rapporteur, Q.14, SG13 1.
EUB Brazil: IoT Pilots HORIZON 2020 WP EUB Brazil: IoT Pilots DG CONNECT European Commission.
7 October 2015 NCP Training EU-Japan Joint Call EUJ1 – 2016: 5G – Next Generation Communication Networks.
Name - Date Technology-enhanced Learning: tomorrow’s school and beyond Pat Manson Head of Unit Technology Enhanced Learning Directorate General.
Eric Peirano, Ph.D., TECHNOFI, COO
overview of activities on High Performance Computing
Eric Peirano, Ph.D., TECHNOFI, COO
Progress of Network Architecture Work in FG IMT-2020
Mobile edge computing Report by Weiqing huang.
Werner Mohr, Siemens Networks, Munich, Germany
Dr. Didier Bourse PPP FR Info Workshop Paris
HOLISDER Integrating Real-Intelligence in Energy Management Systems enabling Holistic Demand Response Optimization in Buildings and Districts Project presentation.
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
The roadmap towards the implementation of 5G in Europe
Directorate General Information Society & Media
Presentation transcript:

Horizon 2020 Call ICT 7 & ICT 8 5G PPP INFO DAY, Brussels 21 January 2016 Bernard Barani European Commission – DG CONNECT Deputy Head of Unit "Network Technologies"

Context - 5G Public Private Partnership (PPP) under EU Horizon 2020 R&I programme. 5G PPP dedicated to 5G system Phase 1  Phase 2 of 5G PPP implementation Vision and technological requirements: http://5g-ppp.eu/wp-content/uploads/2015/02/5G-Vi sion-Brochure-v1.pdf Verticals papers, see 5G-PPP web site Working Groups Multiple side developments, standards, spectrum More than projects, a programme: use of contractual clause 41.4

5G PPP Context

5G-PPP Context

5G-PPP Context

ICT 7 – 5G PPP Research and Validation of critical technologies and systems High level Objectives To leverage work and results of phase 1 (WP 2014-15) and to accelerate on proof of concepts and demonstrators → 3GPP, WRC 19 milestones To support a much wider array of requirement than today and with capability of flexibly adapting to different "vertical" application requirements To cover a wide range of services from different use case and application areas/verticals, for increasingly capable user terminals, and for an extremely diverse set of connected machines and things to support a shift from the “Client-Server” model to “Anything” as a Service (XaaS), no need to own HW/SW Network elements will become "computing equivalent" elements that gather programmable resources, interfaces and functions based on virtualisation technologies optimisation of cost functions (capex/opex) and of scarce resources (e.g. energy, spectrum), as well as migration towards new network architectures

ICT 7 – 5G PPP Research and Validation of critical technologies and systems a. Research & Innovation a.1. Strand wireless access and radio network architecture/technologies Novel air interface technologies Hardware architectures, building blocks (Radio) Network functional architectures and interfaces leading to a reference architecture for 5G in support of the forthcoming standardisation work Co-operative operation of heterogeneous access networks integrating virtual radio functions into service delivery networks Support of numerous devices with different capabilities, with unified connectivity management capabilities, in terms of security, mobility and routing Coordination and optimization of user access to heterogeneous radio accesses Multi-tenancy for Radio Access Network (RAN) sharing, covering ultra-dense network deployments Integration of Satellite Networks

a.2. Strand High capacity elastic - optical networks ICT 7 – 5G PPP Research and Validation of critical technologies and systems a. Research & Innovation a.2. Strand High capacity elastic - optical networks Key: core and metro transport capacity/flexibility New spectrally efficient, adaptive transmission, networking, control and management approaches to increase network capacity by a factor of >100 To provide high service granularity, guarantees for end-to- end optimization and QoS - reducing power consumption, footprint and cost per bit and maintaining reach integration of such new optical transport and transmission designs with novel network control and management paradigms (e.g., SDN) Objective: high matching capacity from metro and core in support of het access. Optical transport for metro and core

ICT 7 – 5G PPP Research and Validation of critical technologies and systems a. Research & Innovation a.3. Strand Software Networks Software network architecture to support an access agnostic converged core network and control framework enabling next generation services A unified management of connectivity, with end to end security mobility and routing for flexible introduction of new services. Multi domain Solutions (e.g API's and corresponding abstractions) that allow re-location or anycast search of services and their components Scalability and efficiency related to increasing deployment of software-based network equipment and functions as well as corresponding more diverse services and usages Realisation of the "plug and play vision” for computing, storage and network resources through appropriate abstraction, interfaces, and layering, targeting a Network Operating System (NOS), integration of exp facilities Management and security for virtualised networks (incl. across multiple virtualised domains) and services to support service deployment decisions

ICT 7 – 5G PPP Research and Validation of critical technologies and systems b. Coordination and Support Actions 3 M€ Activities to ensure a sound programmatic view of the implemented 5G Research and Innovation Actions (RIA) and Innovation Actions (IA) results: Programme level integration through management and orchestration of 5G PPP project cooperation for horizontal issues of common interests in support of the commitments of the 5G PPP contractual arrangement Portfolio analysis, coverage, mapping and gap analysis, roadmaps Support to the emergence of a 5G PPP "5G vision", to key international co- operation activities, SDO's, WRC.. Organisation of stakeholder events Monitoring of the openness, fairness and transparency of the PPP process Maintenance of the "5G web site"

ICT 7 – 5G PPP Research and Validation of critical technologies and systems Expected Impact RIA at macro level: 40% of the world communication infrastructure market for EU headquartered companies; Demonstrated progress towards core 5G PPP KPI's; EMF <LTE; Novel business models through innovative sharing of network resources across actors RIA at operational level: Flexibility of optical resource management; Optimised optical backhaul architectures and technologies; Ubiquitous 5G access, Definition of 5G network architecture, Proactive contribution to the standardisation activities on 5G, Proof-of-concept and demonstrators beyond phase one/specific use cases with verticals, Novel connectivity paradigms (edge), Network function implementation through generic IT servers, OS like capabilities to orchestrate network resources, Trustworthy interoperability across multiple virtualised operational domains and management of multi domain virtualised networks CSAs: Maximised output and exploitation of 5G PPP project results, Constituency building, stakeholder support, support to key international cooperation events; dissemination, Definition of future R&I actions

ICT 8 – 5G PPP Convergent Technologies High level Objectives To tackle scalability and usability of mixed network technological approaches that can benefit from previous research, towards validation of deployment at scale For IAs: work draws on existing scientific and research results in the field and includes scalable demonstrators validated through typical usage scenario (s1); openness to 3rd party developers (S2) For RIAs: collaborative research in 5G access leveraging Taiwan testbeds offers

ICT 8 – 5G PPP Convergent Technologies a. Innovation Actions 40 M€ a.1. Strand Ubiquitous 5G access leveraging optical technologies to develop and assess new optical access network solutions based on integrated optical device prototypes new optical transmission, switching and information processing techniques to support key access functionalities such as beam forming, high accuracy cm/mmWave generation and massive MIMO deployments Co-operative radio-optical approaches Techniques to map 5G channels to optical transport and a co-design of the optical and wireless interfaces and protocols a.2. Strand Flexible network applications targets development of a multiplicity of Virtualised Network Functions (VNF) for deployment of Network Applications Targets a Cloud-like 5G infrastructures, supporting network services, resource and service orchestration open source development framework for control functionalities and application development, open platforms to third parties

ICT 8 – 5G PPP Convergent Technologies b ICT 8 – 5G PPP Convergent Technologies b. Research and Innovation Actions 5 M€ Cooperation in access convergence To take advantage of the supporting 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU Test beds making use of facilities offered by Taiwanese partners Development and demonstration of an integrated convergent access across different air interface technologies and the fronthaul/backhaul/core network and capabilities of new spectrum access schemes A system demonstrator showing applications potential is favoured

ICT 8 – 5G PPP Convergent Technologies Expected Impact Innovation Actions: Validated access network architecture with integrated optical technologies for the realisation of critical access and transport control function Demonstration of technological applicability to dense access scenarios Demonstrated scalability, close to operational context. Contribution to standards, notably 5G and optical access Optical access interface with 10 times lower energy consumption Open environments for creation of network apps and Open repository of network apps that may be validated and leveraged by third party developers Validation at scale of the VNF aggregation capability RIA at operational level: Contribution to the ITU-R objectives for the next generation mobile network Contribution to the 1000 fold mobile traffic increase per area Contribution to the 1ms latency objective Results exploitation in the context of standardization and spectrum requirements

Call planning Opening: 10 May 2016 Closing: 08 Nov 2016 ICT-07-2017 & ICT-08-2017: Opening: 10 May 2016 Closing: 08 Nov 2016

Find out more Horizon2020 web site Participants portal http://ec.europa.eu/programmes/horizon2020 Participants portal http://ec.europa.eu/research/participants/portal H2020 Helpdesk, including FAQ http://ec.europa.eu/research/index.cfm?pg=enquiries 5G PPP: http://www.5G-PPP.eu

Thank you for your attention!

5G-PPP links TIME 5G research in FP7 and in the private sector 5G PPP Phase III 5G PPP Phase I 5G PPP Phase II Results from FP7 Projects contributed to ITU-R on 5G vision and requirements 3GPP Study Items ITU-R Vision and Recommendation ONF, Open Daylight, OPNFV, Open Stack, … WRC preparatory process 3GPP Work Items and 3GPP Releases Trials Prototype and product development Contributions to standardisation and regulatory process via member organisations in respective bodies TIME 19