NOAO Gemini Science Center (NGSC) Taft Armandroff for NOAO Users’ Committee October 2003.

Slides:



Advertisements
Similar presentations
1 AAO AusGO : 29 June 2009 Demystifying the Queue at Gemini Observatory AAO Epping - 29 June 2009 Henry Lee Gemini South, Chile.
Advertisements

NOAO Gemini Science Center (NGSC) Taft Armandroff for NOAO Users’ Committee October 2004.
Mauna Kea. The Gemini Project Who: An international partnership of the United States, United Kingdom, Canada, Chile, Argentina, Brazil and Australia.
1 HST Cycle 12 TAC Results Bob Williams TIPS – 17 April 2003.
Spring Depository Library Council March 31, 2008 U.S. Government Printing Office FDsys Update.
NOAO/Gemini Data workshop – Tucson,  Hosted by CADC in Victoria, Canada.  Released September 2004  Gemini North data from May 2000  Gemini.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
KDUST Supernova Cosmology
Facilities & Infrastructure Working Groups Meeting UNSW, 17 December 2004 Gemini Warrick Couch, UNSW.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
Wide-Field Science Capabilities at the AAO Stuart Ryder Australian Gemini Office Australian Astronomical Observatory.
1 EEC Board Policy and Research Committee October 2, 2013 State Advisory Council (SAC) Sustainability for Early Childhood Systems Building.
Emma Hogan, Gemini Data Workshop, July 19-22, 2010 What to do when things go wrong: Tips and tricks, and the Gemini HelpDesk Emma Hogan, Gemini Observatory.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
W. M. Keck Observatory Subaru Users’ Meeting
October 2005ALMA Cost Review1 Atacama Large Millimeter Array Science IPT Review Bilateral Project Scientists: Al Wootten, (Lead) Tom Wilson, (Deputy) Ryohei.
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
The Smiley Radio Telescope R.M. Blake, M. Castelaz, L. Owen, Pisgah Astronomical Research Institute J. Daugherty University of North Carolina Asheville.
Black holes: do they exist?
Gemini Observatory Update Eric Tollestrup – Associate Director for Development Scot Kleinman – Instrument Program Scientist Chris Packham – Gemini Science.
ALMA Operations and the North American ALMA Science Center Al Wootten NRAO.
1 The EIS Experience: Lessons Learned May 12, 2005.
Gemini Observatory Marianne Takamiya October 2000.
1 The Precision Radial Velocity Spectrometer Science Case.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Quasars, black holes and galaxy evolution Clive Tadhunter University of Sheffield 3C273.
Orientation Winthrop University-School Partnership Network Orientation.
IAS, June 2008 Caty Pilachowski. Visible in the Southern Sky Listed in Ptolemy's catalog Discovered by Edmond Halley in 1677 –non-stellar –"luminous spot.
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Gemini Observatory Report to the AURA Board 6 th February 2002.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Managing Under a Six-Nation Partnership Gemini Observatory soon to be Five.
Suggested Subaru-NAOJ/Princeton Consortium: Overview Michael Strauss, Ed Turner, Jim Gunn January 25, 2007.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
MNRF Management and milestone achievements Chris Evans AAO.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
TMT-India Science Interests and Project Update G.C. Anupama & R. Srianand (On behalf of the TMT-India)‏ TMT-SAC Meeting: November 2010, Pasadena,
What the Data Products Program Offers Users Todd Boroson Dick Shaw Presentation to NOAO Users Committee October 23, 2003.
Data Reduction with NIRI Knut Olsen and Andrew Stephens Gemini Data Workshop Tucson, AZ July 21, 2010 Knut Olsen and Andrew Stephens Gemini Data Workshop.
GSC Report Simon Morris (Durham University, GSC Chair)
Galaxies with Active Nuclei Chapter 14:. Active Galaxies Galaxies with extremely violent energy release in their nuclei (pl. of nucleus).  “active galactic.
ALMA Science Examples Min S. Yun (UMass/ANASAC). ALMA Science Requirements  High Fidelity Imaging  Precise Imaging at 0.1” Resolution  Routine Sub-mJy.
Lessons Learned Workshop 24 th August 2002 Success Success Challenges Challenges The Context for Aspen 2003 The Context for Aspen 2003  Looking ahead.
Active Galaxies and Supermassive Black Holes Chapter 17.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
The Importance of Public Participation and Outreach in Project Development Gary Flunoy – Business Outreach/Public Involvement Coordinator August 27, 2009.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
Wrap up and the road to formulation Brussels, 29 January 2016.
1 Scientific Advisory Committee Tucson, AZ November 16, 2015 LSST Communication to Scientists - New Developments and Plans Looking Ahead Suzanne Jacoby,
The Submillimeter Array 1 David J. Wilner
Community Science Updates
Wide-Field Science Capabilities at the AAO
DIRECT DETECTION OF GRAVITATIONAL WAVES FROM NEUTRON STARS
11/28/17—Astronomy Warm-Up: Write 3 things you know about the Milky Way galaxy. Bring laptops/project materials MONDAY!! SCSh1. Students will evaluate.
Presentation transcript:

NOAO Gemini Science Center (NGSC) Taft Armandroff for NOAO Users’ Committee October 2003

Overview of NGSC Activities NGSC User & Observing Proposal Support NGSC Operations Support NGSC Outreach to U.S. Astronomical Community NGSC Instrumentation Activities “Aspen” Next-Generation Gemini Instrumentation Process

NGSC User Support Call for U.S. Gemini proposals & their evaluation –Community education NOAO Newsletter, NGSC section U.S. Gemini Web information AAS Meetings PowerPoint presentations at U.S. universities –Proposal technical review –Support TAC evaluation –Transmit ranked list to Gemini; interface via ITAC Support of U.S. Gemini proposers & users –HelpDesk, & phone contact –Support & checking of U.S. Phase II submissions 2003B: GMOS, NIRI, & Phoenix (44 U.S.) Provide reduction packages for Gemini data –Collaboration with NOAO Data Products Program and Gemini

2003B U.S. Gemini Requests 107 proposals Gemini North: nights in 60 proposals –GMOS-N: 49.3 nights in 28 proposals –NIRI: 38.0 nights in 21 proposals –Michelle: 20.5 nights in 13 proposals Gemini South: nights in 52 proposals –T-ReCS: 32.1 nights in 18 proposals –GMOS-S: 41.9 nights in 17 proposals –Phoenix: 30.4 nights in 15 proposals –AcqCam: 2.5 nights in 2 proposals Oversubscription: 2.6 at GEM-N, 2.7 at GEM-S Oversubscription systematically underestimated due to non-inclusion of weather & technical losses

2004A U.S. Gemini Requests 133 proposals Gemini North: nights in 77 proposals –GMOS-N: nights in 50 proposals –NIRI: 62.5 nights in 29 proposals –10 of NIRI proposals included ALTAIR Gemini South: nights in 59 proposals –T-ReCS: 60.8 nights in 25 proposals –Phoenix: 46.1 nights in 23 proposals –GMOS-S: 16.5 nights in 12 proposals –AcqCam: no requests Oversubscription: 3.0 at GEM-N, 2.5 at GEM-S

NGSC Operations Support Phoenix high-resolution IR spectrograph: service observing on Gemini South –50 science nights scheduled in 2003A –Hinkle, Blum, van der Bliek, & Ridgway support NGSC Staff involvement in Commissioning & System Verification for new Gemini instruments –GMOS South: M. Bergmann, C. Smith –T-ReCS: 2 System Verification programs of NGSC Staff –Many NGSC Staff proposing for ALTAIR + NIRI SV, MICHELLE imaging SV, GMOS-South IFU SV Develop arrangement to help support Hokupa’a-85 + Abu Adaptive Optics Imager on Gemini South Develop a remote operations capability in Tucson (GROC) & La Serena using high-speed video and computer links to Cerro Pachón and Mauna Kea

Community Outreach Host special-topic science & analysis workshops –Future NGSC workshop ideas: mid-IR observing opportunities at Gemini Integral Field Unit (IFU) opportunities at Gemini Using IRAF to reduce your Gemini data GNIRS observing & calibration NGSC at AAS meetings: booth at Seattle AAS (posters, brochures & Observing Tool demonstr.) –do same at Atlanta AAS (January 2004) NGSC presentations at U.S. institutions NGSC Webcast on Gemini 2004A Proposals Postdoc program (2 general; 3 South American) Gemini Science Meeting in 2004 (NGSC Support) U.S. Gemini SAC is NGSC’s community-based advisory council

NGSC Instrumentation Activities Mission –instrument procurement in U.S. for Gemini telescopes –analogous function in other partner countries Activities –NGSC let all the current U.S. instrument contracts –provide advice & liaison to the instrument teams –carry out management oversight CoDR, PDR, CDR, acceptance testing Quarterly Reviews release of payments only when specified milestone met –report progress to International Gemini; coordinate communications between the instrument team & Gemini

U.S. Instrument Developments T-ReCS: mid-infrared imager and spectrograph for Gemini South (Florida) –Delivered to Gemini South 12 April 2003 –Followed by integration, acceptance testing, & commissioning –First light took place 2 June 2003 –TAC-approved science programs beginning execution! GNIRS: workhorse infrared long-slit / IFU spectrograph for Gemini South (NOAO) –Pre-shipment acceptance test completed 15 October 2003 –GNIRS shipment to Gemini South imminent –Mounting GNIRS on Gemini South planned for December 2003 –GNIRS first light planned for January 2004

U.S. Instrument Developments NICI: dual-beam coronagraphic infrared imager for Gemini South (MKIR) –NASA funded –Procurement / fabrication phase ending; integration phase beginning –December 2004 delivery planned Flamingos-2: multi-object IR spectrograph and imager (Florida) –Management Review in late January 2003 –NGSC assisting Florida personnel in project management techniques (Gaughan & Eklund) –Flamingos-2 contract approved and signed in early May –Critical Design Review took place in August –December 2005 delivery planned

US Next-Gen Gemini Sci/Inst Planning Workshop: May 29-31; Tempe, Arizona Goal: Key Gemini Science Programs for Realm –High-impact science questions / projects –What observations are needed to answer the science question? 40 participants; diverse in science interests & institutional affiliation (includes most of the U.S. Aspen delegates) & telecon preparatory discussions Four Science Breakout Groups –Stars, the Solar System, and Extra-Solar Planets (leader: J. Valenti) –Star Formation Processes and the ISM (leader: M. Meyer) –Structure and Evolution of the Milky Way and Nearby Galaxies (leader: R. Wyse) –Formation and Evolution of Distant Galaxies and the High-Redshift Universe (leader: K. Glazebrook) Written report on Tempe conclusions on Web Two briefings/discussions on Tempe results for U.S. Aspen delegates; firm up U.S. consensus

Tempe Over-Arching Questions Formation and Evolution of Planetary Systems Formation of Stars & Brown Dwarfs over the Mass Spectrum Origin of the Elements Origin of the Hubble Sequence Dark Matter and the Formation of Galaxies from Substructure Dark Energy and Cosmic Sound Reionization History of Universe Feedback from Stars & AGN on Galactic Evolution

Aspen International Gemini Next- Generation Instrumentation Meeting June 27-28, 2003; Aspen, CO Half of delegates from U.S. Half of science group chairs from U.S. Written report on science questions and instrumental requirements National Gemini Offices (NGSC) then estimated ROM costs for each instrument concept “Aspen” report submitted to Gemini Science Committee for its October meeting To be considered by Gemini Board at its November meeting

“Aspen” Instrument Summary

Open NGSC/Gemini Issues Are the science needs of U.S. community at large aperture being met by Gemini? Any issues impeding user science? Do the “Aspen” instruments represent a bright scientific future for Gemini? What are the near-term priorities for commissioning Gemini instruments? What data reduction software is most needed for U.S. Gemini users? Is there demand for both Queue and Classical observing with Gemini by our community? The U.S. Gemini SAC has discussed all these questions.

Begin Reserve Slides May be of use for specific committee questions

Recent U.S. Gemini Papers “Detection of Nine M8.0-L0.5 Binaries: The Very Low Mass Binary Population and Its Implications for Brown Dwarf and Very Low Mass Star Formation,” Close et al., ApJ, 2003 “Resolved Mid-Infrared Emission in the Narrow- Line Region of NGC 4151,” Radomski et al., ApJ, 2003 “Mid-Infrared Imaging of the Protostellar Binary L1448N IRS 3(A,B),” Ciardi et al., ApJ, 2003 “Fluorine Abundances in the Large Magellanic Cloud and Omega Centauri: Evidence for Neutrino Nucleosynthesis?,” Cunha et al., AJ, 2003