MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
RoD set-up for the TileCal testbeam, 2003 period. 9th Workshop on Electronics for LHC Experiments Amsterdam, 30 september 2003 Jose Catelo, Cristóbal Cuenca,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
LKr readout: present and future R. Fantechi 30/8/2012.
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in : Testbeam 2: Installation, Cosmic Ray Commissioning.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
Upgrade activities at Clermont-Ferrand
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Monitoring system commissioning
Injectors BLM system: PS Ring installation at EYETS
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
Status of upgrade works at Clermont-Ferrand
Online Software Status
Cabling Lengths and Timing
Pierluigi Paolucci - I.N.F.N. Naples
TileCal ROD Commissioning Counting Room Installation
UK CMS Oversight Committee Mtg
RoD set-up for the TileCal testbeam, 2003 period.
TTC news December 04 Sophie Baron TTC.
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager

Tilecal week / Dec 04Gerolf Schlager (Cern) Introduction & Reminder Mobile DAQ test bench for commissioning of Tilecal in the pit Test up to 8 drawers simultaneously 2 main functionalities: –Standalone tests in “DVS” to test functionality of components –“play daq” for data taking (stability, cosmics,…) Critical manpower change: Paulo went back to Rio, now taken over by Andrea and from March 05 by Iacopo MobiDAQ team: Bob, Jim Pr., Paulo, Andrea, Iacopo, Jim S., Giorgi, Gerolf (and help from the rest of Tilecal)

Tilecal week / Dec 04Gerolf Schlager (Cern) Hardware Overview Now really standalone –CCTs + laptop setup as local network using a hub –boot CCTs via laptop –Not dependent on external network (AFS,…) Trigger modules added NIM crate providing external trigger (L1A) added

Tilecal week / Dec 04Gerolf Schlager (Cern) Damaged power supplies Shipment of MobiDAQ power supplies arrived damaged 2 PS with problems –Short circuit + fire + smoke when plugged in 1 already repaired (  10 in hand)

Tilecal week / Dec 04Gerolf Schlager (Cern) Software play_daq Fully functional – can start runs and take data Andrea currently working on monitoring (see talk in TileCal Software meeting, ) DVS So far all tests ready for DVS except CIS test Trigger test still needs some timing adjustments Feedback from experts wanted: how detailed do we want to test the components? (E.g.: now using tests from Ilya for ADC – not done in the 2 standalone testbenches)

Tilecal week / Dec 04Gerolf Schlager (Cern) play_daq DAQ a la testbeam Readout through ODIN cards and sent to laptop (=ROS) using Ethernet Later possible reconstruction with Athena Can run during long periods to check stability Use online monitoring for checks –Summaries Pedestal & noise (from Francesco) –Timing info –Trigger tower vs. ∑(PMTs) Take cosmics data

Tilecal week / Dec 04Gerolf Schlager (Cern) Standalone tests Name of test Communication via What is tested CANbusTTC test_canbus_interface X CANbus connection test_adc_interface X CANbus, 3in1 cards, ADC functionality test_integrator_interface X CANbus, ADC integrator test_ttc_interface XX TTC, CANbus, 3in1 cards test_trigger_interface XX TTC, CANbus, Trigger signal test_hv_channels X HV CANbus, HV orders & values test_hv_interface X HV CANbus drawer_pedestal X CRC, BCID, high frequency noise drawer_readout X CRC, BCID digi_read X Simple digitizer readout “HowTo” created on MobiDAQ webpage –Detailed description of tests and how to use them in standalone mode

Tilecal week / Dec 04Gerolf Schlager (Cern) DVS Tests now implemented in DVS framework Could be used for ATLAS Detailed test log DVS upgrade Jan05 –Verbose option Verbose ON –Full output Verbose OFF – Result only (Passed/Failed) –Full output if error occurs –Keep logs of previous tests –Logical sequence of tests (parallel or serial)

Tilecal week / Dec 04Gerolf Schlager (Cern) Work in the pit (1/1) The 3 D’s: Dirty, louD, Difficult Moved into pit end of October 1 st using the racks room (USA15) 8 sets temporary cables installed (TTC, GLINK, CANbus, Trigger) 8 power supplies installed Read out 7 drawers successfully (communication problem with 8 th drawer) Found 1 TTC fiber dead – now replaced Moved back to blg. 185 for LV experts week (real “Mobi” DAQ!)

Tilecal week / Dec 04Gerolf Schlager (Cern) Work in the pit (2/2) Temporary cables arriving at barrel Power supplies on fingers (Very difficult to manipulate cables & PS because of OPAL cradle – 20cm space!) OPAL cradle MobiDAQ power supplies

Tilecal week / Dec 04Gerolf Schlager (Cern) High frequency noise (high gain) with MobiDAQ power supplies (1/2) No ground connected to PSGround connected to PS Mean ~ 1.3 Mean ~ 1.7 No 3in1 Explanation Georges Blanchot: Ground loop is created through the grounding of the iron mass – but in pit the drawer was outside on a table and we saw the same problem

Tilecal week / Dec 04Gerolf Schlager (Cern) 3m cable1m cable High frequency noise (high gain) with MobiDAQ power supplies (2/2) Measurement with MobiDAQ Preliminary results – want to confirm them with Ahab since MobiDAQ is still in development state Noise seems significantly lower with shorter Harting cable (between PS and Drawer)

Tilecal week / Dec 04Gerolf Schlager (Cern) Noise change using filter for PS With filterWithout filter PS was plugged into a commercial filter Result: No significant influence on noise observed

Tilecal week / Dec 04Gerolf Schlager (Cern) Side-effects of MobiDAQ… Readout Buffer –Critical firmware bug discovered –Could be repaired by Barcelona TTCoc –Critical problems with optical output power of TTCoc –Not possible to use the current system in ATLAS

Tilecal week / Dec 04Gerolf Schlager (Cern) TTCoc – Problem description TTCex TTCoc (splitter 1:16) TileCal Modules Multimode Singlemode Attenuator VME crate Single mode laser source (TTCex) Multi mode system (TTCoc, fibres) Thanks to Belen for the help on this slide

Tilecal week / Dec 04Gerolf Schlager (Cern) TTCoc - Consequences Insertion loss from -17 up to -5 dB on the outputs of the same 1/16 coupler (specs -14dB) Signal timing very sensitive to any motion of the first multimode patch (between the laser and the TTCoc) Multimode attenuators not efficient because signal is not really a multimode signal Singlemode attenuator effect is ~x3 because of the diameter change Never discovered before because tests were not made with TTCex (= single mode source) Discovered with MobiDAQ Now working on solution Slide from Sophie Baron

Tilecal week / Dec 04Gerolf Schlager (Cern) TTCoc – Possible solutions Multimode (MM) source Mode scrambler on output of laser Figure 5: Mode scrambler from Newport Newport Price: 794 CHF. Slide from Sophie Baron Singlemode (SM) fibers up to TTCoc then: –SM2SM TTCoc + SM fibers to detector –SM2MM TTCoc + MM fibers to detector Evaluation in progress

Tilecal week / Dec 04Gerolf Schlager (Cern) Conclusions MobiDAQ is well on the way –Almost all standalone tests operational –Monitoring is being finished Continue development in Jan05 in blg 185 –CIS test –Trigger timing –DVS upgrade –Monitoring Then move to pit to start testing 8 drawers (hopefully with cooling and without OPAL cradle) Stability tests, cosmics or drawer functionality tests … schedule to be decided Further investigations of the noise with PS