Japan-US Collaboration 1 2016/3/7 Japan-US Collaboration 1 2016/3/7 Fast kicker development The beam extraction design from DR to the extraction line and.

Slides:



Advertisements
Similar presentations
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
TPS pulse magnet measurement
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
CLIC Damping ring beam transfer systems
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Bunch Separation with RF Deflectors
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Junji Urakawa ( for collaborators ) March KEK at LNF
XFEL Beam Collimation and Switchyard Review Beam Switchyard
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Status of CTC activities for the Damping rings
Preliminary analysis of PS septum 31 failure August 8th, 2008
Y. Nosochkov and M. Woodley (SLAC)
Kicker and RF systems for Damping Rings
Specifications for the XFEL Beam Switchyard Kickers
Presentation transcript:

Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and the preliminary beam test in DR was carried out. To solve the geometrical restriction, the design includes a pulse bump system and a auxiliary septum magnet. The drawing shows the orbit of the circular bunches and the extracted beam. The test strip-line electrode(30cm long) was fabricated (see pictures). The beam kick test in DR measured 0.7mrad of the kick angle by using +/-10kV pulse generator, which is enough to get 2mrad by using 2 unit of the pulse generator and 60cm long strip-line. The pulse bump orbit was tested and the auxiliary septum was fabricated. Beam kick profile

Japan-US Collaboration /3/7 Fast Kicker R&D at ATF Pulser: FID FPG KN Maximum output voltage10 kV Rise time, 10 – 90%< 1 ns Rise time, 5 – 95%< 1.2 ns Pulse duration at 90% peak amplitude0.2 – 0.3 ns Pulse duration at 50% peak amplitude1.5 – 2.0 ns Output pulse amplitude stability< 0.7% Maximum pulse repetition frequency6.5 MHz Number of pulses per burst110 (max) Burst repetition frequency5 Hz Beam extraction test:January 2009, this failed due to broken pulsers by high level radiation near extraction area. After we will repair the pulsers and install them behind concrete shield block, beam extraction test will be done again in this year (May). We are preparing good cables, and then we will measure the effect of the cables in this April.

Japan-US Collaboration /3/7 Study on the fast ion instability at ATF ATF 2004 Distinguish the two ion effects: beam size blow-up and dipole instability. Quantify the beam instability growth time, tune shift and bunch train gap effect Provide detailed data to benchmark simulations with experiment. In this week, we measured 12-20pm vertical emittance by X-SR and have to confirm this value by laser wire. When we will get the stable beam with low emittance less than 10pm, We will do the fast ion study again, April or May.