NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.

Slides:



Advertisements
Similar presentations
Overview of New Practices & Policy Deck Issues. Topics Stakeholder Responsibilities Stakeholder Responsibilities Deflection Control Measures Deflection.
Advertisements

Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
ODOT Structure Project Manager Seminar Concrete Decks
Unit 10 - Stairway Construction
Construction Perspective
Structural Steel Construction
The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
is a mobile protective steel barrier in a modular design.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
Composite Construction
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Xxxxxxxxxx TXD. TXD Design Goals Alternative to a “Big-Rig” Shallow oil/gas and CBM applications Handle range 3 casing Quick and easy set-up and breakdown.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
Chapter 3: Scaffold Safety
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
Cannon Beach Cache Container Project Cannon Beach City Forum 04/18/12 Cannon Beach City Forum 04/18/12.
View from the bridge wing in the drydock of open cargo holds forward.
Illinois Department of Transportation Weigh In Motion Study
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
> >
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
N. PRESTON, M. MARTIN CERT IV ESTIMATING 2012 Part Lesson 4 – Slab on Ground IDENTIFY AND PRODUCE ESTIMATED COSTS FOR PROJECTS.
Spliced Girders A Producer’s Perspective
Group N Chris Jones Ella Feekins Nikoline Hong
Introduction to a pit installation
Tying together means and methods in a Methods of Construction – Concrete & Masonry curriculum A Faculty Perspective Case Study.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
N.W.F.P. University of Engineering and Technology Peshawar 1 By: Prof Dr. Akhtar Naeem Khan Lecture 12: Composite Beams.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Fundamentals of Structural Detailing
Tom Canfield Engineering Technologies and Design POE Medina County Career Center 1/3/2011.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Composite Construction
Chapter 13 Concrete Form Design. SLAB FORM DESIGN Method WALL AND COLUMN FORM DESIGN DESIGN OF LATERAL BRACING.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Steel Worker D.J. Richie DDP Period 7. Work Environment Steel mills evoke images of strenuous, hot, and potentially dangerous work. While many dangerous.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Construction Methodology for Suramadu Main Bridge.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
FORMWORK DR. Nabil Dmaidi.
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
Minuteman Vocational Technical Regional High School Progress
Course Contents Culverts Bridges Buildings 20 November 2018.
Concrete Structures DR. Nabil Dmaidi.
Building Frame (Column & Beam)
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Safety by Design & Engineering – Florida Footbridge
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Barlogik Mathsbee (final)
Rack Placement Chopper Workshop
Chapter 13 Concrete Form Design.
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Fig. 1 Prestige hierarchies in faculty hiring networks.
Presentation transcript:

NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.

NEXT BEAMS  Quantity ~ 6 beams  Length ~ 67 ‘  Width ~ 8’  Weight ~ 82,422 lb E.T.& L. CORP.

 Minimal deck formwork  Ease of erection  Reduced construction time  Increased jobsite safety E.T.& L. CORP.

 Weight of Beams  Two Cranes  Unloading Area E.T.& L. CORP.

 Beam camber movement during concrete deck placement  Minimal adjustment for top of final deck elevation E.T.& L. CORP.

 Concrete clearance  6” Stirrups  Overhang bracket clips  Bidwell Setup E.T.& L. CORP.

QUESTIONS / COMMENTS E.T.& L. CORP.