Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe,

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

by Wim der Kinderen Consultant Production Technologist
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Image Area Condition Monitoring of Subsea Equipment for Enhanced Equipment and Production Performance Tomi Entaban Sabah Oil & Gas Conference & Exhibition.
Optimising Site Investigations for Offshore Wind Farm Projects Mark Finch Geotechnical Engineering Manager Hydrosearch Associates, Aberdeen UK Offshore.
Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Product Recalls and Reporting Obligations in Europe Presentation to ICPHSO Asia-Pacific Symposium Seoul, Korea, 31 October to 2 November 2011 Rod Freeman.
BRC Storage & Distribution Safety and Quality Management System Training Guide
Workforce Planning Training for Supervisors Presentation Subtitle/Description Presenter’s Name Date.
Human factors Training & Competence CaspianExplorer.com.
Fire and Explosion Hazard Management UK Offshore model
Structure and Responsibility
Achieving our mission Presented to Line Staff. INTERNAL CONTROLS What are they?
Financial Audit Autonomous Bodies Internal Control and Risk Assessment Session Internal Control and Risk Assessment.
Introduction to SQF Certification (Use “Notes “ View in PowerPoint to see additional guidance) Use this presentation to introduce SQF Certification.
Copyright 2001 SIEP B.V. Gas-Lift Surveillance Tools of the Trade Jim Hall 5 February, 2002 ASME/API Gas-Lift Workshop.
Welcome ISO9001:2000 Foundation Workshop.
Adaptive Processes Simpler, Faster, Better 1 Adaptive Processes Understanding Information Security ISO / BS7799.
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
Introduction to ISO New and modified requirements.
By: Gatut Widianoko Weatherford Artificial Lift Systems
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
Please read before using this briefing This presentation forms the basis of a workshop for operational managers and other relevant staff to review quality.
Software Quality Assurance Activities
Gas Lift Design Philosophy for Chevron’s Subsea Developments
13 Human Responsibility - Quality. Quality Qualitative and quantitative testing –Coming up in this unit –Qualities in designing –Quantities when designing.
CIS Case History NACE Eastern Area Conference
Test Roles and Independence of Testing Telerik Software Academy Software Quality Assurance.
Risk Based Monitoring, Sponsor’s Experience Rital Lippman Barnes Clinical Research Manager, MSD.
Summary of Assessment Reports and Gap Analysis
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
Philip Holweg Wim der Kinderen (Shell Expro)
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
Time Collection with Mobile Devices Session Presented by JP Issock Quality Business Consulting.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Physical Inventory Why? 1 Barbara A. Finnegan, CPPM CF.
Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.
Progress report Study Group 3.2 SPONSOR Daniel Falabella (Argentina) DEPUTY Mohd Nazmi (Malaysia) S.G. LEADER Abderrahame Taberkokt (Algeria) Mar del Plata.
Feb , Gas-Lift Workshop1 Gas-Lift Diagnostics Breakout Session 20 Participants: 13-Oil Producers, 7–Consultants & Manufacturers Session.
Copyright February Shell International E & P All Rights Reserved ASME/API Gas-Lift Workshop Sheraton - North Houston Houston, TX February 6 and.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
Engineering and Management of Secure Computer Networks School of Engineering © Steve Woodhead 2009 Corporate Governance and Information Security (InfoSec)
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Monogram Technologies Group InDepth International provides a complete service for subsea operations, handling anything from the recruitment of qualified.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2015 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
CERTIFICATE IN ASSESSING VOCATIONAL ACHIEVEMENT (CAVA) Unit 1: Understanding the principles and practices of assessment.
Safety Leadership Defining a World Class Safety and Health Program – An Industry Perspective* *Special thanks to GE Global Nuclear Fuels – for the use.
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
RTI, MUMBAI / CH 71 SUPERVISION, REVIEW AND QUALITY CONTROL DAY 7 SESSION NO.1 (THEORY ) BASED ON CHAPTER 7 PERFORMANCE AUDITING GUIDELINES.
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
© 2015 IHS. ALL RIGHTS RESERVED. Genstar Capital Acquires IHS Operational Excellence & Risk Management Business Ensuring the Success of Global EMIS Projects.
Personnel.
What is HSE Competence Assurance?
Establishing and Managing a Schedule Baseline
WORKSHOP INTRODUCTION
WP 3 How to assess implementation of ALARA
Proficiency Testing as a quality improvement tool
Gas Lift in Subsea Wells
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
Traceability, changes and challenges
Shell UK Exploration and Production
Gas-Lift Automation Breakout Session
Presentation transcript:

Challenges of Offshore Gas Lift Break-out session API/ASME Gas Lift Workshop 4-5 Feb 2009 Wim der Kinderen Senior Production Technologist Shell EP Europe, Aberdeen

50 wells 230 wells 50 wells Gas lift in Shell EP Europe - dimensions

Why is subsea GL challenging? Need to design for the life of the well –Compromising number of valves, lift depth, orifice size Expensive interventions –Few GL valve change-outs and flowing pressure surveys Risk of hydrates –Gas quality and adherence to operating procedures are critical Wells are typically commingled –Over-injection causes back-out/deferment Well testing causes deferment –Limited (quality) test and survey data available –System and well model calibration is therefore cumbersome

Some questions How do we fill the gaps when data are missing? –Alternatives for well testing, gas lift flow metering etc How useful/accurate are our models to optimise lift gas distribution? –How often do we verify models with multi-rate tests? How do we manage flow assurance? –How do we prevent and cure hydrate problems? What are the critical success factors for a GL valve change-out? –Contingency? Wireline crew competency? How do we manage well integrity? –How often do we test for tubing-to-annulus communication? –Who decides about dispensation?

Discussion summary (1) How do we fill the gaps when data are missing? –Use a (physical) model to complement what is not measured –Assign confidence levels to data –Model accuracy increases with more and better data –Trending of data can make models more accurate –Define points in the system where totals are measured and work back to the wells –Make use of transients, e.g. when a well goes down the drop in total system production will reflect that well’s production –Lack of data is no excuse for not maintaining models, it just becomes more tedious and laborious –Involve field personnel in optimisation, this will help improve (well test) data quality –Spend more time training field personnel; they are interested and keen

Discussion summary (2) What are the critical success factors for a GL valve change-out? –There is a global problem with wireline crew competency –Verify that the services contractor sends his most experienced wireline operator –Kick-over tools must be in tip-top (= new) condition –Make sure we have the right valves, never use re- conditioned valves –Elastomers must be the best available to prevent sticking –All well work activities need to be reported in detail –Operating company expert should supervise all well work –New ISO standard may help ensure that crews test all equipment

Discussion summary (3) How do we manage well integrity? –Start with frequent testing, then reduce frequency to e.g. 6 months –We need testing standards, based on parameters that can be measured in the field (pressure dP/dt) –Dispensation should take into account risk assessment –In the UK, the government typically follows operator recommendations –As we see more and more offshore and subsea wells being gas-lifted, this subject should get a lot more attention