Well #4 – 801 Marchesano Drive Well #5 – 2526 Pelham Road.

Slides:



Advertisements
Similar presentations
18 Louisa Street - Bayfield. 3 Tuyll Street - Bayfield.
Advertisements

Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.
JIM MINER REALTOR®. CRITERIA USED  3-7 ACRES  43,560 SQ FT IN ACRE  GREAT LOCATION  CHEAP PRICE  MEETS CITY ORDINANCE  ANY ZONE  GENERALLY ON A.
Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Lake Creek Watershed Road Stream Crossing Survey Conducted on August 14, 2003 Conducted on August 14, 2003 Survey conducted by Janice Tompkins and Mary.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
Capital Improvement Program City of Warren, Ohio April 2012.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
Parallel and perpendicular. Parallel lines do not ever cross.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
Lockheed Martin TLS Visitor Maps & Directions Orlando, FL
Independence Blvd. (Hwy 74 West) Toward downtown Charlotte Prepare to exit right (exit 243) Charlottetowne Ave.
Northeast Lisbon BY: SOPHIE, GAVIN, TYLER, KENDALL, ALI, LEVI, NOLAN, AND MARIA.
LMC, Bethesda Maps 01/21/ LMC, Bethesda Maps 01/21/ Lockheed Martin Headquarters 6801 Democracy Center 6901 ROCK SPRING DR OLD GEORGETOWN.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
13 th Street and Dayton Avenue – Ames, IA Intersection Study ByungOck Kim Greg Karssen.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Parent Drop off Please drop off between the cross walks. Pull up as far as possible. Do not let your students out before the crosswalk. If you pull into.
 Remembering Joan on the 5 th Anniversary of her death.
Map: St. Louis to Ft. Leonard Wood
Ali Nabavi Project Manager Information Technology Fulton County Government Atlanta-Fulton Public Library System Capital Improvement Program.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Orleans France By Kendra Zellmer Casselberry. Location North Central France 130 kilometers southwest Paris. North Central France 130 kilometers southwest.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Clarksville Pedestrian Safety Project. SR 12/US 41A “Pedestrian Warning Zone” Road Safety Audit.
Challenged Detectors – Volume- Occupancy Plots & Maps.
Committee on Homelessness For more information, call 211contact Michele Fuller-Hallauer at or For more information, call 211.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
The Mobility Authority Story: Building for our Future.
City of Murrieta Capital Improvement Projects for FY I-15/California Oaks Interchange I-15 Overcrossing at Los Alamos Road* Jackson Avenue/Warm.
© 2015 Plank Road Publishing, Inc. All Rights Reserved 1.
Geo-Diary By: Jennifer Holmes SST My House  4:30 pm  October 23, 2012  Facing NW  Emerald Ave NE in Grand Rapids  This is my humble abode.
SANTA MONICA BIG BLUE BUS Santa Monica City Council Study Session – August 8, /30/05 Big Blue Bus Design -New Access Center Building -New Administration.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Directions to the Hotels in Tullahoma, TN from Nashville The most straight forward, least confusing route is to travel the interstate I-24 to Manchester.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
Special Mention: Copley International Conference Center Upper Level Southeast: Inaccessible Element.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU DZ SW Yamhill,
Arizona Forward Update
Pregnancy and the first years of life are one of the most important stages in the lifecycle; therefore, we would like to support you in this journey by.
Turn right onto Bethany Home Road.
We Apologize for the Road Construction!
Zones 1 & 2 Total Count Item 2008 Quantity 2007 Quantity Difference
Regional Roads Committee
City of Johnston East of Merle Hay Road Infrastructure Improvements
PROPOSED DISCOUNT TIRE 10 GARDEN STREET PALM COAST, FL
NAB Map Gate 1 NETWARCOM HQ Drexlor Manor Exchange + Food Court Gate 3
Omnilore Standard Walks
DISTRICT 1 ADVERTISED PROJECTS
Medical Clinic NOSTRA.
North Main Street Intersection Improvements at Route 460 Bypass
Corner of San Pedro and W. C Street
Belmont Canyon Road Belmont, CA - March, 1989.
The road along the track will be closed for student safety.
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
April May April May June July July June August Sept August
SUNCREEK ESTATES Section 1
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Student Center A South: Inaccessible Element
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Presentation transcript:

Well #4 – 801 Marchesano Drive

Well #5 – 2526 Pelham Road

Well #6 – th Avenue

Well #9 – 2708 Crosby Street

Well #10 – 4316 Newburg Road

Well #11 – th Avenue

Well #12 – 1022 Benton Street

Well #13 – 4625 Skyline Drive

Well #16 – 4550 Harrison Ave

Well #17 – 3700 Brookview

Well #18 – 1409 S. Johnston

Well #19 – 1220 Lockheed Lane

Well #20 – 2434 N. Central

Well #22 – 5110 Auburn

Well #23 – 1206 Elmwood

Well #24 – Cessna Drive

Well #25 – 5602 Spring Creek

Well #26 – 5616 East State

Well #27 – 5834 Guilford

Well #28 – 5400 Beltline Road

Well #29 – 4750 Pepper Drive

Well #30 – 6544 Palo Verde Drive

Well #31 – 1780 Bell School Road

Well #33 – 930 Arthur Avenue

Well #34 – 3945 Dawes Road

Well #35 – 2944 Bildahl Street

Well #36 – 4141 Samuelson

Well #37 – 2100 Huffman Blvd.

Well #39 – 7423 Bell School Road

Well #40 – 788 Lyford Road

Well #42 – 6733 Newburg

Well #43 – 3447 Publishers Drive

Well #44 – 5250 Owen Center Road

Elevated Tank O2 Wentworth Ave Lot south of Elevated Tank O2 Mow June, July, August only

Elevated Tank 02 – 2310 Wentworth Avenue

Elevated Tank 05 – Christopher Drive

Zone Control Valve #9 – 3030 Chestnut Street

Rockton Avenue IZ – 4834 Rockton Avenue