Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th 2004 2/13.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

Presenter: Kenny Haulk
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet – IEEE 802.3z The Choice of a New Generation Status Presentation ECE 4006c G2- Gigabit Ethernet Intel/Agilent TX Javier Alvarez, gte006r.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Status Report 6 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 10/13/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13

Gigabit Ethernet Project Status 2/12-2/19 Completed/ In Progress Test Tx Eval board Built Rx Test board Revise Gantt Charts Explore Express PCB Tools Chose VCSEL and PD vendors and parts Update Optical Link Budget Website Upcoming Tasks Call vendors and order parts Schematic board design using Express PCB Tools Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Tx Eval board [1] Maxim 3287 Evaluation Board [2] PRBS 7 signal at 1 sec. persistence Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Rx Test board Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Rx Test board [3] Finished Rx test board with all same value capacitors Group 2 – Presentation 3 February 19 th /13

[4] Major Triggering problems or just bad soldering? Gigabit Ethernet Rx Test board Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Rx Test board [5] Group 1 Receiver board[6] PRBS 7 signal at 1 sec. persistence Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Rx Test board [7] Luis’ Test board results PRBS 7 signal at 1 sec. persistence Group 2 – Presentation 3 February 19 th /13

Gigabit Ethernet Gantt Chart Gantt Chart 9/13

Group 2 – Presentation 3 February 19 th /13 Gigabit Ethernet Express PBC Tools [9]

Group 2 – Presentation 3 February 19 th /13 Gigabit Ethernet IEEE Laser Safety [10] IEEE reference to eye safety

Group 2 – Presentation 3 February 19 th /13 Gigabit Ethernet PD/VSCEL Photo Diode: Device Parameters VendorPart# Cap pF (max)Responsively (A/W) mintyp LasermatePST M85A OptekOPF OSIFCI - 125G 006HR OptowayOPDR1-GSA VendorPart # Slope Efficiency (mW/mA) Threshold Current (mA) minmaxtypminmaxtyp HoneywellHFE 438x HoneywellHFE 438x OptekOPV LuxnetVGIA 9001 SCTOSA VCSEL: Device Parameters

Honeywell VCSEL for Data Communication Lasermate Group, Inc Optek Photodiodes OSI Fibercomm Optoway Optek VCSEL Luxnet VCSEL Gigabit Ethernet Specification Links Group 2 – Presentation 3 February 19 th /13