LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Longitudinal Expansion of RFQ Vane Ends at Section-to-Section Interface.
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
SLAC Phase II Secondary Collimators 6 October 2005 LARP Collaboration Meeting-St. Charles, IL Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
BL1U at TRIUMF UCN Beamline Spallation Target & Remote-Handling System (Aug/2010) L.Lee.
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
1 Calorimeter Thermal Analysis Revision C November
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
LARP Collimation – Engineering & Analysis
Hervé Allain, R. van Weelderen (CERN)
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Hervé Allain, R. van Weelderen (CERN)
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Hervé Allain, R. van Weelderen (CERN)
Challenges for FCC-ee MDI mechanical design
Recommendations of 12/16/05 review committee & SLAC response
LARP Collimation – Engineering & Analysis
¼ meshed models for Omega3P calculations
Discussion on the TDI impedance specifications
Upgrade phase 1: Energy deposition in the triplet
accident deformation – doyle (rev1) 1/8
Phase II Collimators : design status
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
RC1 Prototype Conceptual Design Review 15 December, 2005
LHC Collimator – RF Contact Concept (180o wrap)
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
US LHC Accelerator Research Program
accident deformation – doyle 1/8
Phase II Collimator, Alternative Jaw Simulations
Presentation transcript:

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation LARP Collimation – Engineering & Analysis BEAM 2 BEAM 1

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle2/20 LARP Collimation – Engineering & Analysis Overview Review NLC consumable collimator Compare NLC & LHC requirements Conceptual design: NLC collimator as adapted to LHC Thermal performance of candidate materials Unresolved issues

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle3/20 NLC Consumable Collimator BPMs (not shown) at inlet & outlet Aperture is sole internal degree of freedom. Movers align collimator to beam as sensed by BPMs

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle4/20 NLC Consumable Collimator Rigid datum structure aligned to beam by BPMs Aperture control mechanism: Thermal effects limited to small region Heat dissipated by radiation.  T = 10W/jaw

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle5/20 NLC Test Unit Cutaway Dual ball bearings preloaded for tilt- stability Aperture support one end of rotor only

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle6/20 NLC Aperture-control Mechanism Located at one end of rotor only. Tilt–stability not well controlled in test unit.

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle7/20 NLC Aperture-Defining Geometry One independent variable (stop roller spacing) defines aperture. s = stop roller spacing

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle8/20 Major Differences - NLC & LHC Specs SpecificationNLCLHCComments beam pipe ID1cm8.4cmSpatial constraints due to beam spacing jaw length~10 cm120 cmjaw tilt-stability gap range0.2 – 2.0mm0.5 – 60mmSpatial constraints SS power, per jaw~1W – 10W~1kW – 10kW (material dependent) LHC requires water cooling

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle9/20 LHC Collimator Mechanism Concept Basic NLC design morphed to fit LHC constraints 1.2m long jaws, 150mm diameter Helical coolant supply tubes flex, allow one rev of jaw Aperture supported a both ends for stability, tilt adjustment Also shown: aperture support at jaw center thermal deflection away from beam no tilt control Jaws hidden to show structure

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle10/20 Thermal Distortion ANSYS Simulations - 150mm OD, 25mm wall, 1.2m long - Simply supported - FLUKA heat generation for 10x10x24 rectangular grid mapped to similar area of cylinder - Steady state: 1hr beam lifetime - Transient:10 12 min beam lifetime - I.D. water-cooled 20C, h=11880 W/m^2/ - Various materials: Al, 2219 Al, Be+Cu, Cu, Invar, Inconel -Ti, W rejected based on 2-D analysis - Variations - limit cooling to 45 o arc - solid cylinder - jaw cut in two shorter pieces Cu, 61C  x=221 um support beam 10  apertures

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle11/20 61C  x=221  m Spec: 25  m support 89C  x=79  m Note more swelling than bending Note transverse gradient causes bending Note axial gradient 360 o cooling of I.D. 45 o cooling arc 64% less distortion

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle12/20 Material Comparison for SS & Transient Thermal Deflection Green: meets alternative spec of 50um (SS) and 200um (transient). Notes: 1.BeCu is a made-up alloy with 6% Cu. We believe it could be made if warranted Al is an alloy containing 6% Cu 3.Cu/Be is a bimetallic jaw consisting of a 5mm Cu outer layer and a 20mm Be inner layer 4.Cu – 5 mm is a thin walled Cu jaw 5.Super Invar loses its low CTE above 200C, so the 152um deflection is not valid

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle13/20 Jaw Materials - discussion Only graphite meets the 25um deflection spec for both operating cases. Be-containing jaws meet the spec for the SS case but not for the transient. –Be is unacceptable for environmental/safety reasons. Al benefits from the reduced (45 o ) cooling arc. –nearly meets the spec for SS condition –Excessive deflection for the transient What next? –Divide jaw in shorter sections –Use center-of-jaw aperture stops - jaw deflects away from the beam –Revisit materials not modeled in 3-D: W & Ti

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle14/20 Effect of shortened jaws, dense material, carbon pre-radiator Notes: 1.Aperture transition from 10  to 7  2.7  cases based on CERN ray files for interactions in TCPV 3.pre-radiator – Phase I carbon collimator concentrates energy deposition toward front of Phase II jaw.

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle15/20 Shortened jaws/dense material - discussion Dividing jaws beneficial –Short front jaws more swelling than bending Cu jaws nearly meet relaxed specs W jaws look good, but: –temperatures and power densities very high (cooling system) –deflections much greater if referred to jaw centerline What next? –Increase cooling arc in W jaws –Simulate single 48cm W jaw –Calculate cooling system loads

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle16/20 Conceptual design - coolant channels Limited cooling arc: free wheeling distributor – orientation controlled by gravity – directs flow to beam-side axial channels regardless of jaw angular orientation. Far side not cooled, reducing  T and thermal distortion. 360 o cooling by means of a helical channel. Lowers peak temperatures but, by cooling back side of jaw, increases net  T through the jaw, and therefore thermal distortion. Could use axial channels.

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle17/20 Conceptual design - Stop Roller Details Ball screw (stationary) Ball nut (turned by actuator outside vacuum chamber). Thrust bearing Hole for beam passage As shown in current model: aperture range limited to ~ 10mm. This can be improved but this mechanism will not be able to produce the full 60mm aperture. Auxiliary jaw retracting mechanism needed. Also note vulnerability of mechanism to beam-induced heating.

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle18/20 Beam’s Eye View of Aperture Mechanism Jaw retracted, aperture ~60mm

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle19/20 Geometrical limits due to 150mm rotor, 224 mm Beam Axis Spacing 30mm jaw travel (in red) causes jaw to intersect adjacent beam pipe. No space for vacuum chamber wall. Resolution: 1) smaller jaw diameter 2) vacuum envelope encloses adjacent beam pipe 3) less jaw motion 4) reduce diameter of adjacent beam pipe.

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle20/20 Alternate Stop-Roller Design

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle21/20 Status of Phase II LHC Collimator Concept Deflection spec will be very hard to meet –Relax deflection spec –Allow use of Be –Reduce jaw length Aperture stop mechanisms vulnerable to beam heating/damage –Relocate ball screw outside beam path – like NLC (jaw ends only) –Stop rollers unavoidably within region of beam pipe Combine NLC rotary jaws with LHC positioning mechanism Space limitations prevent 60mm max aperture with 150mm o.d. jaws –Reduce jaw diameter Will likely increase deflection Adversely affects aperture stop mechanism –Reduce opposing beam pipe diameter –Include a pass-through for the opposing beam in the collimator vacuum chamber –Reduce the maximum required aperture

LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle22/20 Status of Phase II LHC Collimator Concept - continued Cooling system loading is problematic for dense jaw materials Other engineering issues –Jaws must fully retract in power-off condition Spring load jaws outward. Inward-forcing springs (necessary in any case) sized to overcome outward-forcing springs and grounded on solenoid or pneumatic device which gives way when power is off. –Design of flexible coolant supply tubes –Manufacturability of jaws (material dependent) –How to apply heat loading for testing –Rotor indexing mechanism