Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.

Slides:



Advertisements
Similar presentations
Development of WM strategy and implementation 1. Clarification of dominant nuclides and important characteristics of waste ( Cs only? with long-lived nuclides?
Advertisements

Exemption, Clearance, Discharges
Environmental Safety Case and Changes to Waste Acceptance Date: 25th April 2012 Dr Richard Cummings – LLWR ESC Project Manager Presentation to: Customer.
Status of Fusion Nuclear Data Development Mohamed Sawan Tim Bohm U. Wisconsin-Madison Fusion Neutronics Team.
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers L. El-Guebaly and the ARIES Team Fusion Technology Institute University.
Recycling Issues Facing Target and RTL Materials of Inertial Fusion Designs L. El-Guebaly, P. Wilson, M. Sawan, D. Henderson, A. Varuttamaseni and the.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
ARIES Meeting April 22-23, 2002 U. Wisconsin, Madison Work performed under the auspices of the U. S. Department of Energy by University of California Lawrence.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
Summary of FS Lifetime Assessment and Activation Analysis L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison ARIES E-Meeting October.
Initial Activation Assessment for ARIES Compact Stellarator Power Plant L. El-Guebaly, P. Wilson, D. Paige and the ARIES Team Fusion Technology Institute.
Accident assessment for DCLL DEMO design Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA March 2-4, 2005 Work performed under the auspices of the.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
MODULE “STRATEGY DEVELOPMENT”
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
1 The role of rare metals as critical supply chain bottlenecks in priority energy technologies A European Commission – JRC study.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT FUSION REACTOR RADIOACTIVE WASTES: results, recycling, open issues and R&D W.Gulden, S.Ciattaglia EFDA Close.
Fusion Blanket Technology
TM Technical Meeting on the Disposal of Intermediate Level Waste
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
Estimation of storage capacity needed or limits. Comparison with existing storage facilities. Lise-Lotte Spontón TW5-TSW-001, D4 Final meeting, TW5-TSW-001.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Practical Implications of changes to the Exemption Orders for Project Teams Alan Fisher, on behalf of The Clearance and Exemption Working Group.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
Experimental validation of FENDL-3 nuclear data library Paola Batistoni ENEA - Fusion and Nuclear Technology Dept. Frascati - ITALY FENDL-3 1 st Research.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
Evaluation of the radiological consequences of tritium present in radioactive components from fusion reactors Task TW4-TSW-001-D1b: Waste and decommissioning.
Pacific Northwest National Laboratory U.S. Department of Energy TBM Structure, Materials and Fabrication Collaboration Issues R.J. Kurtz 1, and A.F. Rowcliffe.
Laser IFE Meeting November 13-14, 2001 Crowne Plaza Hotel, Pleasanton, CA Work performed under the auspices of the U. S. Department of Energy by University.
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
David G Bennett December 2014
LEADER meeting WP2 – Task 2.5 DPA, dose and activation calculations D. Gugiu (INR) – C. Petrovich (ENEA) Karlsruhe, November 21 st 2012.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
IAEA International Atomic Energy Agency PGEC Part VI Planned Exposure Situations - Generic Requirements Module VI.3 Requirements for public exposure in.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Task Force S1 J.Ongena 19th IAEA Fusion Energy Conference, Lyon Towards the realization on JET of an.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
European Fusion Power Plant Conceptual Study - Parameters For Near-term and Advanced Models David Ward Culham Science Centre (Presented by Ian Cook) This.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
NuLeAF Seminar NDA Integrated Waste Management Strategy Programme update 24 th October 2012.
The Neutronics of Heavy Ion Fusion Chambers Jeff Latkowski and Susana Reyes 15 th Heavy Ion Inertial Fusion Symposium Princeton, NJ June 9, 2004 Work performed.
Gunnar Olsson and Lise-Lotte Spontón
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
Some technological problems of fusion materials management Boris N. Kolbasov a *, Laila El-Guebaly b, Vladimir I. Khripunov a, Youji Someya c, Kenji Tobita.
1 Radiation Environment at Final Optics of HAPL Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI HAPL Meeting ORNL March.
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
Background - Federal Legislation
Summary of Nuclear Input for Safety Analysis for the DCLL TBM -update-
Development of Methodology for Cost-Effectiveness Analysis of Decommissioning Waste Management Scenarios Decommissioning costing in relation to the waste.
Report on the outcome from the consultancy
RSA 93 Exemption Order Review – a regulator’s view.
NRC Update of LLW Emerging Issues
DETECTION LIMITS < 1 ppt ng/L 1-10 ppt ng/L ppt ng/L
Introduction: IAEA activities / Documents on human intrusion
Presentation transcript:

Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin EURATOM/UKAEA Fusion Association TW5-TSW-001&002 final meeting Culham Science Centre, October 2006

TW5-TSW-001 final meeting, Culham Science Centre, October /17Background European Fusion Programme strategy for fusion irradiated waste:  Release from regulatory control mildly activated material, usually lifetime, bulky, outer components: TFC, VV, LTS.  Recycle within the nuclear industry (fission/fusion) the rest. PPCS radioactive waste results: all material cleared/recycled within 100 years, but:  Release criteria: out-of-date IAEA clearance levels (1996).  Lack of detail in the models (e.g. outer components).  Inadequate modelling of particular materials (e.g. LiPb).  Recycling criteria based on radiological parameters only, which were imprecise and over-conservative.

TW5-TSW-001 final meeting, Culham Science Centre, October /17Background IAEA 1996/2004 clearance levels: many changes affect fusion- relevant radionuclides (e.g. 30-fold decrease in Ni-63 level). TW5-TSW-002 D1 report on implications, TW5-TSW-001 D3 report on specific effects on PPCS-AB.

TW5-TSW-001 final meeting, Culham Science Centre, October /17Background PPCS recycling criteria: some sensible for certain waste streams following certain routes (e.g. re-melting of steels); “complex recycling” limit is: (a) noticeably over-conservative and (b) uncertain: depends on route followed ! waste categorisation criteriacontact dose (mSv/h) decay heat (W/m 3 ) CI Permanent disposal (PDW)> 20> 10 Complex recycling (CRM)2 – 201 – 10 Simple recycling (SRM): remote hands-on < 2 < < 1 Clearance< 1

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Scope and objectives To review and update PPCS work using:  Up-to-date international clearance levels: IAEA  Up-to-date nuclear data: EAF  Practical feasibility criteria: findings of this task.  More accurate modelling methodology (e.g. LiPb flow) and increased level of detail (e.g. TFC and breeder materials). With the aim of:  Determining more realistic amounts and activation features of the material inventory.  Identifying interim decay times required during recycling.  Identifying potential for (a) reduction of waste, and (b) simplification of processes.

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Material inventory PPCS-AB based on the HCLL blanket concept, PPCS-B based on the HCPB blanket concept.

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Industry experience Distinction between recycling and refurbishment:  Refurbishment: little or no processing, on-site, immediate or early reuse in the fusion plant (e.g. LiPb, ceramics).  Recycling: greater processing, off-site, later reuse in the nuclear industry in general. Recycling strategies in the industry exist for:  Very low activity: fabrication of simple components.  Very high activity: de-activation and re-fabrication of internals. Recycling routes envisaged for all PPCS-AB and PPCS-B materials (TW5-TSW-001 B report).

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Radiological levels Use radiological levels to ascertain storage times needed for the activity to decay to levels facilitating recycling processes:  Clearance: C.I.  Lower RH needs: contact dose rate.  Lower cooling needs: decay heat rate.  Easier transport: ?

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Computational tools and models

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: clearance New IAEA levels  increased amounts of material to be recycled: OB VV and IB TFC. Time scales: few years OB, few decades IB. Segregation alleviates this.

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: refurbishment Refurbishment of LiPb is possible and reduces considerably the amount of operational waste (from to tonnes). PPCS-B ceramic breeder and other materials also possible, but much lower impact  strategic value?

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: recycling PPCS-AB results:  Ex-vessel: most materials, individually or as TFC, VV and LTS, show contact dose rates < 2 mSv/h (earlier OB than IB).  Ex-vessel: many of these show < 0.01 mSv/h after suitable decay time (few years OB, several decades IB).  In-vessel: poloidal variation is negligible.  In-vessel: all Eurofer and LTS neutron shield (WC) show contact dose rates < 2 mSv/h after ~75 years.  In-vessel: LiPb breeder and W armour still exceed 2 mSv/h after 100 years: Dominant nuclides arise from Pb and W isotopes, hence impurity control not very useful in this case!  isotopic separation needed.

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: recycling - impurities W and LiPb  PPCS specifications contain many impurities: (a) manufacturer limits, (b) detection limits. Co, Ni, Nb, Mo, Eu, Sm, Gd, Tb, Pt, Ir, Pb, U, Th, Bi, Ag, Cd, Ba, Tl, Co, Nb

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: recycling - impurities PPCS-B results:  In-vessel: again, (nearly) all Eurofer and LTS neutron shield (ZrH) show < 2 mSv/h in ~75 years.  In-vessel: Li 4 SiO 4, Be and W armour, however, do not meet this target  Li 4 SiO 4 and Be dose entirely due to impurities: Co, Ni, Nb, Mo, Eu, Sm, Gd, Tb, Pt, Ir, Pb, U, Th, Bi, Ag, Cd, Ba, Tl, Co, Nb

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Results: decay times component / constituent / material10 4 mSv/h100 mSv/h2 mSv/h0.01 mSv/hCI < 1 OB TFC / case rear / 316ss<1d OB TFC / radial plates / 316ss<1d OB TFC / case front / 316ss<1d 2y45y OB TFC / epoxy-glass / 316ss<1d OB TFC / conduits / incoloy<1d OB TFC / cable / SC strand<1d OB VV / rear wall / 316ss<1d 10y45y OB VV / radial plates / 316ss<1d 5y50y>1000y OB VV / front wall / 316ss<1d25y58y>1000y OB LTS / structure / eurofer180d25y50y>1000y OB LTS / neutron shield / WC10d15y55y>1000y blanket / manifold / eurofer15y45y80y>1000y blanket / BZ / eurofer10y35y70y>1000y blanket / BZ / LiPb (5 fpy)120d15y90y>1000y blanket / BZ / LiPb (30 fpy)120d25y>1000y blanket / FW / eurofer15y45y80y>1000y blanket / armour / W5y45y500y>1000y

TW5-TSW-001 final meeting, Culham Science Centre, October /17Summary Upgrading PPCS work on PPCS-AB and PPCS-B radioactive waste analysis using recent regulations, new nuclear data, improved modelling and realistic recycling scenarios. Assess clearance/refurbishment/recycling potential and interim decay times. Results:  new IAEA levels increase amount of material to recycle;  clearance is achieved within few years (OB) or few decades (IB);  most recycling material below 2 mSv/h after ~75y of decay;  are these acceptable time scales?

TW5-TSW-001 final meeting, Culham Science Centre, October /17Summary Three key issues to optimise fusion recycling strategy by reducing amount of material, secondary wastes and/or radiological levels:  Segregation of materials  Refurbishment  Impurity control Further work:  Shielding issues, particularly in PPCS-B  Transport requirements?  New categorisation?  Radioactivity build-up due to (a) impurities and (b) reuse.

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Fusion materials strategy – open

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Fusion materials strategy – closed

TW5-TSW-001 final meeting, Culham Science Centre, October /17 Fusion materials strategy: radiological levels and classification criteria? – simple transport RHR – complex transport