SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February.

Slides:



Advertisements
Similar presentations
& Géraldine Conti May 21, 2007Monday Seminar 1 Detector Boxes Fiducialisation IT Frame Survey.
Advertisements

Solomon William KAMUGASA
Micro-triangulation for high accuracy short range measurements of dynamic objects Vasileios Vlachakis 1 st PACMAN Workshop February 2015 CERN, Geneva,
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
EN Seminar The Challenges for Survey and Alignment in CERN Experiments 13 November 2014 Jean-Christophe Gayde EN/MEF-SU.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Special Linac WG meeting: Assembly of the ISOLDE Cryomodules – HIE-ISOLDE Survey and Alignment – March 19 th 2014 Jean-Christophe GaydeEN/MEF-SU Guillaume.
The Laser Reference Line Method and its Comparison to a Total Station in an ATLAS like Configuration. JINR: V. Batusov, J. Budagov, M. Lyablin CERN: J-Ch.
Modeling And Visualization Of Aboriginal Rock Art in The Baiame Cave
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Neutrino Platform Workpackages discussion EN-MEF-SU 17 September 2015 Beynel, Gayde, Mergelkuhl, Troillet EN/MEF-SU.
Development & validation of an absolute FSI network STATUS & NEXT STEPS SU internal meeting 16 July 2015 Solomon William KAMUGASA.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
A. Behrens BE-ABP-SU-EM 1 Forum on Tracking Detector Mechanics 04 July 2012 Survey and Large Scale Metrology of Tracking Detectors for LHC Experiments.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Deformations and Movements of CERN installations Mark Jones M. Jones, 28/10/2015 FCC Infrastructure and Operation Meeting.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Solomon William KAMUGASA
Survey activities during LS1 Dominique Missiaen On behalf of the SU section.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
Approach for Large Scale Metrology for
DT-LHCb coordination meeting 18 April 2016
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
LBNF CAD models, Drawings and Component list
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Recent developments on micro-triangulation
Geometric and Magnetic Measurements
Workshop on Tau-Charm at High Luminosity
SciFi option for neutrino target tracker
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
HL-LHC upgrade at IPHC news
Presentation transcript:

SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February 20 th, 2015

SU Experiment Metrology team SU-Experiment Metrology team is part of the Large Scale Metrology Section EN/MEF-SU Mandate: The geometrical infrastructure for the detector installation Detector metrology for assembly and alignment on the beam lines The as-built measurements following with the installation phases This includes: Prototypes Deformation tests, Quality control, Pre-assembly and Assembly in surface halls or in the caverns Alignment and Positioning 2 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Detectors and Experiments A Russian Doll like configuration What we see What we want to know Many coordinate systems to deal with such as: Sub-detectors, detectors, physics and survey system, CCS … Also true at detector level Link between inner parts and external references; Link between detector modules and the assembly fiducial marks 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 3

Where is SU-EM involved? LHC Experiments ALICE ATLAS CMS LHCb and Non-LHC NA61 NA62 CAST Isolde HIE-Isolde All experiments of North and East Areas etc. Survey for all the Experiments at CERN + ISOLDE and HIE-ISOLDE ATLAS LHCb ALICE CMS COMPASS HIE-ISOLDE AND OTHERS … 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 4

When is SU-EM involved? At all phases of the projects: At very early stage at the design phase Prototyping and tests Manufacturing Pre-assembly Assembly phases of detectors Experiment construction Alignment and positioning phases in the caverns or experimental areas during construction, Technical Stops, Shutdowns, Machine Developments Usual measurement precision (at 1 sigma level) Detector control at manufacturing before assembly mm (max. 0.5 mm) Deformation of detectors under special conditions ~ 0.1 mm Relative position of detectors wrt other detectors < 0.5 mm Absolute position of detectors wrt accelerator geometry < 1.0 mm 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 5

Survey Toolbox  Line of sight between instrument and object required! TOOLBOX Experiment metrology T3000 NA2 AT401 D3X HDS6200 SU software Commercial software TC Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Photogrammetry Image acquisition needs no stable station Photos taken on platform, scaffolding or cherry-picker Mobile System with ‘high’ precision Off-site interventions in factory (Pisa, Aachen…) Clean rooms, assembly halls and experimental caverns Inner detector components < 1m (1 sigma < 50 microns) Limited measurement time for large amount of points Short interruption for installation, production process Camera system PC (windows XP, W7) Nikon D2X–12MP / D3X–24MP (Full Frame) Wireless module Different lenses (17-28 mm) Top flash, ring flash Software AICON 3D Studio V – DPA PRO 7 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Photogrammetry References for scale Carbon fibre scale bars (max. 1.5 m) Geodetic measurements Targets Coded / non-coded Retroreflective / non-retroreflective Button targets Hubbs / GMS / Aicon Sticker targets of different types System optimized for measurement of signalized points only = highest precision  We have to access and touch the detector 8 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Photogrammetry examples Displacement and deformation of the Dipole coil during consolidation Photogrammetry of TT balconies and link to external fiducial marks 9 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Leica AT401 Laser tracker in “theodolite” housing As flexible and light as theodolite Measures on special prisms For different volumes (max. +/- 80 m) as : experimental cavern network individual detectors Instrument can be remotely controlled  automation possible (ALARA) Instrument has same support as theodolite  existing survey infrastructure can be used Specifications for precision 15µm + 6µm/m MPE 7.5µm + 3µm/m typical  Precision at 10m distance < 0.05mm typical (1 sigma) Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Leica AT401 AT401 is measuring with respect to previous equipment: 5x better for distances 2x better for angles Targets are prisms with 1.5” and 0.5” diameter and adapters Interchangeable tooling to photogrammetric and total station targets Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Leica HDS D Laser Scanner Up to points/sec Phase shift distance measurement Point accuracy at 5m = +-3mm Spot size = 10m Field of view: 360° x 310° Point cloud as result HCAL module IT, OT and Dipole area 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 12 As built / Integration Other 3D scanners existing Better precision … Needed for upgrade?

Low material target and support Additional flash R&D First results SU-EM is also involved in development of monitoring systems Example: IT monitoring system - Collaboration SU-EM / LHCb / IT / EPFL Monitoring system development 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 13

SU-EM involvement must start at very early stage Discussion with coordinators / project leaders / physicists / engineers / designers Define precisely the needs and find reasonable solutions What has to be measured? With respect to what? At what stage? Where? What is the required precision / error budget? Define all stages when survey will be needed Include alignment to the design (references, integration work) Define local coordinate systems Estimation of the resources needs This is extremely important Without this survey could be impossible Standards exist / suitable solutions can be discussed 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 14

Detector preparation Survey reference points / Fiducial marks Different survey targets have to be placed on object 3D – survey reference hole  best solution, highest flexibility 8H7 reference hole 28 mm contact surface 15 mm depth 20.0 mm WARNING: the values are given as indications Every new values must be discussed and agreed! Define survey reference holes on detector Already early in the design phase Reference hole accessible and visible during ALL phases At relevant position on stable support On individual detector elements as later on assembled groups For theodolite, laser tracker or photogrammetry Coordinates are given at the centre of survey target Sensitive elements are referred to reference holes by constructor Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

In order to help in the preparatory stages 20 Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU) 16

Summary and future upgrade SU-EM can be involved in survey requests for detector upgrades Design / Validation / Test phase / Construction / Installation Survey is flexible in method and can adapt it to working conditions SU-EM decides as function of the constraints the optimal technique Measurement equipment has progressed since LHC construction An early discussion for each individual detector is necessary Permanent contact between SU and detector responsible SU participation at early stages Include survey needs in the design  References carry the detector geometry information  NO references  High risk that NO precise survey can be performed!  Mechanical adjustment systems need also to be integrated Detector installation/maintenance will be more complex – ALARA Questionnaire can be found at: Feb 2015 Infrastructure For LHCb Upgrade Workshop J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)

Thanks for you attention

Proposal of a BCAM based monitoring system Coordination of the project with resources from LHCb  Integration / Design / Mechanic / Installation / Cabling  DAQ and processing software Integrated to the LHCb control system Movement monitoring from the LHCb Ctrl Room with a precision of 30 microns LHCb RICH1 Gas Enclosure and Shielding monitoring Monitoring during magnet ramp-up 20 Feb 2015J-Ch GAYDE / Pascal SAINVITU (EN/MEF-SU)19