GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.

Slides:



Advertisements
Similar presentations
Archive Requirements Working Group A NOAA clearinghouse for requirement planning in support of the science objectives related to archive, access, and reprocessing.
Advertisements

WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries National Water Quality Monitoring Council October 31, 2006.
INTEGRATION OF SURFACE OBSERVING SYSTEMS TECO-2005 May 5, 2005 Bucharest, Romania Rainer Dombrowsky, NOAA.
Breakout Session Thematic Areas How can R3 contribute to connecting user needs with GOES-R capabilities in the following areas? High-Impact Weather (Johnson)
Training actions from SPG/UR mtg 1. Develop an Integrated Satellite Training Plan (GOES R, SNPP/JPSS, Himawari, etc.) + resource request 2.Plan to provide.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Project Title Project Investigators Project Duration: (E.g., 3 years; currently in year 2, or x months if this is a better representation of project time)
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
1 IOOS Status of Planning & Implementation Background –Milestones Implementation Plan, Part I –Governance of the IOOS Implementation Plan, Part II –The.
Center for Operational Oceanographic Products and Services (CO- OPS) NOAA/ National Ocean Service.
Climate Futures and Oregon’s Coastal Communities A Survey and Strategy to Address the Effects of Climate Change on the Oregon Coast.
Background Roundtable of Federal Hazard Mitigation Partners in the Pacific Islands (FHMPPI) (2002 – 2003) Pacific Risk Management `Ohana (PRiMO) (2004.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
Coastal and Marine Spatial Planning Debra Hernandez, SECOORA Walter Johnson, BOEMRE Ru Morrison, NERACOOS Charly Alexander, IOOS Office.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
US Climate Change Science Program Incorporating the US Global Change Research Program and the Climate Change Research Initiative U.S. Climate Change Science.
GOES-R User Readiness Planning Kathy Fontaine USRP Lead GOES-R GS Project Satellite Direct Readout Conference Miami, FL April 12, 2011.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Decision.
Gulf of Mexico Alliance SIMOR Briefing June 9, 2009.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Dr. David Mowat June 22, 2005 Federal, Provincial & Local Roles Surveillance of Risk Factors and Determinants of Chronic Diseases.
The USA National Phenology Network Phenology for science, management and public engagement in a changing world.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
Advancing Natural and Nature-Based Infrastructure Solutions through Policy and Partnerships Kim Penn, NOAA Office for Coastal Management.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Algorithm.
ESIP Federation Air Quality Cluster Partner Agencies.
M u l t I b e a m III W o r k s h o p M u l t I b e a m III W o r k s h o p National Geophysical Data Center / World Data Centers NOAA Slide 1 End-to-End.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
2 Capitol Hill Oceans Week Wonders of the Ocean World: Creating an Ocean Literate Society June 10, 2004 Richard D. West Rear Admiral, USN (Ret.) President.
NAS Board on Research Data and Information (BRDI) 30 November 2010 Gregory W. Withee Co-Chair, USGEO International Working Group Director, International.
Better Preparing the NWS to meet America's Growing Needs Information Brief 1.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
Ocean.US and Coastal Ocean Applications and Science Team (COAST) Larry Atkinson September 2004 Corvallis.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights User.
Presenters: David M. Kennedy, Director, NOAA Office of Ocean & Coastal Resource Management Margaret A. Davidson, Director, NOAA Coastal Services Center.
A National Hazards Information Strategy (NHIS) Helen M. Wood Director, Office of Satellite Data Processing & Distribution “A coordinated approach for using.
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
The State Climatologist Program and a National Climate Services Initiative Mark A. Shafer Oklahoma Climatological Survey University of Oklahoma.
NOAA Council on Long-Term Climate Monitoring (CLTCM) Eighth Meeting in Chicago, Illinois, March The Council identified three strategic issues.
UNCLASS1 Dr. Gene Whitney Assistant Director for Environment Office of Science and Technology Policy Executive Office of the President WISP Meeting - July.
Future Integrated Satellite Architecture Brief to Third GOES-R Users Workshop Broomfield, Colorado Michael Crison NOAA Satellites and Information Service.
The Integrated Ocean Observing System (IOOS) is envisioned as a coordinated national and international network of observations, data management and analyses.
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
National Tsunami Hazard Mitigation Program
User Readiness Issues for GOES-R Jim Gurka Tim Schmit (NOAA/ NESDIS) Tony Mostek (NOAA/NWS) Dick Reynolds (Short and Associates) 4 th GOES Users’ Conference.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Data.
Vision of an Integrated Global Observing System Gregory W. Withee Assistant Administrator for Satellite and Information Services National Oceanic and Atmospheric.
Asia Flood Network— A USAID Program for Flood Mitigation and Preparedness in Asia Asia Flood Network Program Objective –Identify and fill gaps in end-to-end.
DA Task Report Report by Rick Lawford and Toshio Koike ADC Meeting September 2008 Boulder.
October 2, 2002National Climatic Data Center GOES USERS CONFERENCE October 2,
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
GOES-R Series User Readiness Planning and Development May 12, 2004.
User Readiness Issues for GOES-R Jim Gurka Tim Schmit (NOAA/ NESDIS) Dick Reynolds (Short and Associates) 4 th GOES Users’ Conference May 2, 2006 Broomfield.
1. 2 NOAA’s Mission To describe and predict changes in the Earth’s environment. To conserve and manage the Nation’s coastal and marine resources to ensure.
U.S. Integrated Ocean Observing System (IOOS ® ) National Glider Data Assembly Center.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Numerical.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Technical Workshop for Climate Services Portal Development: Setting the Stage National Climatic Data Center Asheville, NC August 13-15, 2008.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
CEOS Response to GEOSS Water Strategy
DA Task Report Data Integration and Analysis System
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Unidata Policy Committee Meeting
The GEO AquaWatch Initiative CEOS “Freshwater from Space” Workshop
Recent activities of OCR-VC
Presentation transcript:

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights Oceans and Coasts Richard Legeckis, NOAA/NESDIS Office of Research and Applications

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1) Needs for Data and Product Distribution User Interface for product and data distribution User Interface for product and data distribution True Color Product for cloud clearing and outreach (true color captures imagination of public) True Color Product for cloud clearing and outreach (true color captures imagination of public) Metadata availability (start/end time, lat/lon, etc.) Metadata availability (start/end time, lat/lon, etc.) Reprocessing for Climate Data Records Reprocessing for Climate Data Records Access to real-time data and products Access to real-time data and products

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC 2) User Community Training Public Education/Outreach Public Education/Outreach It needs to happen NOW It needs to happen NOW Coordinate with other observing systems programs Coordinate with other observing systems programs Sponsor internships with k-12 educators Sponsor internships with k-12 educators Data Use Training Data Use Training U.S. Naval Observatory Model U.S. Naval Observatory Model Understand relationship of GOES-R data in context of other observing systems Understand relationship of GOES-R data in context of other observing systems Establish network users groups Establish network users groups Smart Portal Smart Portal

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC 3) What can NOAA do, programmatically, to prepare for GOES-R, in a manner that is both accountable and defendable? Implement distribution and training methods before 2012 Implement distribution and training methods before 2012 Respond to Ocean Commission recommendations – GOES-R is an important contribution in response to Commission Respond to Ocean Commission recommendations – GOES-R is an important contribution in response to Commission Work better with other federal agencies (NASA, EPA, FEMA) Work better with other federal agencies (NASA, EPA, FEMA) Transfer knowledge from other organizations (e.g., NASA) to NOAA for ocean color processing Transfer knowledge from other organizations (e.g., NASA) to NOAA for ocean color processing Stress GOES-R relationship to other high priority initiatives Stress GOES-R relationship to other high priority initiatives Blue water/White water Blue water/White water North American Carbon Program North American Carbon Program Integrated Ocean Observing System Integrated Ocean Observing System Carry out risk reduction efforts & milestones Carry out risk reduction efforts & milestones

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC 4) GOES-R Risk Reduction Establish test bed (proving ground) for all components of the end-to-end GOES system, acquisition to archive Establish test bed (proving ground) for all components of the end-to-end GOES system, acquisition to archive Develop simulated coastal and ocean observations for GOES-R Develop simulated coastal and ocean observations for GOES-R Put user in the feedback loop on research to ops Put user in the feedback loop on research to ops Develop cost, schedule, and technical as separate RR components Develop cost, schedule, and technical as separate RR components Establish focused coastal and ocean user group Establish focused coastal and ocean user group Prepare white paper on recommendations Prepare white paper on recommendations Work with the regional associations of IOOS Work with the regional associations of IOOS

GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC 5) User Readiness Timeline Critical need: Coastal water characterization (in situ calibration) Critical need: Coastal water characterization (in situ calibration) Test end-to-end GOES-R system before launch Test end-to-end GOES-R system before launch Test simulated products Test simulated products Determine concept of operations for HES/CW, survey vs. targeted Determine concept of operations for HES/CW, survey vs. targeted Develop priorities for targeted surveys Develop priorities for targeted surveys Define products and applications now Define products and applications now