GOOD AFTERNOON. PRESENTATION ON COST REDUCTION BY QUALITY ASSURENCE.

Slides:



Advertisements
Similar presentations
Energy Conservation Mike Klun Cargill. Getting Started (Planning) Why do I want to do this? – Cost reduction or environmental impact Will I be successful?
Advertisements

Total Productive Maintenance
Statistical Quality Control Basic Concepts Product Control Process Control Variations in Quality.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
QA Programs for Local Health Departments
Chapter 4 Quality Assurance in Context
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
ISO 9001 : 2000.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Quality Assurance System
Quality Management System
Chapter 6 Total Quality Management Chapter Outline Quality imperative.
Statistical Process Control
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Quality Assurance VS Quality Control
Chapter 11 Quality Control.
“ to observe closely ” Focus Tech Solutions.
Asphalt Quality Assurance Program
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
S9k Preventive Maintenance & Equipment Inventory.
Introduction to Quality, Cost & Delivery
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
NCR Confidential NCR Supplier Quality Webcast June Bob Ciminera - Vice President Strategic Sourcing Robert Mele - Vice President, Quality and Continuous.
Sustainable Consumption and Production
1 © Mahindra Satyam 2009 Quality Management System Mahindra Satyam’s Quality Guide ISO Slides.
Subjects: Traceability / Pocess Control / Inspection
4. Establishing goals to guide & Measures to track.
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Support Programs version 2 March 2010 Cleaning and Sanitation
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Office of the Inspector General 2009 Annual and Activity Reports Summary Presented by Oscar Chavera, Acting Inspector General.
Inventory Flowchart Page 6 Bill Liang Ricardo Gutierrez Tina Tsou Jesus Mercado.
Psychiatry-Oriented Analysis of Multimedia Impact on E-Commerce CMMI maturity level 2 An improvement path for advertising efficiency.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
SUBMITTED TO: SUBMITTED BY: ADARSH KUMAR SHUBHANKER VERMA (H.O.D.) ME/08/8842 RAJESH CHAUDHARY VARUN KR. SHARMA (PROJECT MANAGER) ME/08/8868.
Continuing Analysis and Surveillance System (CASS) 03/06/59 1 AIRCRAFT MAINTENANCE Section 10.
EPP/EMS Integration Example Paint. Points of Integration in EMS Environmental Policy Environmental Aspects Legal and Other Requirements Objectives, Targets.
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
WHAT IS DEFECT ? Price of Non-Conformance. WHAT DO YOU THINK ABOUT? 1.Missing the key input product 2.Getting the wrong information from buyer 3.Passing.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011
A QUALITY IMPROVEMENT TOOL
MTA New York City Transit 2011 Safety Initiatives Transit Riders Council Meeting December 22, 2011.
1 Quality in the Supply Chain Rob Burton - Intertek.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
Economic Justification. Good Enough Quality Time to market Time to market Time to profit Time to profit.
File 5 Duplex Production Part 5 :. Now, offer to Quality Department.
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
Quality & Regulatory Expectations of Outsourcing Oversight Nicky Dodsworth, VP Global Quality Assurance.
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
Internet Marketing Company How To Find Diamond From Clutter Internet marketing is the usage of the World Wide Web to provide online shopping or advertisement.
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
5.4 Quality Assurance Chapter 33.
DTF CONSTRUCTION MONITORING
IECEx 02 Audits according to OD 005 Theo Pijpker
4.5 Checking and Corrective Action Monitoring and Measurement
GLAST Large Area Telescope:
AS 9100 Awareness Training.
Chapter 11 Quality Control.
Quality Control & Assurance
Presentation transcript:

GOOD AFTERNOON

PRESENTATION ON COST REDUCTION BY QUALITY ASSURENCE

TARGET FOR YEAR % OF TOTAL COST

MAIN FACTORS INSPECTION COST GAUGE CONSUMPTION COST CALIBRATION COST REWORK COST OF POOR QUALITY SUPPLIER MATERIAL SEGGRIGATION COST

INSPECTION COST TARGET : 15 % OF 81,00000/Year (Total Saving 12,15,000) PRESENT STATUS : COST – / Month Managers– 3 Asst.Manager- 1 Sr.Engineers 4 Engineers 13 Inspectors - 2 Casuals inspectors at Final insp.– 62 Action Plan : Final Inspectors required – 37 Man Power Saving – 25 x 4000 x 12 = 12,00000 / Year

GAUGE CONSUMPTION COST Thread Gauges : 1,12500 Snap Gauges & Standard Gauges : 60,000 Air plug gauges + receiving Gauges :1,40,365 TOTAL PRESENT COST : Rs. 3,12,865 TARGET COST SAVING 20 % = Rs. 62,573 Action Plan : Minimize the 100 % inspection by 4M Analysis.

CALIBRATION COST PRESENT STATUS : TARGET 20 % = Action Plan : 1.Calibration frequency will be reviewed based on usage. 2.In-house calibration frequency will be developed instead of out side calibration

REWORK COST PRESENT STATUS : 3X4000X12=1,44,000/Year TARGET: 30 % (43,200) ACTION PLAN: 1.On job training started to operators and painters 2.More focus on paint shop Quality. 3.Man power fixing in painting booth 4.On line sending will be started 5.Straight pass ratio will be monitored on regullar basis

COST OF POOR QUALITY PRESENT STATUS: Rs.22,19,400/Month TARGET: 15 % (3,32,910) ACTION PLAN: 1.Man-Machine fixing to be done. 2.Rejection analysis to be monitored on regular basis. 3.Corrective and preventive action to be taken on daily basis. 4.More focus on process parameters. 5.Any change in process will be informed to QA.

SUPPLIER MATERIAL SEGRIGATION COST PRESENT STATUS:5X4000X12= 2,40,000/Year TARGET:20% (48,000) ACTION PLAN: 1.Regullar supplier audit will be started. 2.Material Segregation cost will be debited to supplier 3.Supplier training will be started. 4.Vendor meet will be started. 5.Supplier rating system will start.

TOTAL COST SAVING INSPECTION COST= 12,00000 GAUGE CONSUMPTION COST= 62,573 CALIBRATION COST= 14,297 REWORK COST= 43,200 COST OF POOR QUALITY= 3,32,910 SUPPLIER MAT.SEGG. COST = 48,000 TOTAL COST SAVING = 17,00,980 TOTAL COST =1,10,62,385 % COST SAVING = %

THANKS & HAVE A NICE DAY