Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.

Slides:



Advertisements
Similar presentations
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Advertisements

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Strasbourg status Ring 7 pilot run François Didierjean.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Turing Machine
UCSB Hybrid Bonding & Testing
FNAL Production Experience
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
Module Failures on RODs
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Bari production centre resp. M. de Palma
Damage under UCSB bias bonds
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
Module Testing at UCSB: Simulated Production 11-04
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
FNAL module testing summary
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg

FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been done on a dedicated K&S 8090 machine using a 2025 tool. We expect that the change from RMT to Planar pitch adapters will greatly reduce the number of PA repairs. RMT bond pad cleanliness has been an on-going issue. Bonding time does not include inspecting and cleaning bond pads, test pulling every 50 th sensor-to-PA bond, and post inspection of the wire bonds. The total process time should come down to about 30 minutes per module assuming better PA bond pads and much reduced destructive testing. Long times in mini-production summary reflect some problems with the bonding machine. Wire bond skipping is done by modifying K&S files through a PERL script.

Gantry meeting September 2003 Lenny Spiegel, FNAL 2 FNAL Bonding Bonds are skipped for pinholes (Idiel) and selected cases of Cac. ARCS testing following bonding revealed no new pinholes (17K bonds).

Gantry meeting September 2003 Lenny Spiegel, FNAL 3 FNAL Bonding Sen-to-PA pull test data for odd-numbered modules Units are in grams. RMT PA’s US power adjusted based on results.