17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.

Slides:



Advertisements
Similar presentations
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Cooling System Solutions
ConstraintsSolution ConsequencesOpportunities RE-TENDERING OF ST-CV MAINTENANCE CONTRACT Michele Battistin - CERN - ST/CV Group Workload Budget Lump-sum.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
U.S. ATLAS Executive Meeting Silicon M&OWBS 3.1 August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Survey Meeting John Osborne, CERN 8 February 2016
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
"If you know how to spend less than you get, you have the philosopher's stone." - Benjamin Franklin.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Transport and Handling Manpower Planning S. Prodon – LEAF
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Cryogenic safety organisation at CERN
Demineralised water cooling system
M. Battistin CERN EN/CV/DC 9th July 2009
Enterprise Content Management Owners Representative Contract Approval
Low temperature chiller Market Survey
Status of CO2 Cooling tests at CERN for Pixel phase 1
US Army Corps of Engineers Civil Works Audit: Journey to an Opinion Briefing for: ASMC PDI National Capital Region March 6, 2008.
Work and Service Supervisor
Presentation transcript:

17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and maintenance services

17 th November 20062M. Battistin On call and maintenance services costs (1) Spare part management and costs document is under construction now (2) Any R&D phase shall be financed on top of it

17 th November 20063M. Battistin Works advancement The stand-by duty service has been ready to start since September 2006

17 th November 20064M. Battistin Stand-by duty service is ready to start Framework: M&O agreement EDMS Internal procedure: EDMS Internal training executed on all the cooling station in operation Stand-by duty intervention Connection to DSS or DCS of the experiment ATLAS asked to start the service now

17 th November 20065M. Battistin Back-up

17 th November 20066M. Battistin A dedicated team will assure the service ½ section leader 1 engineer 1 fridge expert 1 electrical & control expert 1 pipe welder 1 technician (purchase, CAMMS, store) financed by TS LS on cost refund Staff funded by CERN-Experiment Agreement (Jul ’08) Cost related to manpower refund increases as the CERN-experiment agreement will phase out in the next years

17 th November 20067M. Battistin Maintenance cost 2.67% of the installation value gives minimum reference for maintenance cost estimation Installation value gives sharing criteria ½ manpower - ½ material (contractor interventions) - assumed Major spare parts (pumps, compressors, etc.) shall be considered “on top” of these amounts.