Alignment for 2010 run and n_TOF 2009 beam profile M. Calviani (CERN), S. Andriamonje (CERN), E. Berthoumieux (CEA), C. Guerrero (CIEMAT),

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advanced GAmma Tracking Array
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
Simulation of the spark rate in a Micromegas detector with Geant4 Sébastien Procureur CEA-Saclay.
Simulation of the spark rate in a Micromegas detector with Geant4 Sébastien Procureur CEA-Saclay.
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 central detector meeting : 2 december 2009 Cea Saclay CERN.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Vertex 2002 Kailua-Kona The heavy ionising particles in CMS tracker Hip effect description. The PSI beam test. Measurements of hip rate and induced dead.
N_TOF fission data of interest for ADS
experimental platform
A 4-PAD MicroMegas system for monitoring purpose at n_TOF facility (CERN) M. Sabaté-Gilarte 1,2 T. Papaevangelou 3, F. Gunsing 3, E. Berthoumieux 3, M.
Xiaodong Wang ( 王晓冬 ) School of Nuclear Science and Technology Lanzhou University, Lanzhou, China MPGD activities at Lanzhou University July 5, 2013.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Simulation of the spark rate in a Micromegas detector with Geant4 Sébastien Procureur CEA-Saclay.
MERIT analysis - Beam spot size Goran Skoro More details: UKNF Meeting, Oxford, 16 September 2008.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
Walid DRIDI, CEA/Saclay n_TOF Collaboration Meeting, Paris December 4-5, 2006 DAPNIA Neutron capture cross section of 234 U Walid DRIDI CEA/Saclay for.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
Status on 25 Mg(n,  ) and neutron flux in 2012 Bologna, 27 November 2013 C. Massimi.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Neutron Flux Measurement at the CYRIC T. Horiguchi and A. Ishikawa (Tohoku University) For the FPCCD group.
G4 Validation meeting (5/11/2003) S.VIRET LPSC Grenoble Photon testbeam Data/G4 comparison  Motivation  Testbeam setup & simulation  Analysis & results.
Measurement of 7 Be(n,  ) and 7 Be(n,p) cross sections for the Cosmological Li problem in Addendum to CERN-INTC /INTC-P-417 Spokepersons:
PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   Elizabeth Locci SPP/DAPNIA, Saclay, France Prague.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
N_TOF commissioning INTC-P-249 Spokespersons: J.L.Tain, V.Vlachoudis Contactperson: V.Vlachoudis th Nov 2009 for the n_TOF collaboration.
Detector alignment Stefania and Bepo Martellotti 20/12/10.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
RICH MEETING - CERN - April 21 st 2004 Università degli Studi di Milano Bicocca Variation of Refractive Index inside an Aerogel Block Davide Perego.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Status of n_TOF Facility
11. February th INTC Meeting, CERN, Geneva/Switzerland
Villa Olmo, Como October 2001F.Giordano1 SiTRD R & D The Silicon-TRD: Beam Test Results M.Brigida a, C.Favuzzi a, P.Fusco a, F.Gargano a, N.Giglietto.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Inclusive cross section and single transverse-spin asymmetry of very forward neutron production at PHENIX Spin2012 in Dubna September 17 th, 2012 Yuji.
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Horn focusing effect 2.Beam stability (direction/flux) 3.Beam.
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
ArgonneResult_ ppt1 Results of PoGO Argonne Beam Test PoGO Collaboration meeting at SLAC, February 7, 2004 Tsunefumi Mizuno
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
C. Guerrero “A first look to capture with fission tagging” n_TOF Analysis Meeting, CERN November 2010 A first look to capture with fission tagging.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
Analysis of LumiCal data from the 2010 testbeam
Update on Trigger simulation
Coatings for neutron conversion for n_TOF
Huagen Xu IKP: T. Randriamalala, J. Ritman and T. Stockmanns
Measurement of the fission cross-section of 240Pu and 242Pu at CERN’s n_TOF facility CERN-INTC , INTC-P-280 Spokespersons: M. Calviani (CERN),
n_ToF dump as a facility for Neutron Radiation Testing
The Status of the Data Analysis of the Beam Test at FZJ
Tracking System at CERN 06 and 07 test beams
Roberto Chierici - CERN
MINOS: a new vertex tracker for in-flight γ-ray spectroscopy
Pre-installation Tests of the LHCb Muon Chambers
n_TOF Annual Collaboration Meeting
Presentation transcript:

Alignment for 2010 run and n_TOF 2009 beam profile M. Calviani (CERN), S. Andriamonje (CERN), E. Berthoumieux (CEA), C. Guerrero (CIEMAT),

Outline 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN2 Alignment campaign review for 2009 and 2010, summary of activities Activities in 2010 Update on the experimental beam profile RESULTS AS OF APRIL 2010 (n_TOF Collaboration Board 04/2010)  Complete set of analysis routine now freely available /afs/cern.ch/exp/ntof/XYMG  Analysis now responsibility of CEA

Introduction – summary of 2009 observations 23 September 20103M. Calviani - n_TOF Analysis Meeting CERN Measured neutron fluence during the 2009 run was ~20% less than expected (comparison with simulations and old official fluence) n_TOF experimental beam profile  misalignment of the 2 nd collimator 11% of fluence recovered in November 2009  tilt of ~2 mm of 2 nd collimator (-8 mm upstr., -6 mm downstr.)! -9, -4 = -5 mm 0, -4 = +4 mm -4, -4 = 0 mm -8, -4 = -4 mm -7, -4 = -3 mm -6, -4 = -2 mm In 2010 the alignment has been performed by looking at the spallation target 5 cm left radially (looking at target) to intercept the maximum of the fluence NB: the theoretical beam line (with which the 2 nd collimator is aligned) has been defined by looking at the 1 st collimator center

Alignment campaign September 2010M. Calviani - n_TOF Analysis Meeting CERN4 Surveyor’s theoretical beam line defined with the following steps: 1. A theodolite is placed in the Escape Lane (FIC2 place), where fixed (2001) reference points are placed in the floor 2. Theodolite view is set to 0.67 ° proper inclination of the TOF line. For the radial direction, uses a reference in the EL 3. Observation: The center of the theodolite is very close to the mechanical center of the neutron window 1.Vertical ok 2.Horizontal is shifted by ~1 cm

Alignment campaign September 2010M. Calviani - n_TOF Analysis Meeting CERN5 The 1 st collimator is shifted up by 1.9 cm, left by 0.75 cm, looking to the target No information on the possible tilt Explains the 2009 movements on the 2 nd collimator ~9% decrease in fluence from the simulations Movement possible but not easy (not foreseen for now) NB: this shift was always in place, since the construction of the facility! 2010 Alignment will be performed by looking: Vertically  mechanical center of the window Radially  5 cm to the left of the mechanical center New reference points will be established in the EAR-WS

2010 plans on alignment 23 September 2010 M. Calviani - n_TOF Analysis Meeting CERN6 1. First measurements included the movement of the 2 nd collimator to try maximizing the fluence vertical movement only horizontal movement available but too risky for the moment (possible if beam profile show a significant horizontal skew) 2. SiMon + XYMG with 10 B or 235 U sample simultaneous profile and fluence variation evaluation borated water (*)  CEA data 235 U will allow to have a reasonable statistics in the HE part XYMG current routine (v. 2.8/2.9) limited by a significant dead-time (signal is ~200  s long) X-Y MicroMegas Silicon Monitor Monitoring MGAS

X-Y MicroMegas for n_TOF (1/2) M. Calviani - n_TOF Analysis Meeting CERN7  Detector based on the “bulk” technique  Active region is separated in two active regions: conversion (drift)  480 V amplification (mesh) gap  330 V  Anode segmented into 106 strips for each X and Y pad (tilted 90 deg.) Application for monitoring of the n_TOF neutron beam Neutron beam profile from thermal up to ~1 MeV Detector used for helping in the alignment of the experimental area experimental (almost real-time) position of the neutron beam 23 September 2010 n_TOF Collaboration Meeting 2009

X-Y MicroMegas for n_TOF (2/2) M. Calviani - n_TOF Analysis Meeting CERN8 Neutron converter, enriched 10 B 4 C, deposited by sputtering on a 3 cm radius on a coppered (1  m) kapton (12.5  m) substrate. thin ~ 24 nm thickness (no dead-time) thick ~ 2  m thickness (for the high energy part)  60 mm x 60 mm with 106 strips per pad  566  m pitch  212 channels too much for fADC  two multiplexer card based on Gassiplex concept have been used  2 output directly to the n_TOF fADC  Trigger signal is available through the mesh signal  n_TOF available Gassiplex is able to read only 96 strips (reduced active area)  DAQ and analysis routine have been specially developed Operation principle: Read consecutively all the X and Y strips 2  s per strip  total of ~192  s dead-time issues if the count rate is too high (but non-paralyzable) 23 September 2010 n_TOF Collaboration Meeting 2009

X-Y MicroMegas Analysis procedure (1/2) M. Calviani - n_TOF Analysis Meeting CERN9 Digitized Gassiplex signals are the input of the analysis Each mesh signal trigger the aperture of a gate of 192  s wide (T/H) In order to record MeV neutrons, the prompt flash is remove “by hardware” in the Gassiplex trigger stage 192  s Pedestal runs are needed to evaluate mean value of the signal is each of the strips + level shift Amplitude distribution of signals after pedestal subtraction and level shift correction (+/- 2 channels baseline) 23 September 2010 n_TOF Collaboration Meeting 2009

X-Y MicroMegas Analysis procedure (2/2) M. Calviani - n_TOF Analysis Meeting CERN10 Cluster analysis used to search for strips that have fired above the mean value of baseline (> 10 ch above baseline with >= 1 fired strip) “Center-of -charge” applied to define the interaction point Coincidence method to reconstruct a 2D image of neutron beam # fired strips >1 rotation of 225 deg. to obtain image as of neutron beam energy selection based on TOF 23 September 2010 n_TOF Collaboration Meeting 2009

X-Y MicroMegas 2009 results up to 1 keV M. Calviani - n_TOF Analysis Meeting CERN11 Assumed tilt is in agreement to what has been found during the 2 nd collimator alignment tests Fit on data performed on the base of a gaussian + step function th. - 1 eV 1 eV – 1 keV Simulation assuming perfect alignment Simulations assuming -2 mm tilt upstream 2 nd collimator th. - 1 eV 1 eV – 1 keV 23 September 2010

Updates on the experimental beam profile 2009 with XYMG  100 keV – 1 MeV 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN12 Horizontal Vertical

X-Y MicroMegas 2010 results 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN13 Beam profile run : Main observations: beam profile seems to be symmetric  effectiveness of 2 nd collimator alignment data at higher energy mainly limited by statistics (with analysis routine v2.9 (the latest by MC))  improved by updates by CEA

Analysis routines 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN14 1. Freely available (source included) at /afs/cern.ch/exp/ntof/XYMG 2. Detailed description of the routines can be found on as a private Internal Note (accessible to members of the e- group X-Y MicroMegas analysis: how to run the programs, n_TOF-INT , July 2010 New 2D MicroMegas detector for n_TOF beam profile: description and preliminary results, n_TOF-INT , July Now CEA has taken over the work and implemented the suggested improvements namely the integration of the mesh signal in the analysis, which will lead to an improved statistics better calibration especially at higher energies

For the future if needed: proposal for 1 st collimator 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN15 Needs for the 1 st collimator: 1.Understand if tilting is present (it may affect significantly the fluence) 2.Consider the possibility to shift it down into the proper location 2.Shifting Action complex by the fact that it requires lifting an heavy piece The downstream part is fixed into the wall The upstream part can be moved down removal of the filter station adjustment of the TOF line We can measure it with the help of a planar laser, similarly to what we did for the 2 nd collimator it requires some work and still an uncertainty of 1-2 mm is to be taken into account 1.Tilting Filter station 1 st collimator upstream downstream NB: geometer’s independent action

Conclusions 23 September 2010M. Calviani - n_TOF Analysis Meeting CERN16 1.n_TOF beam line up to the Experimental Area is aligned by looking at the spallation target neutron window 2 nd collimator is aligned accordingly 1 st collimator is shifted/tilted, no easy way to move it back to proper position  its effect on the flux reduction account to few % 2.Review of the XYMG analysis as performed in 2009 and beginning of Status of the analysis routines 4. Good agreement with simulated beam profile 1.Indications on the misalignment of the 2 nd collimator 2.Predictions have been verified experimentally  could be used for alignment purposes

23 September 2010M. Calviani - n_TOF Analysis Meeting CERN17 End

23 September 2010M. Calviani - n_TOF Analysis Meeting CERN18 Evident misalignment of the 2 nd collimator upstream bellow ~ 1 cm (?) Upstream bellow Dowstream bellow Upstream bellow Results after the optimizations April 2009 November 2009  also April 2010

23 September 2010M. Calviani - n_TOF Analysis Meeting CERN19 Only 96 strips are read over a total of 106 (effect on beam position)