XBOX-2 Signals Ben Woolley. Signals minus Vacuum.

Slides:



Advertisements
Similar presentations
TIS Climate Control Course 20 Minutes Test 10 Minutes TIS Training Program 2012, Rev 1.1
Advertisements

JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
BCAL Interlock System US BCAL Chiller US BCAL MPOD 1 US BCAL PLC Pulsed Output from Flow meter to PLC From US BCAL cooling loop US BCAL MPOD 1 RS485 from.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
HYDRAULIC SYSTEMS and APPLY DEVICES
The Tracker Dry Gas system was initially designed as a standalone unit meant to be operated through manual and pneumatically driven valves. The selection.
Fischertechnik ® Interface Connections. The Serial Interface Connects the Computer with the fischertechnik ® model
What is a Computer Network? Two or more computers which are connected together.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Update on TERA C-band high gradient test A.D
Scale Power Measurement Pengcheng Jia Nov 21, 2002.
1 isr Institute for Sustainable Resources CRICOS No J Automated Greenhouse Gas Measurement System.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
30 GHz waveguide line modification towards 12 GHz.
Experts in Chem-Feed and Water Treatment An Overview of Possibilities Dulcometer Disinfection Controller ( DDC )
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Xbox-3 LLRF Ben Woolley Stephane Rey & Heiko Damerau.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Measurement and Control. Control Systems A control system usually consists of a processor, a control program, interfaces and a device under the processor's.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Welcome to Product Workshop 2008!. The Indication Group Panel Meters Large Displays Sensors Temperature Controllers Signal Conditioners.
Experts in Chem-Feed and Water Treatment beta Metering Pumps 1.
NET 433 OPTICAL NETWORK Lab 3 Networks and Communication Department 1.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Lynxmotion Robotic Arm
EUCARD WP12 DESY 2015 Slide 1 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
CLIC Spain collaboration CIEMAT: AC structures and Dipoles magnetsCIEMAT: AC structures and Dipoles magnets CELLS - ALBA: Stripline kickers, Impedance.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
High Power RF Measurements Ben Woolley, Amos Dexter, Igor Syratchev. Jan Kovermann, Joseph Tagg HG2013, Trieste June 2013.
Calorimetric Power Measurements in Xbox-1 Xiaowei Wu.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
NSG 4070 Signal generator and immunity test system Dr. Heinrich
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Solid State Amplifier Development at PSI
FLoor Heating Controller
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
Stéphane Rey* - BE/RF Luca Timeo - BE/RF Ben Woolley - BE/RF
FLoor Heating Controller
An X-band system for phase space linearisation on CLARA
RF interlocks for higher intensities (LMC 15 June)
Ben Woolley CLIC Workshop 2016 (LCWS16) CERN, Switzerland 18/01/2016
The situation is far better than I had thought.
352MHz Klystron Control for the 3MeV Linac test stand
12 GHz High Power RF components requirements for CEA activities
RF cables calibration Matteo Volpi Thomas Geoffry Lucas
Notes on Machine Protection for long bunch trains
BEPCII RF POWER SOURCE AND INPUT COUPLER
Agilent IC-CAP Modeling Configuration - CV Measurement Block Diagram
UITF MPS system requirements
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
November technical stop activities:
CECOM LAR Operation Course
KAGRA PLC System Overview
The spoke CM tests at FREIA
UITF Conduct of Operations Review
Cryomodule Test Schedule
Presentation transcript:

XBOX-2 Signals Ben Woolley

Signals minus Vacuum

D ir. C o u p l e r Klystron Dir. Coupler NEG+ Gauge RF Valve Pulse Compressor Acc. Structure Load Splitter Dir. Coupler RF Valve Dir. Coupler Load NEG NEG+ Gauge NEG+ Gauge NEG+ Gauge NEG+ Gauge Splitter Dir. Coupler NEG+ Gauge 7 NEG Pumps (NEXTorr Controllers) 6 Vacuum Gauges (Gamma Vacuum Controllers) Interlock Procedure: NEG/NEXTorr: Has a relay output that will switch if there is an error/high vacuum level >10 -5 mbar. We can connect all in series into one interlock port of the PXI. Vacuum Gauge/Gamma Vacuum: Also has relay output so we will repeat the same method into a second interlock port of PXI. BUT we will also read the vacuum level using a serial connection for interlock level >10 -7 mbar. Vacuum

Connections Klystron to PXI – 2x BNC (Trigger and Modulator enable) TWT to PXI – 1x BNC for trigger – 1x Good RF cable for RF input Vacuum Rack to PXI – 2x BNC for relay interlocks (NEXTorr and Gamma Vacuum) – 1x Serial Connection for Gamma Vacuum. (Only need one cable can connect the controllers together.) – 3x RF Vacuum valves open/close status/control?? RTD (Temperature) Probes to rack with JUMO controllers (can go either in vacuum rack or PXI rack). – 7x 4-wire RTD cables. We only have enough controllers (2 channels each) for 6 channels so we should buy another. JUMO controllers to PXI – 1x Serial Connection (only need one cable can connect the controllers together.) – 1x BNC for interlock Water regulators to PXI – 4x Serial connection for EACH cooler (PC x2, structure/load) RF signals to Log detector and/or mixing crate-Probably still some discussion do here in terms of which channels to use but we have so far.. – 7x Good RF cables for: PKR, PKI, PSR, PSI, PEI0, PER1, PER2. (Red indicates VIP channel in terms of good calibration) NOTE: some channels are doubled up on log detectors and 400MHz mix down, will need to split at the rack. USB Power Meters attached directly to the couplers for always on calibration: for connection to computer. – 4x IN KLY, PKI, PLI, PLR. All other channels can be inferred by assuming static losses in the high level waveguide network. – Possible issue with radiation/discharge damage?? Faraday Cups to PXI Rack: – 2x BNC Optional flow and temperature monitors/controllers on the pulse compressor and structure for calorimetric readings? – 6x SMC flow switches with built in temp sensors to the PXI. –