EGEE-III INFSO-RI-222667 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks ROC FR - On the way to the EGI/NGI structure.

Slides:



Advertisements
Similar presentations
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
Advertisements

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD June 2009 COD-20 Hélène Cordier COD-20, CNRS-IN2P3, CSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE AP ROC Min-Hong Tsai ASGC SA1 Transition Meeting May 8 th, 2008
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks PoW for the second year Transition to EGI.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
The EGI Blueprint: Grid Operations and Security Migration to the next grid operations era Tiziana Ferrari (Istituto Nazionale di Fisica Nucleare)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ?? Athens, May 5-6th 2009 Community Support.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Kelsey RAL/STFC,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks France Grilles The French NGI R. Rumler,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD June 2009 COD-20 Parallel sessions Hélène Cordier COD-20, CNRS-IN2P3,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE’09 SSC Workshop SAFE Project Proposal.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Proposal Draft Summary of activity.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Fergusson, Emidio Giorgio, Gergely.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Business SSC for EGI SSC Workshop: Preparing.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Gergely Sipos Activity Deputy Manager MTA.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC Security Contacts R. Rumler Lyon/Villeurbanne.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Xavier Jeannin (CNRS/UREC Paris, FR) 24.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks South-West Federation Gabriel Amorós (CSIC)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 02.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 28.
WLCG Laura Perini1 EGI Operation Scenarios Introduction to panel discussion.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Antonio Gómez Asociación Euratom/CIEMAT.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Resource Allocation in EGEEIII Overview &
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks User Support for Distributed Computing Infrastructures.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks COD-17
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks UK-Ireland-France Regional Participation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Ian Bird All Activity Meeting, Sofia
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1 & SA2-ENOC Interactions status and plans.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Pole 2 : Restructuration of the OPS Manual.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
Setting up NGI operations Ron Trompert EGI-InSPIRE – ROD teams workshop1.
INFSO-RI Enabling Grids for E-sciencE Resource allocation and negotiation update C. Vistoli, R. Rumler Operations workshop Bologna.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations automation team presentazione.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks GOCDB4 Gilles Mathieu, RAL-STFC, UK An introduction.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IT ROC: Vision for EGEE III Tiziana Ferrari.
Ian Bird LCG Project Leader Summary of EGI workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE NA4 SSC Workshop A&A SSC Proposal C.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Application Porting Support SSC and proposal Gergely Sipos
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Training in EGEE-III and beyond Robin McConnell,
Bob Jones EGEE Technical Director
Ian Bird GDB Meeting CERN 9 September 2003
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
NGI Operations readiness report
Networking support (SA2) tasks for EGI
The CCIN2P3 and its role in EGEE/LCG
Presentation transcript:

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC FR - On the way to the EGI/NGI structure R. Rumler, CNRS/IN2P3 SA1 Coordination Meeting Catania,

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 2/14 Contents Current situation after DataGrid and 5 years of EGEE –French NGI, initial structure –Staffing and Equipment –Considerations on Non production grids Production Grid Plans –Organisational considerations –Staffing and Resources –Tools –Future of currently assumed project wide functions –Consequences for EGEE –Some answers to Maite’s questions Conclusion, concerns, issues

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 3/14 French NGI, initial structure The “Institut des Grilles” (IdG) of CNRS as a basis of the French NGI –French Production Grid recognised by French government as of same importance as the French tier-1 and the IDRIS (“TGIR”) –NGI Steering committee composed of Research Ministry and seven research organisms and all universities, namely CNRS, CEA, INRA, INRIA, INSERM, CPU, RENATER IDG –Head: Guy Wormser, assisted by directors for research grids, Mrs. Donzeau- Gouge, and for production grids, Mr. Dominique Boutigny. –A “virtual” institute: no headquarters, no dedicated buildings –Authority for French international grid relations, especially for EU projects –Combines CNRS work on production and research grids, as well as research on grids IDG was charged by the Ministry to conduct in 2008 a national prospective exercise on the usefulness of grids in all scientific domains –Working groups by  Scientific domain (8)  “Transversal activity” (6) –A “White report” is now available (in French)

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 4/14 French NGI, Staffing + Equipment Currently, one (1!) temporary position for administration People from participating laboratories who work already in the grid area also contribute to IdG Significant progress expected soon, see next slides No own equipment –Seed money provided to launch new grid nodes However, there’s a budget which is distributed to participating laboratories in order to promote the grid work –Training –Dissemination –National and international work for grids, not covered elsewhere

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 5/14 Non production grids Large and small experimental and research grids exists –Own middlewares –Different security contexts –Own resource managements –Various funding bodies The IdG is meant to provide a bridge from production grids to the non production ones

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 6/14 Contents Current situation after DataGrid and 5 years of EGEE –French NGI, initial structure –Staffing and Equipment –Considerations on Non production grids Production Grid Plans –Organisational considerations –Staffing and Resources –Tools –Future of currently assumed project wide functions –Consequences for EGEE –Some answers to Maite’s questions Conclusion, concerns, issues

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 7/14 Organisational considerations “Regional” grids exist or are coming up for several geographical areas in France Some sites aren’t part of such grids The current model is to base the operational infrastructure on this: –“Regional” grid with contact points for operations, security, training, management –“Isolated” sites have to provide this, too –Operations tools and NGI operational procedures should take this into account The gNOC will be distributed, with the majority of the staff at the LCG tier-1 at Lyon

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 8/14 Staffing and Resources The IdG has been invited by the Ministry to present hiring and investment plans 19 permanent positions requested –All activities, not only Operations –Hiring in 2009 and 2010 –Subject to public hiring rules, i. e. open for everybody –Grid expertise requested corresponds to those of people currently in EGEE at various sites in France Budget of 18.5 M€ requested –Distributed over the next 5 years –Mainly for the creation of mid size centres –Objective is to attract currently “white spots” in grid terms Decision on these plans expected before summer 2009

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 9/14 Tools Currently available tools are supposed to continue to be so after the end of EGEE-III –Changes are possible as long as they don’t require important increase in manpower and paperwork, and no significant changes in procedures beyond those already foreseen for “regionalisation”. gNOC is responsible for production quality, consequently: –Tools must allow for gNOC’s control over the acceptance of participating sites resources –Tools must allow for gNOC’s control over which sites participate in EGI activities and which ones stay national gNOC is responsible for security coordination –Tools must allow for this. This point is important also for acceptance by government.

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 10/14 Future of project wide functions, 1 The French ROC continues working until EGI/NGI is in place This includes the project wide functions currently assumed –COD coordination –CIC portal maintenance and development  Is also an NGI task –CIC portal hosting of central instance –Oversight of VO creation requests (RAG activity) –EGI Network Support Center (ENSC) hosting. Functions:  Independent assessment of network quality  Ensure the end-to-end connectivity is achieved  Establish the link between network operations and grid operations  Run, maintain and implement network operational tools for the EGI  Incident and change management processes Tasks will be supported as long as necessary during the transition; beyond if required and attributed by EGI, or at least the continued support will be considered NGI tasks will be supported in any case

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 11/14 Future of project wide functions, 2 The NGI operation will be based on: –An asymmetric rotation of r-COD responsibilities  Tier-1 and some tier-2s –A regional view or regional instance of the CIC portal  Consequently, the French NGI will continue to do necessary developments and maintenance –A regional view or regional instance of the GOCDB  Depends on the needs of the NGI and of the functions of the GOCDB implemented at the end of EGEE-III

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 12/14 Consequences for EGEE According to the DoW, ROC France is currently overcommitting by more than 50 percent. The NGI activities become more and more important EGEE staff with temporary contracts starts to look for other employment opportunities Consequently, ROC France will decrease its implication in EGEE activities –But increase its activities in the NGI area Any changes which need additional staffing cannot be assumed

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 13/14 Maite’s questions User support in place, in terms of people and tools Security –In progress: regional workshop on security model on NGI level for various participating organisations in preparation for April –Staffing still uncertain for some persons (but see plans of IdG) r-COD planned around April, starting up with current regular CODs Other tools etc –Doubts on the use of a SLA portal (more info might help) –What might be missing: will CESGA accounting portal still be there? What about the equivalent of the SA1 coordination meetings? What about the liaison to Applications?

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, SA1 Coordination Meeting Catania 14/14 Conclusion, concerns, issues I’m optimistic about the switch to the French NGI structure It is not clear though to which extent it will be possible to have a common operational infrastructure for the LHC VOs and the other ones The situation for the persons with temporary contracts is still uncertain, even if there’s some hope to be able to propose permanent ones to all of them OAT should explain more clearly what (part of a given) tool will stay, how much additional work will be needed by introducing what item of its work plan, and why a change is worth the effort In the doubt or if in lack of manpower, we will stick to the current tools as much as possible More important than the tools themselves is a CLEAR and STABLE definition of interfaces and data exchanged