FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
C/S-band cavity BPMs A. Aryshev (KEK), S. T. Boogert G. Boorman, F. Cullinan, J. Frisch, A. Heo, Y. Honda, J.Y. Huang, S.J. Hwang, N. Joshi,
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
ATF2 Instrumentation Stewart T. Boogert
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
FONT stripline BPM resolution
Presentation transcript:

FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015

FONT GROUP MEETING June Shifts 9/6 Tues Swing 10/6 Wed Swing (IPBSM) 12/6 Fri Day 16/6 Tues Swing 18/6 Thur Owl (Siwon’s shift) 18/6 Thur Day (IPBSM) 19/6 Fri Day Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING 9/6 Tues Swing Tightened and checked all connections on 1 st and 2 nd stage. Note: no longer a 150 MHz BPF or amplifier before reference enters the limiter – this explains why no longer need for delay cables. Checked dipole/ref phase with and without 714 MHz BPF on 2 nd stage – needs 2m delay cable without BPF. Movers not working - re-launched IP BPM mover system. Bug in ATF IPBPM data-saving code – fixed later in week by ATF engineers. Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING 10/6 Wed Swing (IPBSM) Set up upstream feedback in 2-bunch mode using P1, P2 and P3 and FONT5 board #1. Unable to kick beam – problem isolated to ZPULs. Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING 12/6 Friday Day High-beta (100x1000) optics. Charge 0.7 x BPM resolution studies without 714 MHz BPF in X and Y. 3 BPM resolution studies with 714 MHz BPF in X and Y. Discontinuities in mover calibrations – particularly in IPC - saturating? – need to analyze further to see if this data can be useful. Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING 3BPM resolution – no BPF Talitha Bromwich - Friday, 26 June 2015 High-beta (100x1000) optics. Charge 0.7 x Integration 55 to 62 3BPM resolution – 714 MHz BPF High-beta (100x1000) optics. Charge 0.7 x Integration 55 to 62 6

FONT GROUP MEETING 12/6 Tues Swing Nominal optics Charge 0.3 x Re-calibrate IPC with 714 MHz BPF in X and Y – linear behaviour observed at lower charge. Install C-band BPFs on between hybrid and variable attenuator inside tunnel on dipole and reference cavities. Reference not limited properly. Remove C-band BPFs from references. Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING C-band BPF on the reference Talitha Bromwich - Friday, 26 June 2015 Not limited properly. BPFs subsequently removed from the reference. 8

FONT GROUP MEETING 18/6 Thurs Owl (Siwon’s Shift) Nominal optics. Charge 0.5 x Calibration matching in X and Y. Talitha Bromwich - Friday, 26 June /6 Thurs Day (IPBSM) Set up upstream feedback in 2-bunch mode using P1, P2 and P3 and FONT5 board #1. ZPULs replaced with ATF pre-amplifier. Poor bunch-to-bunch position correlation. 9

FONT GROUP MEETING 19/6 Fri Day High-beta (100x1000) optics. Charge 0.3 x and 0.6 x BPM resolution studies with C-band BPF in X and Y at different attenuations. Talitha Bromwich - Friday, 26 June

FONT GROUP MEETING No BPF – 2m delay cables Talitha Bromwich - Friday, 26 June 2015 Signals out of 2 nd stage going into detector. IPC(X) Ref(X) 11

FONT GROUP MEETING 714 MHz BPF on 2 nd stage Talitha Bromwich - Friday, 26 June 2015 Signals out of 2 nd stage going into detector. IPC(X) Ref(X) 12

FONT GROUP MEETING C-band BPF before 1 st stage Talitha Bromwich - Friday, 26 June 2015 Signals out of 2 nd stage going into detector. IPC(X) Ref(X) 13

FONT GROUP MEETING IPA(Y) Talitha Bromwich - Friday, 26 June 2015 No BPF 0dB 0.7 x MHz BPF on 2 nd stage 0dB 0.7 x C-band filter before 1 st stage 0dB 0.3 x

FONT GROUP MEETING Jitter vs Attenuation IPA(Y) Talitha Bromwich - Friday, 26 June 2015 C-band BPF before 1 st stage 0.3 x

FONT GROUP MEETING Jitter vs Attenuation IPB(Y) Talitha Bromwich - Friday, 26 June 2015 C-band BPF before 1 st stage 0.3 x

FONT GROUP MEETING Jitter vs Attenuation IPC(Y) Talitha Bromwich - Friday, 26 June 2015 C-band BPF before 1 st stage 0.3 x

FONT GROUP MEETING Resolution vs Attenuation in Y Talitha Bromwich - Friday, 26 June 2015 Results for 0dB C-band BPF before 1 st stage 0.3 x