LS1 SSD PLANS 1.Cooling always on 2.SDD/SSD Cooling plant under UPS 3.Counter flow cleaning 4.Removing Teflon 5.Check safety valves 4 Sept 2012ITS Cooling.

Slides:



Advertisements
Similar presentations
Singapore Polytechnic Singapore Maritime Academy & Maritime Institute Of William Barentsz Bachelor Degree in Maritime Operations (BMO) Diesel Technology.
Advertisements

An Introduction to what they are, how they work, and their parts
Mountings & Accessories
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
HVAC523 Soldering.
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Presented By. HIGHLY SUGGESTED ITEMS  Condescent Dryer  Chiller  An additional in-line filter  Coalescing Filter  Any and all of these items will.
Hydraulics.
Introduction To Programmable Logic Controllers
Dennis Sabre Fire Appliances
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
Reservoir LVAD PVS / Booster Physiological Simulator Valve Automated Resistance Valve Three Loops Blood Extraction Standard Pressure Sensor Temperature.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Verbal Modeling Anchors: Manganese  Matt Morabito Jamie Polan.
PRESSURE MEASUREMENT INSTRUMENTS © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
© Swagelok Company, 2004 Modular Platform Components (MPC) Overview John Wawrowski Swagelok Company Solon, Ohio NeSSI Workshop May 6, 2004.
P H S A U T O M I V E ALS Lubrication.
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
How to make “Touch Free” washing clean better. RYKO Manufacturing Company.
Settings & Adjustments. Settings & Adjustments.
Processing, distribution and use of water.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Multiplexer Troubleshooting February Instrument recognition problems Air/water pressure related problems Compatibility problems Dripping instruments.
SSD Status Before and After Dessica Installation Massimo Venaruzzo 04/10/2012 SSD – EN/CV Meeting.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Raw Water System Flush By introducing fresh water into the cooling system, growth of sea life is reduced or eliminated keeping the raw water cooling pipes.
Aquarium Set-Up 20 gallon Penguin Biowheel. Safety First Electrocution is real; use drip loops Wet floors are slippery- always walk with caution Place.
Wednesday, Jan. 23 rd : “A” Day Thursday, Jan. 24 th : “B” Day Agenda  Check Lab Write-Ups  Lab Discussion: “Charles’ Law: The Effect of Temperature.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
By: Jim Kibby Fouling and ROI Tools (Return On Investment)
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Welcome Growers Discover the Dosmatic Difference Installing your Dosmatic injector for years of service.
Today… Functions, Cont.: –Designing functions. –Functional Decomposition –Importing our own module –A demo: Functional solution to assignment 2. Winter.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
GPAEE New Technologies Blitz 960 Brook Road, Unit 3, Conshohocken, PA * Phone: (610) * Fax: (610) * Feb 18, 2016.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
TS2 preparatory meeting
Rosario Turrisi INFN Padova
INDUSTRIAL HYDRAULICS
Tracker cooling loop “check out” draft for discussion
ITS Cooling: Xmas Plan Claudio Bortolin.
Preparation of the activities for the LHC Long Shutdown 2
An Introduction to what they are, how they work, and their parts
Pixel Cooling System Modifications
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
By: JAGDEEP SANGWAN Refrigeration Basics 101.
November technical stop activities:
Lesson 12: more on Equations
Instructions: Adding refrigerant fluid to system
AIR COMPRESOR Chapter-13.
Presentation transcript:

LS1 SSD PLANS 1.Cooling always on 2.SDD/SSD Cooling plant under UPS 3.Counter flow cleaning 4.Removing Teflon 5.Check safety valves 4 Sept 2012ITS Cooling meetingAvdBrink1

COOLING ALWAYS ON To avoid problems such as algae formation, acidification of water and dried dirt after a long stop the system must running al the time. Short stops must be minimized. 4 Sept 2012ITS Cooling meetingAvdBrink2

SDD/SSD COOLING PLANT UNDER UPS Why: To avoid any kind of flow problems. Especially after a stop of more then a few hours several ladders get more and more flow problems. What: All the parts to get a controlled flow Remark: To reduce the needed power the SSD heaters will be removed. This also simplifies the PLC program significant 4 Sept 2012ITS Cooling meetingAvdBrink3

COUNTER FLOW CLEANING Why: The resistance of the loops are increasing by 10% 4 Sept 2012ITS Cooling meetingAvdBrink4

COUNTER FLOW CLEANING A-side: swap red and blue tube together with pressure sensors 4 Sept 2012ITS Cooling meetingAvdBrink5 C-side: swap transparent and blue tube

TELFON EN Division-Materials and Metrology CERN/EN/MME-MM/NJ-EDMS Sept 2012ITS Cooling meetingAvdBrink6 During the examination of the Teflon filter disturbing large particles are found. This problem can be solved by removing all the Teflon in the system!

CHECK SAFETY VALVES AND REMOVING TEFLON ? 4 Sept 2012ITS Cooling meetingAvdBrink7 Supply side 64 fittings with Teflon Return side 64 fittings with Teflon 32 safety valves Supply regulator 4 fittings with Teflon