PRR 568 – Settlement Timeline September 2005 16-day Analysis COPS October 25, 2005.

Slides:



Advertisements
Similar presentations
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Advertisements

Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
ERCOT Billing, Settlement Disputes & Data Extracts
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
Next Steps to Reduce the RTM Settlement Timeline August 29, 2013 COPS Workshop Update to TAC Harika Basaran COPS Chair September 5, 2013.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 MIMO/Stacking (Including Tx SET Version 2.0) Post Implementation Success Report.
1 Market Data Transparency SCR 740 Business Training SCR 727 Phase II: Web Services ERCOT presents:
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
ERCOT MARKET EDUCATION
Board of Directors Credit Aspects of Mass Transition.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
April 15, 2003 UFE 2002 ANALYSIS. April 15, 2003 LOAD AND UFE – ERCOT PEAK 2002 This is a graphic depiction of load and UFE on the ERCOT Peak Day for.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Overview of MID, MIR, & Extracts for DEWG 9/24/07 Steve Cox.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 UFE Workshop Sponsored by COPS October 19, 2004.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
MARS Advanced Metering – ERCOT Market Facing Changes Jackie Ashbaugh Manager Data Integrity and Administration 3/9/2009.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
Distributed Renewable Generation Profile Implementation Plan.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
ERCOT MARKET EDUCATION Retail 101. Advanced Meter Technology.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
3 rd Party Registration & Account Management SMT Update To AMWG DEC 2015.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013.
PRR 568 – Day 17 to Day 10 Analysis Implementation Recommendation TAC December 2005.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Proposed Timeline for Extract, Variances, True-Ups Extracts 10/1/03 Clear all “old” extracts from Portal 9/26/03 Post last “old” daily extract 10/6/03.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
PR30026 Resource ID (RID) Extract and Recorder Extract Data Extracts Working Group May 18, 2006 Laura Zotter ERCOT Market Operations D P O.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
1 A Review of Impacts to UFE and Load Ratio Share Based on AV Profile ID Changes Presented by ERCOT Staff to the Profiling Working Group 10/26/2005.
Credit Working Group Background Information Credit Aspects of Mass Transition Update – February 3, 2006.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
Thoughts on DER Aggregations ERCOT Staff DREAM TF Sept. 28, DER Aggregations.
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
MARS Taskforce RMS Update December 9, 2009.
Presentation transcript:

PRR 568 – Settlement Timeline September day Analysis COPS October 25, 2005

2 Review of Analysis  Data Loading/Availability  IDR  NIDR  Aggregation Results  Generation Changes  Load Changes —QSE —LSE  UFE

3 Data Loading/Availability

4 IDR Data Loading Statistics  Daily IDR data availability is graphed and posted weekly

5 IDR Data Loading Statistics  Two representations of data loading are provided: 30-day view 8 day vs 15 day comparison

6 % of IDR Data Loaded by MRE (as of )

7 IDR Data Loaded for Day 8 and 15 Trade Date:

8 NOIE vs Competitive IDR Data Availability

9 What Caused the 8-day NOIE IDR Change  NOIE’s have the same meter data submission requirements as Competitive TDSP’s – “on a monthly basis”  Some NOIE’s choose to submit their data on a more frequent basis  There are 119 NOIE’s but only 8 NOIE Meter Reading Entities (MRE’s)  The percentage of data submitted by each NOIE MRE is approximately NOIE MRE A – 40% NOIE MRE B – 36% NOIE MRE C – 12% NOIE MRE D – 10% NOIE MRE E – 2% NOIE MRE F, G & H – <1%  Due to these percentages, the submission of data from one NOIE MRE can significantly change the percentage of data available for settlements.

10 Non-IDR Data Availability

11 Aggregation Results

12 Generation Differences

13 Average Load Differences for QSEs Day 8 vs Day 15

14 QSE’s Grouped by Percent Change

15 Average Percent Load Change by QSE Size

16 Individual QSE Extremes by Day

17 Individual QSE Extremes by Day

18 Average Load Differences for LSEs Day 8 vs Day 15

19 LSE’s Grouped by Percent Change

20 Average Percent Load Change by LSE Size

21 Individual LSE Extremes by Day One NOIE LSE was excluded from this graph due to it having one ESIID that skewed the graphs beyond readability (small usage, approximately 8000 % change)

22 Individual LSE Extremes by Day One NOIE LSE was excluded from this graph due to it having one ESIID that skewed the graphs beyond readability (small usage, approximately 8000 % change)

23 % UFE Comparison September 15 through September 30

24 % UFE Change (Day 8 minus Day 15)

25 Questions