R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)

Slides:



Advertisements
Similar presentations
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Advertisements

CABLE TRAY LSS1 – VISIT MARCH 24 TH WITH Y. MUTTONI & G. CANALE Dorothea Pfeiffer LTEX Meeting
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
The performance of LHCf calorimeter was tested at CERN SPS in For electron of GeV, the energy resolution is < 5% and the position resolution.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
Detectors installation in the TAN at IR1 and IR5: status and planning A. L. Perrot (TS/LEA-Int) Joint LHC Machine Experiments Workshop on very forward.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
My working experience Marco Villa Tue, 2 nd Dec 2008.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Technical Support Activities in PH-ADO-PO
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Dose Measurements S. Roesler (DGS-RP) Collimation WG – IR3 passive absorbers 4 June 2012.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Radioactive Magnet Facility B /09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
V. Bobillier1 Cable installation status.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1 LHCf RE - INSTALLATION – TS4 Operation Time (min) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) -2 Bring downstairs the.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
The Panorama of the Future Radioactive Areas from now to 2020 S. Roesler on behalf of DGS-RP Workshop on remote manipulations and diagnostics in radioactive.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Installation of the T600 at Fermilab
Plans for this week MWPC: wire stretching today
Upgrade activities at Clermont-Ferrand
S. Roesler (on behalf of DGS-RP)
General aspects: Optical links :
HF Test station at P5 A.Mestvirishvili.
A.-L. Perrot, TS/LEA-int LEMIC A.L. Perrot – TS/LEA/int LEMIC
IFR detector mechanics
LHCf – CSN1 Trieste O. Adriani
C. Adorisio Extracted from the presentation given at
Presentation transcript:

R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)

O UTLINE Residual dose rate measurements Last TS (June 25 th, 2012) Evolution of activation Prediction for Xmas technical stop and LS1 Work-Dose Plan LHCf reinstallation during Xmas technical stop ATLAS ZDC reinstallation during Xmas technical stop AFP installation region estimation TCL5 collimator activation Conclusions 2 LTEX Meeting, September 13 th

TAN- LSS1L SIDE 1 (côté tunnel):10µSv/h SIDE 3 : 38µSv/h SIDE 2 : 16µSv/h TOP 1 : 27µSV/h TOP 2 : 5µSv/h TOP 3 :10µSv/h TOP 4 : 12µSV/h TOP 6 : 16 µSV/h TOP 7 : 44µSv/h SIDE 3 : 39 µSv/h SIDE 1 9µSV/h TOP 5 : 12µSv/h Thanks to: A. Herve (CERN DGS/RP)

TAN- LSS1R TOP 6 15µSv/h TOP 5 10µSv/h TOP 4 12µSv/h TOP 2 : 9µSv/h SIDE 3 : 35 µSv/h SIDE 1 : 11 µSv/h TOP 1 : 77µSv/h (*) TOP 3 : 8µSv/h SIDE 2 : 16µSv/h (*) TOP 7 27µSv/h Thanks to: A. Herve (CERN DGS/RP)

SIDE 1: 13µSv/h SIDE 3: 54µSv/h SIDE 2: 14µSv/h TOP 1: 63µSv/h TOP 2: 18µSv/h TOP 4: 24µSv/h TOP 7: 50µSv/h TOP 3: 28µSv/h TOP 5: 20µSv/h TOP 6: 26µSv/h TAN- LSS5L Thanks to: A. Herve (CERN DGS/RP)

TOP 7: 50µSv/h TOP 6: 30µSv/h TOP 5: 30µSv/h TOP 4: 22µSv/h TOP 2: 19µSv/h SIDE 3: 95µSv/h SIDE 1: 13µSv/h SIDE 2 (*): 16µSv/h TOP 1: 48µSv/h (*) TOP 3: 22µSv/h TAN- LSS5R Thanks to: A. Herve (CERN DGS/RP)

7 LTEX Meeting, September 13 th TS#2 S URVEY MEASUREMENTS S UMMARY Residual dose rate on contact (  Sv/h)

8 LTEX Meeting, September 13 th E VOLUTION OF ACTIVATION The measurements could be used to estimate the residual dose rate during the TS in 2012 and the LS1 Referring to June 2012 detailed measurements done on TANs, the scaling factors is: 1.35 for Xmas TS 2012 → essentially driven by the peak luminosity Referring to Feb detailed measurements done on TANs and on the detectors, the scaling factors is: 3 for LS1 → essentially driven by the integrated luminosity measurementsextrapolations

9 LHCf RE - INSTALLATION – X MAS TS Operation Time (min) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) -2 Bring downstairs the detectors and the tooling needed for the installation 10 2 physicists from LHCf PM15-> UL16 00 Bring downstairs electrical cupboard, camera and desktop 20 2 operators from EN/HE PM15-> UL Radiation Survey 15 1 technician DGS/RP UJ16/TAN 13 1 Prepare/check mini- cranes for operation 45 2 operators from EN/HE TAN and between TAN and UJ Bring the shielding box 10 2 operators from EN/HE Bunker in UJ17 ->TAN 00 3 Bring the detector to the TAN 5 2 physicists from LHCf UJ17 -> TAN 00 4 Remove Cu bar and place it in the appropriate shielding box 10 2 operators from EN/HE UJ16 Behind the shielding wall 00 5 Install detector 10 2 operators from EN/HE UJ16 Behind the shielding wall 00 6 Remove bar shielding box 10 2 operators from EN/HE TAN-> bunker in UJ Remove electrical cupboard and cameras from TAN 5 2 operators from EN/HE TAN Bring upstairs electrical cupboard, camera and desktop 20 2 operators from EN/HE UJ16 -> PM15 00 LTEX Meeting, September 13 th week cooling time

10 LHCf RE - INSTALLATION – X MAS TS Operation Time (min) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) 9 Screwing (no fine positioning) 15 2 physicists from LHCf On top of the TAN Installation of the Front Counter 10 2 physicists from LHCf On top of the TAN and behind it on the footbridge Cabling for preamp and FC 5 2 physicists from LHCf On top of the TAN and behind it on the footbridge Additional cabling for the electronics box 10 2 physicists from LHCf On top and side of the TAN Survey 4 h 2 technicians from BE/ABP Around the TAN region Electronics commissioning (8 h) 60 2 physicists from LHCf This test is performed from USA15. In case of problems 2 physicists from LHCf will have to work on top of the TAN for a period which depends on the kind of problem (typically min) Mechanical commissioning (manipulator) ( 8 h ) 30 2 physicists from LHCf Test performed mainly from USA15. One physicist is required to stay on top of the TAN for 30 minutes maximum Bring back detector shielding boxes 10 1 physicists from LHCf TAN->PM Exit the zone 10 2 physicists from LHCf TAN->PM15 00 LTEX Meeting, September 13 th week cooling time

11 LHCf RE - INSTALLATION – X MAS TS Concerned Person Individual Dose (  Sv) 1 st LHCf physicist158 2 nd LHCf physicist98 3 rd LHCf physicist150 DGS/RP technician13 1 st operator from EN/HE11 2 nd operator from EN/HE11 1 st operator from BE/ABP62 2 nd operator from BE/ABP62 Collective Dose 565  Sv Summarizing (1 week cooling time): The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). The individual dose for two of the LHCf physicists falls into the ALARA level II. Collective dose falls into ALARA level II. LTEX Meeting, September 13 th week cooling time

12 LTEX Meeting, September 13 th E VOLUTION OF ACTIVATION No MD before the Xmas TS No MD also before TS#3 → relook at the estimations after the next TS measurementsextrapolations

13 LHCf RE - INSTALLATION – X MAS TS Concerned Person Individual Dose (  Sv) 1 st LHCf physicist269 2 nd LHCf physicist165 3 rd LHCf physicist254 DGS/RP technician23 1 st operator from EN/HE17 2 nd operator from EN/HE17 1 st operator from BE/ABP105 2 nd operator from BE/ABP105 Collective Dose 955  Sv Summarizing (1 DAY cooling time): The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). The individual dose for the LHCf physicists falls into the ALARA level II. Collective dose falls into ALARA level II. LTEX Meeting, September 13 th DAY cooling time

14 ATLAS ZDC RE - INSTALLATION – X MAS TS Operation Time (minutes) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) 0 Radiation Survey 15 1 technician DGS/RP UJ16/TAN side 13 1 Remove H3 PMT 5 1 physicist from ATLAS ZDC TAN passarelle 99 2 Remove the remote hadling bars and cover H1-pixel 15 1 physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side 13 3 Mount PMT H1, H2, H3, EM and light tightening of PMT 30 1 physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side 27 4 Prepare and connect HV and signal cables for EM, H1, H2, H physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side 90 5 Mount H1-pixel front end electronics and connect signals and HV cables 15 1 physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side If needed remount LED calibration system for HAD1 pixel 15 1 physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side 13 7 Preparation laser optical fiber, connect optical splitter and connect it to the 4 PMT 15 1 physicist from ATLAS ZDC TAN passarelle physicist from ATLAS ZDC TAN side 13 8 Prepare cables to connect to the NIM crate 10 2 physicists from ATLAS ZDC TAN side (bottom) Connect the NIM crate and all modules inside to the cables 30 2 physicists from ATLAS ZDC TAN side (bottom) Commissioning (8h) physicists from ATLAS ZDC Around the TAN if needed 36 LTEX Meeting, September 13 th week cooling time

15 ATLAS ZDC RE - INSTALLATION – X MAS TS Concerned Person Individual Dose (  Sv) 1 st ATLAS ZDC physicist223 2 nd ATLAS ZDC physicist127 DGS/RP technician13 Collective Dose 363  Sv Summarizing (1 week cooling time): The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). The individual dose for the ATLAS ZDC physicists falls into the ALARA level II. Transport part is the same as for LHCf detector (they will be transported together/at the same moment). LTEX Meeting, September 13 th week cooling time

16 ATLAS ZDC RE - INSTALLATION – X MAS TS Concerned Person Individual Dose (  Sv) 1 st ATLAS ZDC physicist380 2 nd ATLAS ZDC physicist217 DGS/RP technician23 Collective Dose 620  Sv Summarizing ( 1 day cooling time): The estimated dose are done considering the maximum dose rate at the position of the worker (TAN aisle, TAN top or side on contact). The individual dose for the ATLAS ZDC physicists falls into the ALARA level II. Collective dose falls into ALARA level II. Transport part is the same as for LHCf detector (they will be transported together/at the same moment). LTEX Meeting, September 13 th DAY cooling time

TCL5 ACTIVATION 17 LTEX Meeting, September 13 th Residual dose rate on contact (  Sv/h) measurements extrapolations Extrapolation to 2015 is done considering: the energy difference (3.5TeV to 6.5TeV) a max peak luminosity of 2.2∙10 34 cm -2 s -1

C ONCLUSIONS The estimation for the Xmas TS are done considering 1 week cooling time Some estimation for shorter cooling time (1 day) considering the absence of the MD before the Xmas TS The estimation for the LS1 are done considering 3 months cooling time All the estimations will be updated/reviewed using the survey measurements which will be done during next technical stop TS#3 18 LTEX Meeting, September 13 th

T HANK Y OU FOR YOUR ATTENTION !

20 LTEX Meeting, 5 April 2012 ALARA Optimization is a legal requirement if accumulated individual dose exceeds 100 μSv/year (ALARA) Optimization includes work coordination work procedures handling tools design material required optional