Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.

Slides:



Advertisements
Similar presentations
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Advertisements

Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007.
Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Noise near peak field is increased Peak width narrow Peak is symmetric Purpose: Resonate nuclei to prevent polarization. Matching the resonant frequencies.
06 Apr 09Target Prototype Metting1 Positron Target Prototype – Hardware Status Leo Jenner (T-25)
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
SPIN 2004 Oct. 14, 2004 W. Kim, S.S. Stepanyan, S. Woo, M. Rasulbaev, S. Jin (Kyungpook National University) S. Korea Polarization Measurements of the.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
CEMTREX, INC. MODCON SYSTEMS LTD NIR Systems July 2010.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
Laser DCS meeting, Utrecht, 13 June 2005Børge Svane Nielsen, NBI1 TPC laser controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser controls.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
E-M Spectrum and Waves Prentice Hall Chapter 18.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Feasibility Check / How to test EquipmentsStatusCostDateCommentsContact Polarized 3 He atomsCell for transfer design / LKB, Paris/MainzSspm.e. optical.
Yi Qiang Duke University for the Workshop on Hadron Physics in China and Opportunities with 12 GeV JLab July 31, /31/ Neutron Transversity.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
Considerations for the Optimal Polarization of 3 He Targets Brielin C. Brown University of Virginia October 10, 2008 SPIN 2008.
Ultrahigh precision observation of nuclear spin precession and application to EDM measurement T. Inoue, T. Furukawa, H. Hayashi, M. Tsuchiya, T. Nanao,
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting December 10 th, 2012.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
Thursday Lab Projects ELCT 201 Spring 2011 Laser Light Show Water Test Stand Automation MSD Automated Demonstration.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Status of Tev IPMs September 3, 2008 Andreas Jansson.
The polarized target for G E n Gordon D. Cates, Jr. University of Virginia Professor of Physics and Radiology G E n, - October 24, 2003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Jin Huang MIT For target group discussion. May 07 EPR/Pumping Chamber Pol. Table Updates May 03 First Gradient Model Fitting May 05 Review & Update on.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
MIT-Bates Laser Driven Target Introduction Achieved and expected results Installation plan and timeline B. Clasie, C. Crawford, D. Dutta, H. Gao, J. Seely,
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
COMPASS polarized target for Drell-Yan Michael Pesek Charles University in Prague On behalf of COMPASS PT group PSPT, Charlottesville, Virginia
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
ECE477 Senior Design Android street car Team 12 Libo Dong 1.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting June 13 th, 2013 E97-110:
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
QuickBev Group 29: Phillip Nielsen & Michael Perreux TA: Braedon Salz ECE445 Spring 2016 May 4, 2016.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
Heat to air update August 9th, 2017.
Monitoring system commissioning
Radiation-safe area for electronics, or laser or
Neutron (e,e’π±) Target Single-Spin Asymmetry in Semi-inclusive DIS on a Transversely Polarized 3He Target - Kalyan Allada, Chiranjib Dutta, Mitra Shabestari,
NPS Sweep Magnet Field-Mapping
Overview of Polarized 3He Target
Yi Qiang Duke University for APS April Meeting 2009 May 4, 2009
Target Analysis for Transversity
Polarized 3He target installation
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration Meeting Friday, May 4 th 2007

Works in our target lab. Oven/Support structure Optics Software The real tests

Oven / Support structure Installed the new oven earlier Installed the new heaters and RTDs UNFORTUNATELY, the structure was BROKEN near the bottom of the air flow tube GOOD NEWS===the oven is still safe and fine The new structure is being designed Waiting on it !! (within 4-6 weeks) Many thanks to Al and Susan

Optics New 5 to 1 combiners tested Found problems in a few and sent back to the vendor New 75 meter fibers (qty=10) tested Except couple of them, all look good ! All of them to be installed in the Hall in summer The Optics line design to be worked on shortly Simulation to be done shortly before that

Software Combine the spin-flip lab view code with NMR signal analysis and EPR measurement 1. NMR frequency sweep signal can be extracted and fitted after every spin-flip. Provide quick & continuous cell polarization monitoring. 2. EPR measurement can be controlled automatically by spin-flip program during every spin-flip, also can be controlled manually without affecting the main program. 3. Add counter connected to FG to monitor the frequency sweep process which is crucial to spin-flip. The reading rate from counter by lab view can be at 3-4Hz without interrupting the main spin-flip process. Spin polarization status(+/-) can be monitored continuously by a TTL output signal of the FG together with ADC and scalar. The record of Labview can communicate with EPICS as a complementary method to check the spin status All of the software programs will be fully tested after the installation

Real Tests The oven to be tested Laser alignment NMR/EPR/SPIN FLIP to be tested All the new related softwares to be tested accordingly Water field and frequency sweep to be tried New vertical coil to be tested in the new lab BB field mapping at some point (?)

Wolfgang Korsch Jian Ping Chen Jaideep Singh Aidan Kelleher Ameya Kolarkar Wolfgang Korsch Jian Ping Chen Jaideep Singh Aidan Kelleher Ameya Kolarkar Thanks a ton :::::::