Waterfront & Boating Access Summit Marina Projects October 14, 2006.

Slides:



Advertisements
Similar presentations
Identify the key elements in the development process that help maintain a balance between the physical capacity of a beach resort and the economic needs.
Advertisements

Presentation Requirements in the Marine Mode – Private Boats.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
Mount Vernon Yacht Club Long Range Projects. Projects under consideration Replace/repair bulkhead along parking lot Dredging Replace/Upgrade of C and.
Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.
Cruz Bay Waterfront Plan
Northampton Marina Photo Gallery. Northampton Marina has 80 berths and offers residential, part-residential, permanent, winter and visitor moorings. All.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Prince William – Manassas Regional Adult Detention Center Manassas Fiscal Report December 19,
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Marina Current Situation Updated Projections for 2012 Actions Taken Scenarios Evaluated Current Conclusions Possible Future Actions Flag Meeting April.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
City of Murrieta C5 – Water Efficient Landscape Ordinance City Council.
DOUBLE BAY MARINA REDEVELOPMENT PROPOSAL D/A # 844/2007/1 Lot and DP No:Lot 13 DP Lot 1 DP
Preservation of Recreational & Commercial Working Waterfronts Provisions of Chapter , Laws of Florida (HB955, SB1316)
Driftwood Key Club Financial Presentation.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
OPERATING YOUR BOAT SAFELY OPERATING YOUR BOAT SAFELY.
Harrison Marine, Inc. ( Expertise in : All repairs Watercraft Appraising Marine Investigating Marine Value Survey Dockage with amenities:
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Mission Statement: The Michigan State Waterways Commission works to provide safe public access to the Great Lakes and inland waters of the State of Michigan.
Mission Statement: The Michigan State Waterways Commission works to provide safe public access to the Great Lakes and inland waters of the State of Michigan.
CBP Small Boat Program Border Patrol Field Operations/Port Huron.
What a Difference a Plan Makes Master Planning and Realignment of Marinas Pacific Coast Congress April 13, 2006 Julie Bassuk, AICP, partner, MAKERS Paul.
The Economic Importance of the Chicago Harbors Marinas.
Creating a Powerboat Program for All Ages. US Powerboating The Nation’s Leading Hands-on, On-the-water Training Professionals.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
SUN CITY HILTON HEAD COMMUNITY ASSOCIATION, INC. PURRYSBURG POOL UPDATE.
Chilmark Menemsha Harbor Phase 3. Menemsha Boathouse Fire July 2010.
Yachting Club CERN Pogoria cruise 2008 Sebastian Łopieński YCC /
3259A. Temporary Signs. One temporary sign is allowed per business for a period not to exceed five (5) weeks annually (35 days), provided: a.
Eagle Ford Shale Study November 11, Overview Map Eagle Ford Shale Study – Area Overview.
REGATTA N OTICE O F R ACE : Rum Runner Catamaran Regatta 1. RULES 1.1 The regatta will be governed by the rules as defined in The Racing Rules of Sailing.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
2010 Akron Power Squadron Cruise Presque Isle Erie, Pennsylvania July 16 th thru 18th.
Seasonal High Tunnel Systems for Crops Update on interim standard 798 Technical and Program guidance National bulletin: National Bulletin:
Updated Boating Laws / Regulations Summary of Act (effective date of July 1, 2006)
Impacts of Commercial and Residential Development on the Gulf Intracoastal Waterway: A Case Study in Alabama Dean Goodin, Ph.D. Eric Dohner Linda Brown,
CHAPTER FOUR BEACH RESORTS AND DESTINATION RESORT MARINAS: THE IMPACT OF DEVELOPMENT ON OPERATIONS Copyright © 2012 John Wiley & Sons, Inc. Photograph.
NMA Recommendations: Newport Harbor Mooring Fees and Transferability April 7, 2015 Presented to the Harbor Commission 1.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
Restore Coastal Access. Marina Hotel Slips, Jan 2008 MdR LCP Periodic Review.
Land Regulations Fish and Game Commission Meeting February 5, 2014 Craig Martz Env. Program Manager WFD/Regulations Unit 1.
Combined staff presentation for Items: 11a. - Periodic Review Response. 11b. - Local Coastal Program Amendment (MDR-01-11). 12a. - Waterside Coastal Development.
Harbor Walk Project Phase 1 Includes: Seawall Replacement Pedestrian Promenade Sidewalk Connection Small Boat Launch Parking Restroom Facility FDOT Funding.
US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division.
Agenda Item F 16a Moriarty Dock Replacement 2782 Bayshore Drive, Newport Beach.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
Downtown Marina and Promenade January 8, 2008 Agenda Items 6.05 & 6.09.
Rezoning Application #1277 Use Permit Applications #1044 & 1045 Hampton City Council January 14, 2009 Wallace Marina 365 Dandy Point Road.
City of Kodiak Harbor Rates. Harbor Rate Study Recommendations from Northern Economics – Option 1 ▫ 18.5% increase and increase based on Producer Price.
Data Center Stabilization
Agenda Updates to Driveway and Sidewalk specifications and permits
4.5(d) Notes: Modeling Periodic Behavior
Marina and Mooring Field
General Tab Project, Cost Schedule, and Work Limits Roadway Character
The AAIS Boatowners and Yacht Programs
Groundwater and Waste Management Committee November 9, 2016
Commerce Association of Lake Murray
Amended and Restated Interlocal Agreement for Entiat Marina
IUSB Education and Arts
Existing Boat Facilities
Gone Fishing Lodge.
Ladner Harbour.
CLEARWATER BEACH MARINA
General Tab Project, Cost Schedule, and Work Limits Roadway Character
St. Marys Intracoastal Gateway.
February 2007 Note: Source:.
Kamran Marashi, P.E., S.E. Jim Schettler, P.E., S.E.
Presentation transcript:

Waterfront & Boating Access Summit Marina Projects October 14, 2006

Update on Current Projects Major Structural Rehabilitation 5 th Dock Slip Expansion Courtesy Docks

Major Structural Rehabilitation $6.3M Renovation Selected Areas: Decking Pilings Water Lines Electrical Telephone Cable Completion Date: July 2007

5 th Dock Slip Expansion South Yacht Basin Additional 52 Slips Estimated Cost $3.3M FDEP Permit w/Conditions Water Quality Testing Water Circulators Storm Drain Interceptor Estimated Completion Date: December 2007

Courtesy Docks 18 Courtesy Slips Replace 26 Existing Slips Accommodate up to 27’ boats 6 24’ 11 27’ 1 40’ First Phase Complete Docking Fee

First Phase – Courtesy Docks

Courtesy Docks “Soft Opening” Interim Operating Procedures Mooring of boats is allowed from 6:00 am until 2:00 am daily. The docks are closed from 2:00 am until 6:00 am daily. There are no overnight stays allowed at the Courtesy Docks. The dock slips are numbered C-1 through C-8, with dock C-1 being the dock nearest Frescos. Dock C-1 can accommodate boats up to 40 feet in length. Slips C-2 through C-6 can accommodate boats up to 27 feet in length.

Courtesy Docks “Soft Opening” Interim Operating Procedures Slips C-7 and C-8 can accommodate boats up to 24 feet in length. Boat length maximums shall not be exceeded, as this could create a hazard to navigation for all boaters involved in maneuvering in a restricted waterway. The slips are for the use of the General Public. These procedures are for the “soft opening” of the Courtesy Docks. These procedures will be replaced with permanent operating procedures within the next several weeks.