Clean Air for Europe CAFE workplan CAFE WG TS PA 16 June 2004 André Zuber European.

Slides:



Advertisements
Similar presentations
Thematic Strategy on Air Pollution: First ideas for scenarios Matti Vainio Clean Air for Europe programme Working Group on Target Setting and Policy Assessment.
Advertisements

European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Update on TREMOVE.
European Commission - DG Environment Clean Air for Europe EU Thematic Strategy on Air Pollution Workshop on Review and Assessment of European Air Pollution.
European Commission Directorate-General for Energy and Transport n° 1 Air Quality & CAFE AREHNA WORKSHOP Kos, 3-5 May 2003 Mrs Michèle LEPELLETIER.
Marion Wichmann-Fiebig
Markus Amann International Institute for Applied Systems Analysis (IIASA) Links between climate, air pollution and energy policies Findings from the.
Marion Wichmann-Fiebig II 5 Abteilungsleiterin „Luft“ 1 Review of the Gothenburg Protocol Link to potential PM control under CLRTAP: – Specifies control.
State of model development: RAINS/GAINS International Institute for Applied Systems Analysis (IIASA) M. Amann, W. Asman, I. Bertok, A. Chambers, J. Cofala,
Integrated Assessment Modeling, cost-effectiveness, and agricultural projections in the RAINS model Zbigniew Klimont International Institute for Applied.
RAINS review 2004 The RAINS model: The approach. Cost-effectiveness needs integration Economic/energy development (projections) State of emission controls,
The Clean Air For Europe (CAFE) program: Scientific and economic assessment Markus Amann International Institute for Applied Systems Analysis.
European Environment Agency 11 th Joint EIONET/TFEIP meeting, May 2010, Larnaca Recent WGSR discussions concerning baseline scenarios for the Gothenburg.
1 Workshop on “Energy, greenhouse gas emissions and climate change scenarios” (29-30 June 2004, EEA, Copenhagen) Introduction to 2005 State of the Environment.
European Commission: DG Environment Overview of projections data use in the European policy-making process TFEIP Workshop on Emission Projections, 30 October.
European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Further Development.
European Commission - DG Environment Clean Air for Europe Peter Wicks European Commission DG Environment, Unit C1.
European Scenarios of Air Pollution and Greenhouse Gases Mitigation: Focus on Poland J. Cofala, M. Amann, W. Asman, I. Bertok, C. Heyes, Z. Klimont, L.
Baseline emission projections for the EU-27 Results from the EC4MACS project and work plan for the TSAP revision Markus Amann International Institute for.
Application of IIASA GAINS Model for Integrated Assessment of Air Pollution in Europe Janusz Cofala International Institute for Applied Systems Analysis.
European Commission - DG Environment CBA in CAFE Cost-Benefit Analysis of the Clean Air for Europe Programme CLRTAP, TFIAM 28th session Haarlem, 7-9 May.
Impact of the EGTEI proposed ELVs on Emission Scenarios UNECE Convention on Long-range Transboundary Air Pollution Modelling analysis performed by the.
IIASA M. Amann, J. Cofala, Z. Klimont International Institute for Applied Systems Analysis Progress in developing the baseline scenario for CAFE.
Thematic Strategy on Air Pollution CAFE team, DG Environment and streamlined air quality legislation.
Baseline emission projections for the revision of the Gothenburg protocol Markus Amann Centre for Integrated Assessment Modelling (CIAM) International.
Integrated Assessment of Air Pollution and Greenhouse Gases Mitigation Janusz Cofala International Institute for Applied Systems Analysis (IIASA) Laxenburg,
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment,
Preparations for the review of the Gothenburg Protocol Report to the WGSR September 2006 Markus Amann et al., EMEP Centre for Integrated Assessment Modelling.
1 Monitoring and assessment in Europe Joining forces between EMEP and EEA Roel van Aalst 30 May 2001.
Clean Air for Europe TFIAM Conference Planning of the CAFE programme AMIENS May 2004 André Zuber & Matti Vainio Environment DG - European Commission TFIAM.
European Commission DG Environment Marine Environment and Water Industry Unit Marine Strategy Framework Directive: Progress with Art. 12 assessment WG.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Clean Air for Europe ROLE OF ENERGY BASELINE IN CAFE 28 February 2002 Matti Vainio DG Environment, Air Quality and Noise Unit.
Particulates: Where is the current policy emphasis in the EU CAFE Programme? A contribution to the panel discussion “Nanoparticles from road vehicle exhaust:
UNECE WG PM Berlin May 2005 Duncan Johnstone
Clean Air for Europe Revision of the NECD
Clean Air for Europe and Research Needs
Calculation of evaporative emissions with COPERT Giorgos Mellios
NEC National Programmes
Project Coordination Group (PCG) for the implementation of the MSFD
Gert-Jan Monteny (WUR-ASG);
Clean Air & Transport Unit of DG Environment
Marine Environment and Water Industry Unit
Thematic Strategy on Air Pollution
Time table for revision of the NECD
M. Amann, W. Asman, I. Bertok, J. Cofala, C. Heyes,
CAFE Work Programme Preparing the Thematic strategy on air pollution
Markus Amann, CIAM Status of the RAINS model development for the review of the Gothenburg Protocol.
Jacques Delsalle Clean Air and Transport Unit DG ENV
Time table for revision of the NECD NECD Inter-service meeting
Integrated measures to reduce Ammonia emissions
CAFE baseline dissemination workshop
&file 22/02/2019 National Programmes under the National Emission Ceilings Directive (NECD) André Zuber, European Commission, DG Environment Working group.
IPPC Review Stakeholder Hearing
Methods for Benefits Assessment and CBA for the NEC Directive Revision
CAFE CBA Paul Watkiss and Steve Pye, AEA Technology Environment
Environmental objectives and target setting
The Thematic strategy and the possible measures of action
Ad-hoc stakeholder consultation meeting on the CAFE baseline scenario in agriculture Welcome October 8, 2003 Stakeholder consultation on CAFE baseline.
CAFE Work Programme Preparing the Thematic strategy on air pollution
CAFE baseline dissemination workshop
Thematic Strategy on Air Pollution
Second Stakeholder Expert Group meeting 19-20/01/2012
Review of Decision 2010/477/EU and MSFD Annex III
CAFE Steering Group 11 May 2005
Tentative Ideas for Co-operation
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Marine Environment and Water Industry Unit
André Zuber, DG Environment
Meeting Water Directors
Presentation transcript:

Clean Air for Europe CAFE workplan CAFE WG TS PA 16 June André Zuber European Commission Environment Directorate-General Clean Air and Transport Unit

Clean Air for Europe Thematic Strategy Finalisation of RAINS model development Technical inputs of abatement potential and costs Consultations with MS qnd industry Publish CAFE Baseline CAFE Baseline ready & agreed Development of TREMOVE transport model Development CBA framework Model runs of policy packages Definition of policy packages Advice on health and ecosystems effects Assessing policies qualitatively and quantitatively Drafting Integrated policy advice and Thematic Strategy Data on NEC, AQ and own studies Schematic outline of CAFE timeline Input from conferences WHO summary report Revised NEC 2006 Accompanying legislation / measures

Clean Air for Europe CAFE workplan Preparing the Thematic strategy on air pollution l l November CAFE SG advice on policy options l l February 2005 CAFE SG integrated policy advice l l 1 April 2005 – TS to Commission Interservice Consultation l l May CAFE SG and information on main policy packages l l June 2005 – TS adopted by Commission with proposals for legislation

Clean Air for Europe CAFE workplan WG Target Setting and Policy assessment l l September 2004 – first results of RAINS PaM scenarios and further advice from CAFE WG TSPA on PaMs l l November 2004 – discussions of results in CAFE WGs and SG. Possibly further advice. l l Jan/Feb 2005 – Joint meeting with the WG PM. Discussion of IAM results and further final advice l l Mars 2005 Possible WG TS PA final adjustments

Clean Air for Europe CAFE workplan New contracts in 2004 l l Analysis and design of local air quality measurements l l NEC review l l Analysis of synergies between air pollution and climate change policies + Review of CBA methodology l l Optimal control areas for eutrophication, acidification and tropospheric ozone in the enlarged EU l l Adaptation of target load functions for RAINS l l Technical support for development of Euro5 and 6