AP2-Debuncher Injection Area 2004 Shutdown Work August 2, 2004.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
STEAM TRAPS.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels
August 11, 2004SPEAR3 Chicane Lattice Review Lifetime and injection efficiency vs. Dynamic and physical aperture; Measurement & simulation.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Delivery Ring Abort B. Drendel 3/17/14. Abort Dump Location The AP2 line will stay as-is between the present IQ29 and the Debuncher. This includes all.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Vacuum system.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
B11R09 RF Link Repeater Pbar CAMAC Crate $10 Pbar CAMAC Crate $1c Pbar MADC PBAR07 Crate 10 Slot 10 Pbar MADC 29 Crate 10 Slots 15,16 PS Beam Permit Interlock.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003.
B11R09 Link Repeater CAMAC Crate $10 CAMAC Crate $1c MADC PBAR07 Crate 10 Slot 10 MADC 29 Crate 10 Slots 15,16 PS Beam Permit Interlock Chain.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
AP2 & Debuncher Acceptance Keith Gollwitzer Dept. of Energy Review February 25, 2004.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Weekly Pbar Report 10/2 → 10/9. Stacking This Week …
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Antiproton Acceptance Steve Werkema February 8, 2005.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Report Technical Director Storage-Ring-Installation Completed
Preparation Phase of the FAIR Project
ELENA installation and commissioning status
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Strip-line Kicker R&D at KEK-ATF
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
A. Freyberg Aug 2016 ECT’16 =>
Presentation transcript:

AP2-Debuncher Injection Area 2004 Shutdown Work August 2, 2004

What’s Today For? Will the modifications reduce the beam steering hazards and ease injection tuning? What rare the physical risks to the Debuncher components? Do the modifications allow for easy/quick retreat if there are problems after attempting beam?

What’s happening? Injection Septum –Modification of removing material between Closed Orbit and Injection Channel Decreases amount of closed orbit bump Common vacuum eliminates air gap and vacuum windows –Vertical motion of stand Will use to center injection channel on beam D4Q4 SQC replacement with 2 LQBs –Injection orbit path designed to skim top of extended lobe star beam tube inside SQC –LQBs allow larger beam tube.

What’s happening? D4Q4 BPM –Injection orbit path designed to skim large BPM. –Move BPM downstream where injection orbit is closer to closed orbit. Injection Kicker –Motorizing stand to center upon beam Larger beam tube through LQs (4Q5 and new 4Q4 pair) –Replacing two separate pipes thru D4Q5 –New pipe will nestle up into coils as far as possible

Beam Pipes into D4Q5

Separate Pipes into D4Q5

Two pipes out of D4Q5

Two pipes in D4Q5

Current ISEP

Modified ISEP with Beam Tube

Modified ISEP & Characters

ISEP-Gap-Bellows-BPM-SQC Quad

Current BPM & SQC Star Chamber

SQC & LQB marks on floor

SQC & VT403; more LQB marks

D4Q3 & IKIK

Lattice with LQBs Current Lattice Debuncher

Lattice with LQBs Current Lattice AP2

Non-Mechanical Tunnel Work Power Supply –1200A PS available; ready to move to AP50 Cable Pulls and Terminations –LQBs power, –Stand motors, –new BPM, –moving BPM(?), –ion pumps, –gate valve Water (LCW) –Power supply –LQBs From D. VanderMeulen

Non-Tunnel Work Controls/ACNET –LQBs: Setting & Readback –ISEP motion control by old CAMAC interface –IKIK motion control by PLC Console Applications/ Software –LQBs P102: Modify bus cycling software P60: Modify tune mults that currently uses D4Q4 shunt –New Ion Pumps & Gate Valve Add to P17 & P18 –LQB, VT403, & Debuncher BPM positions P144: Debuncher orbit correction program –New BPM and moved SEM Yet to be written AP2 BPM DAQ and orbit correction program From D. VanderMeulen