Submission on surplus and carry over of AAUs  AOSIS  AFRICA  BRAZIL Quantitative illustrative examples of the impacts-UNFCCC.

Slides:



Advertisements
Similar presentations
1 KYOTO PROTOCOL: UPDATE ON ACTIVITIES OF THE AD HOC WORKING GROUP ON FURTHER COMMITMENTS FOR ANNEX I PARTIES UNDER THE KP. PRESENTED BY SETH OSAFO AMCEN.
Advertisements

NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
CAPACITY BUILDING WITHIN THE UNFCCC AND LDCS Richard Muyungi United Republic of Tanzania.
© 2009 Pearson Prentice Hall. All rights reserved. Process Costing.
The national communications process: status and trends Workshop on exchange of experiences and good practices among non-Annex I Parties in preparing national.
JCF March, 2006 Issues on and Requests for Joint Implementation ( “JI” ) Projects Institutional Framework on Joint Implementation ( “JI” ) Projects Yusuke.
Sectoral Approaches to the Post-2012 Climate Change Policy Architecture Jake Schmidt, Director of International Programs Center for Clean Air Policy *******
Greenhouse Gas Emissions Trading Simulation (GETS 4) GETS 4 - an assessment of future world GHG emission reduction schemes to 2012 and beyond June,
European capacity building initiativeecbi Post-2012 Scenarios Elements of the BASIC Sao Paoulo Proposal Benito Müller european capacity building initiative.
Reducing Emissions from Deforestation in Developing Countries Thelma Krug INPE/IAI IEA, São Paulo, 16 September, 2006.
1 Climate and Deforestation Positive incentives to reduce deforestation emissions in developing countries: views from Brazil.
The state of negotiations on the Kyoto Protocol’s Second Commitment Period Workshop of the Lead Coordinators of the African Group of Negotiators on Climate.
1 Andrew Howard UNFCCC secretariat Checks to be performed by the international transaction log Consultations on registry.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Presentation title Workshop on the implications of the implementation of decisions 2/CMP.7 to 4/CMP.7 and 1/CMP.8 on the previous decisions on methodological.
Revision of key attributes and transitional measures relating to possible changes in the JI guidelines Wolfgang Seidel, Chair of the Joint Implementation.
AAU trading standards: the Latvian Approach Ilze Prūse Head of the Pilot Projects Implementation Division of the Climate and Renewable Energy Department.
Climate mitigation at the UNFCCC Georgina Woods, Climate Action Network Australia Sept Emissions data taken from WRI, or from.
Presentation title Overview of measurement, reporting and verification (MRV) for developing country Parties under the Climate Change Convention Asia Pacific.
UNFCCC Workshop on the Use of the Guidelines for the Preparation of National Communications from non- Annex I Parties Programmes Containing Measures to.
Maintenance of Effort (MOE) Excess Cost Presenter Patricia Holcomb-Gray Office of Special Education Programs NJ Department of Education June 3, 2015.
1 Andrew Howard UNFCCC secretariat Registry systems and the data exchange standards Intersessional consultations on registry.
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
CONTRACTING FOR CARBON Legal Framework for JI Projects under the Kyoto Protocol.
UNFCCC Information Event
Introduction of technical paper Funding adaptation in developing countries: extending the share of proceeds used to assist in meeting the costs of adaptation;
Joint implementation, eligibility and the Compliance Committee Andrew Howard, Reporting Data and Analysis Cam Carruthers, Legal Affairs Bonn, October 2007.
Technology Transfer Activities under the UNFCCC by Ms. Christine Zumkeller.
1 Registry Issues for Domestic Emissions Trading and the Kyoto Mechanisms Consultations on Registries Bonn June 2, 2002 Erik Haites Margaree Consultants.
UNFCCC secretariat Session 4 Meeting eligibility requirements First UNFCCC workshop on implementation of Article 6 projects under the Kyoto.
1 A REGIONAL PERSPECTIVE ON COP ISSUES – SESSION 4: DEVELOPMENT AND TRANSFER OF TECHNOLOGY By Angela Katongo Kabuswe.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
Greenhouse Gas (GHG) Monitoring, Reporting and Registries Pierre Boileau Greenhouse Gas Division Presentation for the Kyoto Mechanisms Seminar for the.
CHAPTER 12 & 13 INTERNATIONAL EXCHANGE AND CREDIT MARKETS.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. State and Trends of the.
United Nations Framework Convention on Climate Change (UNFCCC) Workshop on the preparation of national communications from non-Annex I Parties Manila,
OPTIONS TO USE EXISTING INTERNATIONAL OFFSET PROGRAMS IN A DOMESTIC CONTEXT Case Study: The use of CDM in support of domestic offset schemes Sacramento,
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
EXECUTIVE ROUNDTABLE SERIES Aviation in the EU Emission Trading Scheme Sophie Hagège, M&A Partner June 3, 2010 KEY LEGAL CONSIDERATIONS GOVERNING THE NEXT.
1 UNFCCC national communications process/ linkages with AIACC AIACC Africa and Indian Ocean Islands Regional Workshop 24 May 2003 Dakar, Senegal Festus.
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
UNFCCC secretariat Ruta Bubniene, Programme officer, Reporting and Review unit, Mitigation and Data Analysis programme Overview of the synthesis report.
Margaret Mukahanana Sangarwe. SHARED VISION FOR LONG TERM COOPERATIVE ACTION There was a shared vision in paragraphs 1-7 of the Cancun Decision The Cancun.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
The Kyoto Protocol’s Flexibility Mechanisms. Major Issues in Implementing Flex Mechs Supplementarity Additionality – Baselines – Additionality – Leakage.
1 Indirect Cost Recovery Request for Supplementary Appropriation Program-Budget 2013 Secretariat for Administration and Finance.
Guidelines for non-Annex I National Communications Implications for Assessment of Impacts of, and Adaptation to Climate Change Asia-Pacific Regional Workshop.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
Compliance Issues – Kyoto Protocol ______________ M.J. Mace, FIELD Workshop for LDC Negotiators UNFCCC COP 11 and Kyoto Protocol COP/MOP November.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
AWG in session workshop LULUCF Treatment of LULUCF Need to make sure that we do not re-write the Marrakech Accords Need to keep accounting approaches as.
Key challenges and possible new formats for CDM post-2012 ECBI Fellowships, Oxford, Sep. 3, 2007 Axel Michaelowa,
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Policy, normative base and experience of Kyoto Protocol implementation in Bulgaria and other Central European Countries Daniela Stoycheva Consultant emissions.
Introduction to registry systems
Brief Overview of Legal Framework: UNFCCC and Kyoto Protocol M.J.Mace Climate Change and Energy Programme, FIELD LDC Workshop Montreal Canada November.
1 Questions  Forest related outcomes of the UNFCCC meeting in Cancun (COP16) and EU’s position regarding forest in the ongoing climate change negotiations.
1 Climate and Deforestation Positive incentives to reduce deforestation emissions in developing countries: views from Brazil.
Presentation title User-friendly document – reporting, accounting and review – second commitment period KP 14th meeting of GHG inventory Lead Reviewers.
COP and CMP negotiations relating to Annex I GHG inventories
Eligibility issues and joint implementation
Issues in linking registries and the transaction log
New readings… Research paper assignment…
Submission on QELROs EU and AOSIS.
Joint implementation and eligibility requirements
Enhanced transparency framework and examples of flexibilities
Presentation transcript:

Submission on surplus and carry over of AAUs  AOSIS  AFRICA  BRAZIL Quantitative illustrative examples of the impacts-UNFCCC

Assumptions and conditions Calculation of surplus from the first commitment period GHG inventory data from the most recently reviewed inventory submission 2011 submission (base year – 2009 data) Initial assigned amount for the first commitment period Inventory submission data for 2008 for the accounting of the LULUCF sector (Article 3, paragraphs 3 and 4) Assigned amount for the second commitment period determined from QELROs set by Parties or included in FCCC/TP/2010/3/Rev.1 Assigned amount

13 bis. All banked units are addressed- CERs, ERUs, AAUs –PPSR 13 ter. After the end of the subsequent commitment period (CP2), a Party may use, for the purpose of its compliance assessment, any carried over units up to a quantity which is equal to [5] % of the difference between the Party's inventory emissions in 2008 x [5][8] and its assigned amount for the current commitment period, if that assigned amount is lower than the Party's inventory emissions in 2008 x [5][8], & only up to the extent of the Previous Period Surplus Reserve. Key elements: Eliminates surplus for Parties that have brought forward CP2 QELROs above current emission levels PPSR units may only be used toward domestic compliance assessment, and only if actual emissions at end of CP2 are above 2CP assigned amount Provides incentive to take QELROs below current emissions, because the deeper the target, the greater the access to the PPSR Measurement points are clear and known inventory; 2CP assigned amount AOSIS: Submission on surplus and carry over of AAUs

Quantitative implications Total surplus supply from CP1 if 100% carried over to CP2 (after subtracting deficits of some countries in CP1) for Annex I as a group is roughly 10 GtCO2eq; 6 Gt for CP 2 Parties that will have QELROs Total demand for compliance in CP2 for Annex I as a group is roughly 11 Gt, BUT demand is only 1 Gt if "new surplus" is created in CP2 At 5%, the AOSIS proposal would allow use of PPSR of 0.3 Gt for Annex I Parties as a group; 0.1 Gt for CP2 Parties

13 quarter. Parties with special circumstances re LULUCF fluctuations may retire up to an amount specified in Annex C, or the 1%, whichever is higher, or an alternative proposal based on ring-fencing LULUCF surplus. Elements: Par 13. Surplus AAUs can all be carried over but are placed in a special reserve, provided that: The Party is participating in 2CP The Party's QELRO is lower than its 2008 inventory  if the emissions of such a Party in the CP1 are less than its AA for that period under this Article, this difference shall, on request of that Party, be transferred to a PPSR for the concerned Party as surplus AAU. Any CERs and ERUs transferred from the CP1 shall similarly be placed in the PPSR. 13 bis. Parties may trade 2% of this PPSR per year. 1% of revenue to be spent on domestic mitigation; 1% of AAUs to be transferred to the Adaptation Fund 13 ter. If Parties are short of AAUs for compliance at the end of 2CP, up to 1% of a Party's AAU total for 2CP can be retired from this fund for compliance purposes, provided adequate units remain in the fund. 13 quinqies. Any unused units at the end of the second commitment period should be cancelled. AFRICA: Submission on surplus and carry over of AAUs

Brazil: Submission on surplus and carry over of AAUs 13. If the emissions of a Party included in Annex I in a CP are less than its AA under this Article, this difference shall, on request of that Party, be carried-over to the subsequent commitment period, as follows: a. If the AA of a Party included in Annex I for the CP1 is less or equal than that Party’s emissions in 2007, multiplied by five, the difference between the AA for that Party for the CP1 and its average emissions from 2008 to 2012, multiplied by five, shall be deemed the Previous Period Surplus Reserve, if positive. b. If the AA of a Party included in Annex I for the CP1 is greater than that Party’s emission in 2007 multiplied by five, the difference between that Party’s emissions in 2007 multiplied by five and its average emissions from 2008 to 2012, multiplied by five shall be deemed the PPSR, if positive.

13 ter. After the end of the CP2, the units of a Party included in Annex I PPSR may be added to its AA. 13 qua. The difference between the AA of a Party included in the Annex I and the emissions of that Party in the CP2, deducted, when applicable, from the units transferred to its cancellation account, in accordance with Article 13 bis, may be carried-over, if positive, to the subsequent CP. 13 bis. The difference between the AA of the CP2 for a Party included in the Annex I and the emissions in the last year of the CP1 multiplied by [five][eight] shall be transferred to the cancellation account of that Party.