Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.

Slides:



Advertisements
Similar presentations
Topics SWIM State of the System, Conceptual Overview FTI IP Backbone
Advertisements

Federal Aviation Administration Presented To:Aeronautical Communications Panel (ACP) Working Group I – Networking Subgroup – Internet Communications Services.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Aeronautical Services
Laboratory Technical Services Branch
Sixth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Presented to: Network Centric Demonstrations and Prototypes Technical Interchange By: Deborah Young Date: November 4, 2009.
Date: Federal Aviation Administration FPAW – Segment 4 Data Centric Weather October 31, 2012 Presented to: Friends and Partners of Aviation Weather (FPAW)
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
External Consumer Access to FAA Data Sets via SWIM
Federal Aviation Administration SWIM Users Forum – Kick Off - “STDDS Services” By: Jeri Groce - SWIM PMO To: STDDS Consumers Date: February 12, 2015.
Delivering Digital NOTAMs over
Click to add text Michigan.gov Content Management Software Migration Project.
Presented to: By: Date: Federal Aviation Administration Standard Operating Procedures/Letters of Agreement Overview and Demonstration Demonstration and.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
System Wide Information Management (SWIM)
Federal Aviation Administration External Consumer Access to FAA Data via SWIM FAA Communications, Information & Network Programs Group (CINP) Date: July.
Presented to: By: Date: Federal Aviation Administration FY12 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
System-Wide Information Management (SWIM) Program and Delivery
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Presented to: TIM Participants By: Dominic (Bud) Timoteo Date: May 4, 2011 Federal Aviation Administration SWIM Laboratory Update Demonstrations and Prototypes.
System Wide Information Management (SWIM) Segment 1 Status Update
Presented at: Demonstrations and Prototypes TIM 7 Presented by: Dominic Timoteo / Shoeb Jafri SWIM Implementation Team May 04, 2011 Federal Aviation Administration.
Presented to: By: Date: Federal Aviation Administration SWIM Governance Demonstration and Prototyping Information Exchange Briefing Paul Jackson November.
1 Federal Aviation Administration AIXM/WXXM Conference May 4, 2010V.1.0 Digital Information Exchange Digital Convergence on the Common Operating Picture.
By: Date: Federal Aviation Administration AIXM Conference Don Smith and Vinod Vallikat Aeronautical Information Management March 18, 2007 Digital NOTAM:
Presented to: By: Date: Federal Aviation Administration Web Services Implemented During System Wide Information Management (SWIM) Segment 1 AIXM/WXXM Conference.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration System Wide Information Management Segment 2 JRC Progress Presented to: Demonstrations and Prototypes TIM 5 Presented by:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: By: Date: Federal Aviation Administration Weather System Engineering Issues Friends & Partners in Aviation Wx Raymond Moy, Air Traffic Organization,
Presented to: Net-Centric Demos/Prototypes TIM By: Mike Hritz Date: May 4, 2011 Federal Aviation Administration System Wide Information Management (SWIM)
Presented to: By: Date: Federal Aviation Administration System Wide Information Management (SWIM) “SWIM and Making Service Orientation Pay Off” 9 th SOA.
Federal Aviation Administration NextGen Integration & Evaluation Capability (NIEC) Presented by: Vince Lasewicz Laboratory Services Group Date: 01/07/10.
Presented to: By: Date: Federal Aviation Administration System Wide Information Management (SWIM) “SWIM and Making Service Orientation Pay Off” 9 th SOA.
System Wide Information Management (SWIM). FAA Transition to Service Oriented Architecture (SOA) - System Wide Information Management (SWIM) Initiative.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
Presented to: Net Centric Demonstrations and Prototypes TIM #5 By: Mary Delemarre Federal Aviation Administration WJHTC Laboratory Services Group Concepts.
Federal Aviation Administration Presented to: Eurocontrol/SJU By: Mike Hritz Date: December 2009 System-Wide Information Management (SWIM) SWIM in General.
© 2012 LAIC Aktiengesellschaft © 2012 LAIC Aktiengesellschaft Presentation to Baku, Azerbaijan December 2012 Air Navigation Services.
Federal Aviation Administration FPAW October Delivering NextGen Next Generation Air Transportation System Presented to: FPAW By: Alfred Moosakhanian,
Presented to: By: Date: Federal Aviation Administration NextGen Network Enabled Weather Capability Evaluations Demonstration and Prototyping Information.
By: Date: Federal Aviation Administration NextGen Overview Storyboard 10 th Annual Verification & Validation Summit Harry William Bilicki September 24.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: By: Date: Federal Aviation Administration Network Enabled Operations (NEO Spiral II Demonstration and Prototyping Information Exchange Briefing.
Presented to: By: Date: Federal Aviation Administration FY11 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
AVIATION WEATHER Presented by: John Staples, Director of Flight Service Program Operations October 13, 2004.
CO – CART Project Status Protocol Revision Subcommittee Update 08/17/2006.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Presented to: By: Date: Federal Aviation Administration Florida NextGen Test Bed Demonstration and Prototyping Information Exchange Briefing Alex Nguyen,
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Topics SWIM State of the System, Conceptual Overview FTI IP Backbone
By: Rhonda Thomas, ATC Communications Services SWIM Acquisition Lead
Air traffic control How Stressful is that?.
International Civil Aviation Organization
Mini Global Demonstration
External Consumer Access to FAA Data via SWIM
International Civil Aviation Organization
System Wide Information Management (SWIM)
Friends of Aviation October 23, 2002
TDWR Measurement Capabilities
Controllers most wanted for aviation weather
February 2007 Note: Source:.
Operational Context and Use Case Focus Group
Operational Context and Use Case Focus Group
Operational Context and Use Case Focus Group
Operational Context and Use Case Focus Group
Presentation transcript:

Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes TIM 5 Presented by: Jeffery L. Hobbs Date: May 26, 2010

2 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Aeronautical Information Management (AIM) Operational Repository Deployment is planned for July 7, 2010 Static Repository Deployment is Planned for June 28, 2010 Editor Deployment is TBD –OKC site location pending Initial Operating Capability is Tentatively Planned for September 13, 2010

3 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Traffic Flow Management (TFM) Reroute Service (R5) –Early Developer Testing with ERAM Continues in June 2010 –Additional Development Continues –Deployment Planned for April 2011 Flow Publication Service (R7) –Requirements Complete –Early Prototyping –High Level Design in Process

4 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 En Route Automation Modernization (ERAM) Phase 1 (Reroute/R3) Key Site TBD Phase 1 Developer Testing with TFM Ongoing Completed 16 of 18 Iterations of Phase 1 Phase 2 Hardware Evaluation ongoing –Number of Sites –Storage Requirements –Performance Requirements –Security Requirements

5 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Corridor Integrated Weather Service (CIWS) CIWS Prototype Operational with 5 products –Client Package (User guide, CIWS Product Report, and Client software) Developed and Provided to Users –Signed MOAs with Delta Airlines, Raytheon Company, ARINC, Harris Corporation, Kent State University, and WSI Corporation CIWS Capability Software under Development –Enhanced Monitoring Software Completed –Additional 10 Products will Included in Capability CIWS Capability Operational September, 2010

6 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Weather Message Switching Center Replacement (WMSCR) Connected to FTI National Test Bed Completed SAT Procedures Designed Circuit Monitoring and in Process of Implementation IOC planned for June 2011

7 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Integrated Terminal Weather System (ITWS) ITWS Prototype Operational began on October 6, 2008 with 4 products –UPS, Harris, DoD, and FedEx, NWA have Signed MOAs –UPS, Harris, DoD, and FedEx are Receiving Data –31 Products currently now Available Refining ITWS Capability –Capability Planned to be Operational January 2011

8 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 Terminal Data Distribution System (TDDS) Completed Proof of Concept Started Prototype Development Requirements Development in Process Started Safety Process for Capability Capability Planned to be Operational May 2013

9 Federal Aviation Administration Presented to: Demonstrations and Prototypes TIM 5 Date: May 26, 2010 SWIM Implementation Registry/Repository contract awarded to HP for Systinet on April 27, 2010 Registry/Repository will be operational on Administrative LAN at the WJHTC on July 1, 2010 Revision to the XML QVL in process