8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.

Slides:



Advertisements
Similar presentations
Trane Variable Water Flow System
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Wel Handy Mini For horizontal and vertical (down) fillet welding operations.
Magnets for the ESRF upgrade phase II
Silica Research in Glasgow Gianpietro Cagnoli – IGR - University of Glasgow GEO Collaboration Ginzton Lab, Stanford Caltech.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
ULTRASONIC WELDING.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
IPBSM status and plan ATF project meeting M.Oroku.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
Neil Dixon PH/DT CERN 22/03/10 Straw Material Plans Latest news. Latest news. Many tests ongoing at CERN and in JINR in and attempt to validate in and.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
The HCAL barrel absorber structure
URL: 12-1, Hisakata 2-chome, Tempaku-ku, Nagoya JAPAN (C)2001 Manufacturing Engineering Laboratory,
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
My personal Resumé Very interesting work-shop, stimulating atmosphere and very good discussions. Accommodation is excellent. For the Straw Project we have.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Multiple Module Vacuum Oven Productivity Enhancement System.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Microscopic Observations and Tensile Tests of the straws - Optical microscope observations - SEM observations - Tensile tests results Presented by M. Scheubel.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Manufacturing of a 60 x 60 cm2 Gadolinium cathode with ultrasonic welding Patrik Thuiner.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
S.Movchan Straw manufacturing and QC
new straw end plug: D=10.6 mm straws support frame Levan option
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Quality Control in Straw Production
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
HPR activities at INFN Milan
Status of straw production straw module assembling
Challenges of vacuum chambers with adjustable gap for SC undulators
ILC Main Linac Superconducting Splittable Quadrupole
Leaders in Light Perfect for Raman
Presentation transcript:

8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after upgrade parameters optimization “new” straws compare “new” straws with “old” straws straw storage box and room Presented by S.Movchan

8-Mar-16S.Movchan Straw manufacturing and QC2 Laser X-Y level control device

8-Mar-16S.Movchan Straw manufacturing and QC3 Machine elements vertical alignment check

8-Mar-16S.Movchan Straw manufacturing and QC4 Machine elements horizontal alignment check

8-Mar-16S.Movchan Straw manufacturing and QC5 Straw machine current set up

8-Mar-16S.Movchan Straw manufacturing and QC6 Common view

8-Mar-16S.Movchan Straw manufacturing and QC7 Tape transportation Tape pretention F=350 gram

8-Mar-16S.Movchan Straw manufacturing and QC8 Rollers position

8-Mar-16S.Movchan Straw manufacturing and QC9 Anvil prototype Advantages: - set of anvils (from different materials, any shape) - easy change - all parts is polish - possibility to install diodes for seam lighting from inside Stainless still D=9.73 mm

8-Mar-16S.Movchan Straw manufacturing and QC10 Fixture Teflon D=9.90 mm

8-Mar-16S.Movchan Straw manufacturing and QC11 Ultrasonic generator Nominal F=39300 Hz

8-Mar-16S.Movchan Straw manufacturing and QC12 Generator stability study: frequency vs Temp K=-20 Hz/degree

8-Mar-16S.Movchan Straw manufacturing and QC13 Sonotrode cooling T=(27±1) degree F=(39300±50) Hz

8-Mar-16S.Movchan Straw manufacturing and QC14 Power Power: 10, 20 …100 a.u.

8-Mar-16S.Movchan Straw manufacturing and QC15 Sonotrode pressure to tape regulation K=10 g/mm

8-Mar-16S.Movchan Straw manufacturing and QC16 Sonotrode angle About 8.5 degree

8-Mar-16S.Movchan Straw manufacturing and QC17 Straw speed transportation

8-Mar-16S.Movchan Straw manufacturing and QC18 Clean room: T and H monitoring (August 2010)

8-Mar-16S.Movchan Straw manufacturing and QC19 Dubna tensile machine Sample: O-ring h=5.0 mm

8-Mar-16S.Movchan Straw manufacturing and QC20 Machine verification Fmax= 6.1 kg Elastic limit is about F=4 kg per 5 mm straw ring Fmax= 5.4 kg Elastic limit is about F=3.9 kg sample width W =10 mm Hostaphan RNK mkm

8-Mar-16S.Movchan Straw manufacturing and QC21 “Old” straw F=(3-5) kg, Fmax=6.4 kg

8-Mar-16S.Movchan Straw manufacturing and QC22 F vs dL (“old” straw machine status) “Old” straw machine status: F ≥ 3 kg

8-Mar-16S.Movchan Straw manufacturing and QC23 Good seams: PET nonelastic elongation: dL=(3-16) mm at F=( ) kg

8-Mar-16S.Movchan Straw manufacturing and QC24 Reference seam: F=6.4 kg, dL=16 mm Back lightFront light dL=16 mm

8-Mar-16S.Movchan Straw manufacturing and QC25 Example of bracken seams (back light) Sample #19: 6.0 kgSample #03: 4.9 kg

8-Mar-16S.Movchan Straw manufacturing and QC26 Parameters optimization after straw machine upgrade

8-Mar-16S.Movchan Straw manufacturing and QC27 Ultrasonic generator + sonotrode: standard mode vs cooling mode T=26 degree f: (39300±50) Hz T=35 degree f: > Hz F=180 gram, W=60 a.u. V=10 mm/sec Near the same => cooling mode was chosen F=4 kG

8-Mar-16S.Movchan Straw manufacturing and QC28 Parameters optimization: Force: F=(190±30) gram Ultrasonic power: W=(40±10) a.u. F= 180 g V=10 mm/sec W= 40 a.u. V=10 mm/sec

8-Mar-16S.Movchan Straw manufacturing and QC29 Parameters optimization: Speed: No dependence V=(10-20) mm/sec F= 180 g W=40 a.u.

8-Mar-16S.Movchan Straw manufacturing and QC30 New straws after straw machine upgrade

8-Mar-16S.Movchan Straw manufacturing and QC31 New straws: #3644 and #3645 F=4.2 kG -> 5.0 kG F=4.2 kG -> 3.5 kG F=210 gram, W=60 a.u. V=10 mm/sec

8-Mar-16S.Movchan Straw manufacturing and QC32 New straw: #3643 F=4.5 kG -> 4.0 kG F=200 gram, W=60 a.u. V=10 mm/sec

8-Mar-16S.Movchan Straw manufacturing and QC33 New straw: #3646 F=4.0 kG -> 4.0 kG F=180 gram, W=60 a.u. V=10 mm/sec

8-Mar-16S.Movchan Straw manufacturing and QC34 New straw: #3652 (check Ribbon option) F=205 G, W=60 a.u. V=10 mm/sec F=2.5 kG -> 3.0 kG

8-Mar-16S.Movchan Straw manufacturing and QC35 New straw: #3658 (check Ribbon option) F=4.0 kG -> 3.0 kG F=300 G, W=40 a.u. V=10 mm/sec

8-Mar-16S.Movchan Straw manufacturing and QC36 Conclusion Tensile machine in operation “Old” straws: Al straw (53 samples after test dP=3 Bar): F=( ) kg Cu+Au straw (48 samples, not tested at dP=3 bar): F=( ) kg, for 2 samples F=6.0 kg and F=6.4 kg Good seam: - PET alloy on both seam sides - F>4.3 kg (dL=2 mm) “New” straw: the same parameters

8-Mar-16S.Movchan Straw manufacturing and QC37

8-Mar-16S.Movchan Straw manufacturing and QC38 Straw storage box

8-Mar-16S.Movchan Straw manufacturing and QC39 Storage room view

8-Mar-16S.Movchan Straw manufacturing and QC40