Biomass CHP TŘEBÍČI Czech Republic
Historie projektu 12/ boiler house K13
Historie projektu 10/2001 – Gas-fired boilers 2 x 5 MWt
Historie projektu Total capacity 10 MWt Total capacity 0 MWe 5MW Vjezd do areálu
Historie projektu 01/2002 – Biomass boiler, Vesko-B 3,0 MW
Historie projektu biomass boiler house 01/2002
Historie projektu Total capacity 13 MWt Total capacity 0 MWe 5MW Vjezd do areálu 3MW
Historie projektu 01/2002 – Gas-fired CHP steam boiler TEDOM 140 a TEDOM 132
Historie projektu Total capacity 13,4 MWt Total capacity 0,27 MWe 5MW Vjezd do areálu 3MW MT 140 MT 132
Historie projektu 10/2004 – Gas-fired boilers 2 x 6 MW
Historie projektu Total capacity 25,4 MWt Total capacity 0,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132
Historie projektu 01/2005 – Biomass boiler 7 MWt (including ORC)
Historie projektu Ash container Fuel storage
Historie projektu 02/2005 – Chimney biomass boiler
Historie projektu 04/ ORC turbíne 1 MWe
Historie projektu 05/2005 – Heat exchanger 1800 m 3 for thermal oil
Historie projektu Total capacity 32,4 MWt Total capacity 1,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132 ORC 1 MW 7MW
Historie projektu 05/2005 – creation of information centre
Historie projektu 02/2007 – biomass straw boiler 5 MW
Historie projektu straw handling
Historie projektu Total capacity 37,4 MWt Total capacity 1,27 MWe 5MW Vjezd do areálu 3MW 6MW MT 140 MT 132 ORC 1 MW 7MW 5MW
Historie projektu - overview 04/ installation ORC turbíne 1 MWe 05/2005 – information centre 12/2000 – brown coal boiler K13 10/ gas-fired boilers 2 x 6 MWt 01/2005 – biomass boiler 7 MWt (including ORC) 01/2002 – gas-fired CHP boilers TEDOM 140, TEDOM /2002 – biomass boiler 3 MWt 10/2001 – gas-fired boilers 2 x 5 MWt 02/2007 – straw boiler 5 MWt 06/2005 – official opening ORC 05/2005 – heat exchanger 1800 m3
Biomass used Sawdust Bark Chips Straw
Reduction CO 2 Rok Replacement gas Avoided CH4 Emission forest Reduction due to power production Total CO 2 reduction
Increased biomass usage
Next steps 08/2007 – straw boiler VESKO-S 5,0 MW – Reconstruction South plant in Trebici To be continued
Next presentation Best practice - CHP