AWAST PROGRESS MEETING TRONDHEIM JUNE 02 WP 5 BIOLOGICAL TREATMENT LQARS PARTICIPANTS: CEMAGREF TRATOLIXO PERIOD: 1 – 24 (Months)
LQARS PERSONNEL INVOLVED IN AWAST * Delay in admission due to burocratic problems rose by the Portuguese Ministery of Agriculture LQARS CEMAGREF TRATOLIXO
TASKS COMMITTED TO WP5 UNTIL MONTH 24
PLANTS CONSIDERED FOR DATA ACQUISITION GLOBAL LEVEL: -Trajouce -Kirchheim -Bamberg -Riba d’Ave PRE OR POST TREATMENT: -Champagne -Châteauroux BIOLOGICAL PROCESS LEVEL: -Trajouce (C) -Setúbal (C) -Riba d’Ave (C) -Dresden or Barcelona (AD) LQARS CEMAGREF TRATOLIXO
REASONS FOR THE DELAY IN SOME TASKS 11 months delay in contracting one person for AWAST Draining and aeration problems in the Tratolixo composting park from January to April 02 Technical problems to get reliable data due to the high heterogeneity of composting material and conditions
OBJECTIVES LQARS CEMAGREF TRATOLIXO
Procedure for data collection Data collection Optimize BTPs under study Simulate new scenarios DatabaseModels Simulator
LQARS CEMAGREF TRATOLIXO 1.What was done? 2.What is still to be done? 3.When will we finish?
LQARS CEMAGREF TRATOLIXO EVALUATION OF BTPs (Biological Treatment Plants) A.GLOBAL LEVEL (Physico-chemical evaluation) B. COMPOSTING PROCESS LEVEL (Biological evaluation)
LQARS CEMAGREF TRATOLIXO FOR EACH LEVEL: 1. Development of experimental procedure 2. Data acquisition 3. Modelling
LQARS CEMAGREF TRATOLIXO A. GLOBAL LEVEL EVALUATION
LQARS CEMAGREF TRATOLIXO 1. DEVELOPMENT OF EXPERIMENTAL PROCEDURE State: Finished Output: Deliverable DATA ACQUISITION State: In progress Output: Database
LQARS CEMAGREF TRATOLIXO CASE STUDIES STARTED: - Trajouce (Portugal) - all plant - Riba d'Ave (Portugal) - all plant - Kirchheim (Germany) - all plant - Bamberg (Germany) - all plant - Châteauroux (France) - Selective conveyor CASE STUDIES TO BE DONE: - Champagne, St. Malo or Étables (France) - Rotary drum with a good performance - Dresden?; Barcelona? - Anaerobic digestion
LQARS CEMAGREF TRATOLIXOPROCESSES: 1. MT - Mechanical treatment 2. Drum - Rotary drum 3. C - Composting plant 4. AD - Anaerobic digestion plant 5. PT - Post treatment
LQARS CEMAGREF TRATOLIXO ROTARY DRUM EQUIPMENTDONE MATERIAL BRS Riba d’Ave MSW BRS Riba d’Ave MSW BRSFrance* MSW * To be done
LQARS CEMAGREF TRATOLIXO MECHANICAL TREATMENT EQUIPMENTDONE MATERIAL Sieve Trajouce: mm MSW Sieve Trajouce: mm MSW - 80 mm - 80 mm Kirchheim: - 80 mm Biowaste Kirchheim: - 80 mm Biowaste Riba d’Ave: - 25 mm MSW Riba d’Ave: - 25 mm MSW Overband Trajouce MSW Overband Trajouce MSW
LQARS CEMAGREF TRATOLIXO COMPOSTING PLANT EQUIPMENTDONE MATERIAL Koch Trajouce MSW KirchheimBiowaste KirchheimBiowaste Biodegma BambergBiowaste Vinci Riba d’Ave MSW
LQARS CEMAGREF TRATOLIXO ANAEROBIC DIGESTION EQUIPMENTTO BE DONE MATERIAL ???Dresden, Barcelona? Biowaste ???Dresden, Barcelona? Biowaste
LQARS CEMAGREF TRATOLIXO POST TREATMENT EQUIPMENTDONE MATERIAL Sieve Trajouce: - 8x20 – 20x40 mm MSW Kirchheim: - 25 mm Biowaste Kirchheim: - 25 mm Biowaste - 12 mm - 10 mm Riba d’Ave: - 15 mm MSW Bamberg: - 12 mm Biowaste Bamberg: - 12 mm Biowaste Densimetric Trajouce MSW table Riba d’Ave MSW Kirchheim Biowaste Kirchheim Biowaste Selective conveyorChâteauroux Biowaste
LQARS CEMAGREF TRATOLIXO 3. MODELLING State: In progress Output: Software model One model already exists (composting plant of Mont Marsan): - Model of matter: CEMAGREF - Software model: BRGM
LQARS CEMAGREF TRATOLIXO B. COMPOSTING PROCESS EVALUATION
LQARS CEMAGREF TRATOLIXO 1. DEVELOPMENT OF EXPERIMENTAL PROCEDURE State: In progress Output: Deliverable 15 Procedure for the acquisition of the following data: -Temperature -Water content -Volatile solids content -Oxygen concentration in the free air space -Free air spaceX Due: AUGUST
LQARS CEMAGREF TRATOLIXO 2. DATA ACQUISITION CASE STUDIES STARTED: - Trajouce (Portugal) - Riba d'Ave (Portugal) CASE STUDIES TO BE DONE: CASE STUDIES TO BE DONE: - Setúbal (Portugal)
LQARS CEMAGREF TRATOLIXO 3. MODELLING State: In progress Output: Software model r - rate of degradation of volatile solids k - reaction rate constant [VS] t - concentration of volatile solids at time t F(Water) - correction factor for water content F(Oxygen) - correction factor for oxygen concentration F(FAS) - correction factor for free air space
LQARS CEMAGREF TRATOLIXO
USE OF MODELS
OBJECTIVES: LQARS CEMAGREF TRATOLIXO Procedure for data collection Data collection Optimize BTPs under study Simulate new scenarios DatabaseModels Simulator
LQARS CEMAGREF TRATOLIXO USE OF MODELS 1. Waste management systems without a BTP - Help on the decision on whether or not to include a new BTP in the system - Presentation of solution(s) in terms of: -technical aspects (equipments configuration) -costs -maybe a range for product characteristics and plant performance
LQARS CEMAGREF TRATOLIXO USE OF MODELS (cont) 2. Waste management systems with a BTP A. Solution(s) for the inclusion of new equipment -technical aspects (equipments configuration) -costs -maybe a range for product characteristics and plant performance B. Solution(s) for the improvement of the plant without changing equipment configuration -New operating conditions -Prediction of volatile solids degradation
LQARS CEMAGREF TRATOLIXO NEW TIME SCHEDULE FOR WP5
END LQARS CEMAGREF TRATOLIXO
NEXT 6 MONTHS LQARS CEMAGREF TRATOLIXO