WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.

Slides:



Advertisements
Similar presentations
CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
Advertisements

STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
PWI Meeting Kanazawa 25/03/2006 Active Measurement of Mercury’s Plasma, AM 2 P CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire de Physique et.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
Status Reports: Messenger and Dawn S. Joy. MESSENGER It has been previously reported that the MESSENGER project did not plan on archiving any data EXCEPT.
Introducing the INS Master Schedule Wayne Baggett.
CAA PEACE Status Iryna Rozum, Andrew Fazakerley, Natasha Doss, Andrew Lahiff, Yulia Bogdanova, Branislav Mihaljčić & the PEACE ops team MSSL 12 th Cross-Calibration.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
CAA PEACE Status A.N. Fazakerley, I. Rozum, B. Mihaljcic.
1 CAA 2009 Cross Cal 9, Jesus College, Cambridge, UK, March 2009 Caveats, Versions, Quality and Documentation Specification Chris Perry.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
Mullard Space Science Laboratory October 2008 A.N. Fazakerley, I Rozum, C. Anekallu, H. Bacai MSSL-UCL CAA PEACE Team Status.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Laboratoire de Physique des Plasmas C ROSS C ALIBRATION STAFF R EPORT TH M ARCH 2015 L EIDEN Prepared by R. Piberne & R. Katra Laboratoire de Physique.
20th CAA Cross Calibration Göttingen - October 15-16, 2014 Status of CIS Data Archival I. Dandouras, A. Barthe.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
1 CAA 21 th Cross Calibration Meeting, Leiden, th Mar 2015 CAA Cross Cal Meeting Mar 2015 Automated Pipeline Processing.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
Status of EDI Archiving and Calibration Activities March 25-26, 2013 Darmstadt.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
8 th Cross-Calibration Workshop, Kinsale, Ireland, October 20081/14 Draft Replies and Actions to the Recommendations of the Review Panel for Final.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
10 th CAA Cross-calibration meeting, 2nd – 4th November 2009, Paris N. Doss, A. Fazakerley, B. Mihaljčić and I. Rozum UCL Department of Space and Climate.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
WHISPER Cross-caibration activities
Cluster Active Archive
CAA Operational Review 9 Double Star PEACE Team Report
Status Report of EDI on the CAA
Cluster data sets P-A Lindqvist, KTH
16th CAA Cross-calibration Workshop
WHISPER Report Jean Gabriel Trotignon and WHISPER Team
CIS Data Archival Status
10th CAA Operations Review Annual Report of the CIS Experiment
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Cluster Active Archive 1st Operations Review May 16-17, 2006
Annual Report of the DWP Experiment 9th CAA Operations Review
CAA Action Items Investigations PEACE Progress Meeting
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
Presentation transcript:

WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA Cross-Calibration Meeting Obs. de Paris, France 2-4 November A, Avenue de la Recherche Scientifique, Orléans cedex 2, France, tel: (+33/0) , fax: (+33/0) ,

Outlook Team status Production status reprocessing Action items –CC9-AI-3: EDI-FGM-WHISPER –CC9-AI-15: CIS CODIF-PEACE-WHISPER

Team status The CAA Research Associate, G. Facskó is responsible for CAA and Cross Calibration activities with the assistance of the WHISPER Team. Internal WHISPER team: –S. Kougblénou and G. Lointier (WHISPER engineers under CNES contract) –X. Vallières (WHISPER lead engineer – part time)

Production status The density production schedule depends on the mass archive production by CNES (to create CEF files). Current status –Mass archive → delivered → March 2008/ready until June –Density archive → delivered → June 2008 From May 2008 only density from WHISPER low-cut off can be produced, EFW data being unavailable EFW is necessary for method 11E (low-cut off+EFW) and method 21E (EFW recalibration) New/improved Density Files will be delivered whenever EFW data are available

Production status (cont’d) Next deadline: February 2010 Current schedule –Mass archive → June 2009 –Density archive → End of 2008 Estimated delay –mass archive: 12 months to be produced by CNES in 4 months (no significant delay foreseen) –Density (CEF file production depends on mass archive) → 6 months to be produced (EFW?)

Several problems encountered with some of the mass archive files –Bug in the archive software corresponding to a particular case ( SC2) of a frequency table non entirely swept : bug corrected and file re- delivered – errors in the « Spectral_Frequencies » parameter (PR09-WHI16) –« Compressed_Data_size » parameter not consistent with header description Reprocessing software has been developed: reprocessing will be done at CNES not before Feb 2010, due to planning constraints. Density files to be reprocessed (PR09-WHI14), ongoing. Reprocessing

CC9-AI-15: WHISPER-CIS-PEACE comparison to study: (a) , 3-4 UT, and to find the reason for density drops in the automated pipeline routine, and (b) , UT, and to find if any resonances/cut-offs can be observed for the density determination

OR4-R12 PR09-ALL01 PR09-ALL03 PR09-ALL05 PR09-ALL06 PR09-ALL12 PR09-ALL13 PR09-WHI01 PR09-WHI02 PR09-WHI03 PR09-WHI04 PR09-WHI06 PR09-WHI09 PR09-WHI10 PR09-WHI11 PR09-WHI12 PR09-WHI18 UG, CR, ICD will be completed and improved following recommendations AIs relative to documentation (or partially)

PR09-ALL02:For nearly all datasets there is a reference to dataset caveats (C*_CQ_*) but in nearly all cases no such datasets exist… R: WHISPER will provide dataset caveats. Draft has been sent for approval.

PR09-WHI05 WHISPER calibration softwares use 100m antenna effective length instead of the 88m physical length that is used by all other WEC experiments… R: Internal WHISPER calibration uses a 100m tip-to-tip antenna length whereas CAA data products actually use a 88m tip-to-tip antenna length for calibration, as all other WEC instruments. The user guide contains an error concerning the CAA products (except for PPDBs where the antenna length used is 100m). The user guide will be updated and this length will be documented in the PPDB CEF headers.

CC9-AI-3 to produce the complete set of electron gyro-frequenies for years 2004 and beyond R: gyro-frequencies for 2005 plasmaspheric passes have been delivered very recently to the FGM team is ready to be delivered. Results to be analyzed.

CC9-AI-15: WHISPER-CIS-PEACE comparison to study: (a) , 3-4 UT, and to find the reason for density drops in the automated pipeline routine, and (b) , UT, and to find if any resonances/cut-offs can be observed for the density determination Already presented (previous talk)

Conclusion AIs are on the way to be covered Many of them are related to documentation Mass archives reprocessing needed Density archives reprocessing needed (Quality  Contrast) Next delivery deadline (Feb. 2010): no delay Still open AIs

Thank you for your attention!