Status Michael Moll CERN PH-DT Contents: WP8 – Task overview Status of tasks Status of Milestones and Deliverables AIDA 1 st Annual Meeting, DESY, Hamburg.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA H2020 Open Meeting,
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
M.Moll, M.Silari, H.Vincke – 3.April Feedback  In total 134 forms filled:
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
AIDA organization WP1: Project management and communication Laurent Serin, LAL-CNRS (scientific coordinator) Ties Benhke, DESY & Paul Soler, Glasgow university,
14.4. Readout systems for innovative calorimeters
Test beam results of MCz-Si detectors
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
WP8 – Improvement and equipment of irradiation beam lines
Towards a Unified Environmental Monitoring,
The Beam Test at Fermilab:
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
Irradiation Facilities Questionnaire
IRRAD Facility Infrastructure Upgrade
CERN Testbeam facilities
Presentation transcript:

Status Michael Moll CERN PH-DT Contents: WP8 – Task overview Status of tasks Status of Milestones and Deliverables AIDA 1 st Annual Meeting, DESY, Hamburg – WP8 – Improvement and equipment of irradiation and test beam lines

M.Moll – AIDA 1 st Annual Meeting, DESY – WP 8 – Task overview WP8: Improvement and equipment of irradiation beam lines 8.1.Coordination and CommunicationCo-leader: Giovanni Mazzitelli (INFN LNF) Michael Moll (CERN) 8.2.Test beams infrastructure at CERN and Frascati CERN Frascati Leader: Ilias Efthymiopoulos (CERN) Leader: Giovanni Mazitelli (INFN-LNF) 8.3.Upgrade of PS proton and neutron irradiation facilities at CERN Improvement of existing irradiation facilities and evaluation of upgrade proposals Common infrastructure for the facilities Leader: Michael Moll (CERN) 8.4.Qualification of components and common database Review existing data and experience from LHC, define test program Define test procedures and conduct tests on selected components Set-up and publish a WEB database compiling the information above Leader: Simon Canfer (STFC) 8.5.General infrastructure for test beam and irradiation lines Commission and operate beam tracking telescope TASD and MIND GIF++ user infrastructure Leader: Ingrid Gregor (DESY) Leader: Paul Soler (STFC) Leader: Davide Boscherini (INFN Bologna) 8.6.Coordination of combined beam tests and common DAQ Common test beam experiments at CERN and DESY Common DAQ Leader: Ties Behnke (DESY) Leader: David Cussans (University of Bristol)

M.Moll – AIDA 1 st Annual Meeting, DESY – Low energy test beam at CERN (8.2.1) Task: Study possibility to produce beam line delivering low energy electrons, muons and hadrons for neutrino experiment prototypes Status: –Technical Student about to start to work on beam line simulation –MS27 “Specifications for beam line fixed” reached and documented in AIDA MS-27 D8.3 Design study on low energy beamline: Design and implementation study on a low energy beam to the range of 1 (or possibly less) to 10 GeV [month 26] March 2013 Ilias Efthymiopoulos CERN; presented by P.Soler (Glasgow ) Low energy particle beams: electrons, muons and hadrons (pions and protons) GeV/c (up to 9GeV/c ?) Large aperture magnet like the MORPURGO magnet (dipole field of 1.6T) presently installed in North Area. Particle flux (muons) of 1-2 kHz for each given momentum, in spot size of 10x10 cm 2

M.Moll – AIDA 1 st Annual Meeting, DESY – Test beam infrastructure in Frascati LNF, Ferrara & Perugia INFN structure and University of Bergen; Leader: G.Mazzitelli (LNF)

M.Moll – AIDA 1 st Annual Meeting, DESY – Test beam infrastructure in Frascati LNF, Ferrara & Perugia INFN structure and University of Bergen; Leader: G.Mazzitelli (LNF)

M.Moll – AIDA 1 st Annual Meeting, DESY – Test beam infrastructure in Frascati LNF, Ferrara & Perugia INFN structure and University of Bergen; Leader: G.Mazzitelli (LNF)

M.Moll – AIDA 1 st Annual Meeting, DESY – Layout studies using the DIRAC experimental area Collaborative work: CERN EN & PH; AIDA & R2E M. Brugger, M. Calviani, L. Gatignon, M. Glaser, E. Lebbos, M. Moll, F.Ravotti Configuration of Mixed Field Area Layout IRRAD Tables System Proton Facility - main user community: LHC Experiments -Irradiation tables -Cold boxes -Shuttle system Mixed Field Facility multiple user communities: LHC machine LHC Experiments, Dosimetry (RP), MC benchmarking rail system on floor for heavy material, shuttle system or small rail system on ceiling (?)

M.Moll – AIDA 1 st Annual Meeting, DESY – Fluka calculations (Mixed Field Area) Documented in AIDA-NOTE “East Area Irradiation Test Facility; Preliminary FLUKA calculations” E.Lebbos, M. Brugger, M. Calviani, L. Gatignon, M. Glaser, M. Moll Configuration of Mixed Field Area High Energy Hadron flux /cm2/day Ambient residual dose rate (after 6 months at 2.2e10 p/s) Prompt dose rate micro Sv/h data for 2.2×10 10 p/s

M.Moll – AIDA 1 st Annual Meeting, DESY – Air activation (worst case scenario) Loss Rate Ejection 2.20E+10 pps Volume target area 5.29E+07 cm3 Leak Rate 0m3/h Irradiation time1.58E+07s (6 months) the following parameters: and this area only: Without intermediate target (i.e. proton beam directly on the production target) Assuming: Conclusion: air activation is not an issue Simulations by E.Lebbos (CERN)

M.Moll – AIDA 1 st Annual Meeting, DESY – Irradiation Tables and Cold Boxes CERN, Liverpool, Sheffield, Queen Marry University; presented by Hector Marin-Reyes Status 1 Box at CERN installed =ok 1 Box at QMUL testing 1 Box at Sheffield prototype First production box at QMUL John Morris QMUL Chilled N2 circulated by AC powered fans in thermally insulating box through HEX cooled by Glycol. All materials and components are radiation hard Final Fan and Heat Exchange Mounting (Sheffield) N2N2 Fan + HEX in test thermal box

M.Moll – AIDA 1 st Annual Meeting, DESY – Fluence monitoring system University of Vilnius, Lithuania Monitoring based on carrier lifetime measurement in silicon by microwave absorption probed photoconductivity transients Prototype instrument designed and build Covering a wide dynamic range Test: Measurement works even if silicon samples are packaged in plastic bags Next step: Perform a measurements at CERN v c v c c MW cw radiation c excitation recombination

M.Moll – AIDA 1 st Annual Meeting, DESY – Participants: INFN (MI, PG,PI), STFC-RAL, UNIGE, ETHZ (Leader: Simon Canfer, STFC) Sub-task:1. Review existing data and experience from LHC, define test programme 2. Define test procedures and conduct tests on selected materials & components 3. Set-up and publish a WEB database compiling the information above Activities/Achievements: - Formulated and addressed letter to community - So far: 38 contacts established - Literature review in progress - Specification and software platform for Online Database under discussion Input from community welcome: Data (publications, reports,..), interesting materials, comments & suggestions regarding database format, … 2 milestones and 2 deliverables Task 8.4: Qualification of components and common database MS30Definition of test procedure and specification m20 Sept.2012 Common agreement of how tests for materials will be conducted and which components to test (Task 8.4) MS32First test results on selected components m26 March 2013 Intermediate result with respect to D8.7 (Task 8.4) D8.1 Experience at LHC and definition of test programme: Based on the experience and expectations for the LHC test programme is defined and described in a document. [month 12] Jan Task 8.4 Delayed!! D8.7 Populated data base of components qualification: The materials and components database is online and populated with data. [month 46] Nov Task

M.Moll – AIDA 1 st Annual Meeting, DESY –  Test beam activity: Measurement of muon charge in MIND Measurement of electron charge in TASD Sub-task Leader:Paul Soler (STFC) Participants: Geneva University, STFC, UNISofia, IFIC, Warwick, Brunel, INRNE Deliverables: A feasibility study of future neutrino detectors Prototype design, construction, installation and performance test of –TASD: Totally Active Sintillating Detector –MIND: Magnetised Iron Neutrino Detector Task 8.5: General infrastructure for test beam and irradiation lines TASD and MIND

M.Moll – AIDA 1 st Annual Meeting, DESY – TASD and MIND detectors Presentation: Etam.Noah Next:

M.Moll – AIDA 1 st Annual Meeting, DESY – Sub-task Leader:Davide Boscherini (INFN Bologna) Participants:Bulgaria: INRNE; Greece: NTUA, AUTh, Demokritos, NCUA; Israel: Weizmann, Technion; Italy: INFN-Bari, -Bologna, -LNF, -Naples, -Rome2 Deliverable: Infrastructure for the GIF++ Facility Needed: Construction of GIF++ Facility !! (SPS H4 beamline) Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure 15 Presentation: G.Mikenberg, Weizmann

M.Moll – AIDA 1 st Annual Meeting, DESY – GIF++ Specifications Source – 137 Cs, ~7-10 TBq –Up to ~2 Gy/h at a distance of 50 cm –662 keV photons –30 y isotope half-life Particle Beam –EHN1 location in the SPS H4 beam –100 GeV muons –10 4 particles per spill traversing 10x10 cm 2 –available ~6-8 weeks/y (in 2-week periods) Max. expected doses at sLHC Equivalent time at GIF++ (~ 50 cm from source) Si-trackers: ~ MGy/y>> years Calorimeters: ~ 20 kGy/y< 1 year Muon systems: ~ 0.1 Gy/y~ minutes Lateral view of Source and Beam Top view of Source and Beam

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items:  Precise muon tracking set-up  Large area cosmic ray set-up  Detector Control System  DAQ  System for active gamma dose measurements  System of environmental sensors Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure 17 Presentation: G.Mikenberg

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items: Precise muon tracking set-up (TGCs) Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure Presentation: G.Mikenberg, Weizmann Angular resolution 0.43/√2=0.3mRad Position resolution 0.117/√2=0.082mm 2 Quadruplets were constructed (60X40cm²) with strip, wires and pads in each gap Testbeam at CERN (H8): The detectors to be used as a position monitor system for GIF++ have been constructed. Their expected angular and position resolution has been confirmed in test beam. The electronics to equipped the full detectors are being developed.

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items: Large area cosmic ray setup Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure Presentation: A.Polini, INFN Bologna A first design of a Cosmic Ray tracking trigger is available G. Aielli (Univ. and INFN Rome 2)

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items: Large area cosmic ray setup Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure Presentation: A.Polini, INFN Bologna A first design of a Cosmic Ray tracking trigger is available G. Aielli (Univ. and INFN Rome 2)

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items: Large area cosmic ray setup Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure Presentation: A.Polini, INFN Bologna A first design of a Cosmic Ray tracking trigger is available G. Aielli (Univ. and INFN Rome 2)

M.Moll – AIDA 1 st Annual Meeting, DESY – Project items: System for Gamma Dose measurement Task 8.5: General infrastructure for test beam and irradiation lines GIF++ user infrastructure 22 Presentation: Plamen Iaydjiev, INRNE, Sofia, Bulgaria Use of RADMON boards to monitor integrated dose

M.Moll – AIDA 1 st Annual Meeting, DESY – Coordination and support of common test beam experiments at DESY Test beam support was delivered (see e.g. test beam use in WP9) DESY EDMS development presented here as major part of –EDMS - Engineering Data Management System is a framework which provides functionality for purposes as: Document Management, 3D CAD Data Management Configuration, Version and Change Management Workflow Management ! Visualization and Digital Mock-up AIM within AIDA: Provide a central depository for the test-beam infrastructure with a focus on LC related tasks –DESY test beam infrastructure –CERN test beam infrastructure Approach –Step 1: conceive and test the system, develop on the specifications (almost finished) –Step 2: setup a coherent system for AIDA (including CERN) (next step) Ties Behnke and Aura Rosca; DESY

M.Moll – AIDA 1 st Annual Meeting, DESY – Coordination and support of common test beam experiments at DESY Example: TDD – Technical Design Documentation Ties Behnke and Aura Rosca; DESY Work Breakdown Structure Nodes (WBS) –contains not only physical components, but also tasks like „Project Management“ –quality controlled (new nodes and documents to be approved by managment)

M.Moll – AIDA 1 st Annual Meeting, DESY – Coordination and support of common test beam experiments at CERN Test beam support was delivered (see e.g. test beam use in WP9) –Main support directed towards test beams for calorimeter (see WP9.5) –Upcoming activity: Database (à la EDMS) for technical drawings (Fully DESY EDMS compatible) Erik van der Kraaij, CERN

M.Moll – AIDA 1 st Annual Meeting, DESY – Common DAQ (Close link to WP9) David Cussans (University of Bristol) taking over from Emlyn Corrin (Geneva) TPC-DAQ developments (design studies) at IIHE-ULB (Brussels) were presented by Yifan Yang with future work plans (to be integrated into WP ) Discussions on specifications for the DAQ system and gathering of institutes that are interested to contribute –Next steps: Establish Working Group Fix of specification in a document Define responsibilities David Cussans (University of Bristol) D8.8 DAQ performance and test beam utilization: Report on the performances and use of the integrated DAQ setup, and of the common test beam facilities at DESY and CERN [month 46] Nov Task 8.6 1&2 MS34Test beam, EDMS and DAQ commissioning DESY (9)m36 Jan.2014 Intermediate stage for deliverable D8.8 (Task &2) D8.2 Publication of specification documents for the DAQ and for the central documentation facilities: Description of common infrastructures and interfaces for the linear collider test beams. [month 20] Sept Task &2 see also WP9!

M.Moll – AIDA 1 st Annual Meeting, DESY – WP8 milestones MS27Specification for beam line fixed CERN (1)m12 Jan 2012 Final specification for the design study in task 8.2. (Task 8.2.1) o.k. MS28Design of TASD and MINDSTFC (31)m20 Sept.2012 Design for deliverable D8.11 (Task 8.5.2) MS29Design of GIF++ infrastructure INFN (18)m20 Sept.2012 Detailed design ready for the cosmic ray tracker, the radiation measurement facility and the DCS (Task 8.5.3) MS30Definition of test procedure and specification STFC (31)m20 Sept.2012 Common agreement of how tests for materials will be conducted and which components to test (Task 8.4) MS31Installation of new equipment CERN (1)m26 March 2013 Movable irradiation tables operational (Task 8.3.2) CERN, UK MS32First test results on selected components STFC (31)m26 March 2013 Intermediate result with respect to D8.7 (Task 8.4) MS33Installation of TASD and MIND STFC (31)m36 Jan.2014 Installation at CERN for deliverable D8.11 completed (Task 8.5.2) MS34Test beam, EDMS and DAQ commissioning DESY (9)m36 Jan.2014 Intermediate stage for deliverable D8.8 (Task &2) MS35Installation of infrastructure (34)m37 Feb Cold boxes and Fluence monitoring system operational (Task 8.3.2) CERN, UK, VU MS36Commissioning of tracking telescope DESY (9)m44 Sept.2014 Start of operation of telescope delivered in D8.5 (Task 8.5.1) Coming year

M.Moll – AIDA 1 st Annual Meeting, DESY – WP8 deliverables D8.1 Experience at LHC and definition of test programme: Based on the experience and expectations for the LHC test programme is defined and described in a document. [month 12] Jan Task 8.4 Delayed!! D8.2 Publication of specification documents for the DAQ and for the central documentation facilities: Description of common infrastructures and interfaces for the linear collider test beams. [month 20] Sept Task &2 D8.3 Design study on low energy beamline: Design and implementation study on a low energy beam to the range of 1 (or possibly less) to 10 GeV [month 26] March 2013 Task CERN D8.4 Upgrade scenarios for irradiation lines: Design study on new or upgraded irradiation facilities at CERN based on slow extracted proton beams. Containing a proton and – if feasible – a mixed field irradiation facility. [month 37] Feb Task CERN D8.5 Installation of tracking telescope: The tracking telescope is installed in the beam line and operational. [month 40] May 2014 Task D8.6 Detector and detector control system operational: Cosmic ray tracker including front end electronics, power and gas systems. Detector for radiation measurement. Detector Control System monitoring the tracker working and the environment parameters. [month 44] Sept Task D8.7 Populated data base of components qualification: The materials and components database is online and populated with data. [month 46] Nov Task D8.8 DAQ performance and test beam utilization: Report on the performances and use of the integrated DAQ setup, and of the common test beam facilities at DESY and CERN [month 46] Nov Task 8.6 1&2 D8.9 Performance of beamline and infrastructure: Report on performance of beamline and infrastructure including GEM based beam profile and tracking detector [month 48] January 2015 Task Frascati D8.10 Commissioning of new facility equipment: Report on commissioning of shuttle systems, movable irradiation tables with cold boxes and a fluence monitoring system based on a microwave absorption technique in silicon. [month 48] January 2015 Task CERN, UK, VU D8.11 Infrastructure performance and utilization: TASD and MIND are constructed and tested for their performance. [month 48] Jan Task Coming year