CALIFES and Two-Beam Module Status W. Farabolini on behalf of all the CALIFES beam users 01/121/2015CLIC Project Meeting #231.

Slides:



Advertisements
Similar presentations
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Advertisements

Bunch Length Measurements at the Swiss Light Source (SLS) Linac at the PSI using Electro-Optical Sampling A.Winter, Aachen University and DESY Miniworkshop.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Collimator BPM electronics – Results from the lab, SPS and LHC
Tests of spectrometer screens Introduction Layout Procedure Results Conclusions L. Deacon, B. Biskup, S. Mazzoni, M.Wing et. al. AWAKE collaboration meeting,
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
Beam Test status and Plans of the ILC Main LINAC BPM
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Principals of fast injection and extraction R. Apsimon.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Recent results from CTF3 Piotr Skowroński for the CTF3 Collaboration 22 January 2016 CLIC Workshop
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
CLIC Drive beam BPM Requirements and cost estimate.
What did we learn from TTF1 FEL? P. Castro (DESY).
X-band Based FEL proposal
CTF3 Brief Summary W. Farabolini on behalf of the CTF3 team W. Farabolini - CLIC Project Meeting #19119 Dec
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Fibre Beam Loss Monitoring system development BI - day 10 March 2016 M. Kastriotou, E. Nebot del Busto M. Boland, F. S. Domingues Sousa, E. Effinger, E.B.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
CALIFES 2015 run preliminary results
First Year of Operation at the Two-beam Test Stand
An X-band system for phase space linearisation on CLARA
CLIC Workshop 2016: Main Beam Cavity BPM
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
Coupling Correction at the Australian Synchrotron
OTR based measurements for ELI-NP Gamma Beam Source
Update of CLIC accelerating structure design
WG2 Summary: Diagnostics, measurements, and commissioning
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
LCLS bunch length monitor utilizing coherent radiation
CLIC Feasibility Demonstration at CTF3
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

CALIFES and Two-Beam Module Status W. Farabolini on behalf of all the CALIFES beam users 01/121/2015CLIC Project Meeting #231

Studies repartition with CALIFES and TBM Test Beam Module : 21 daysW. Farabolini Wake Field Monitors :48 daysR. Lillestol et al. High Resolution Cavity BPMs :18 daysJ. Towler Interferometric OTR :13 daysR. Kieffer Beam alignment in Quadrupoles : 6 days N. Aftab, S. Javeed Califes Cavity BPMs calibration : 6 daysN. Aftab, S. Javeed Beam Loss Monitor: 1 dayM. Kastriotou Girders positions control : 5 days V. Rude, M. Duquenne Irradiation Test Bench :11 days R. Alia et al. Strip Line BPMs A. Morell Miscellaneous :30 days (beam preparation, development, studies non referenced in the log-book…) Total: 159 days (users x days) Klystron MKS30 for PHIN :5 weeks Misc. TBM OTRI HR BPM WFM ITB 01/121/2015CLIC Project Meeting #232

Shutdown Periods and New Installations Second Super-structure on the TBM  Survey of the whole line  In situ RF measure with network analyser  RF power chain calibrations 3 High Resolution Cavity BPMs on motorized stages Irradiation Test Bench (E. Del Busto) Rare days of beam unavailability (Laser Pulse Picker power supply, Klystron focalisation coil power supply) Nearly no klystron trips ( working hours) 17 Dec – 9 Mar /121/2015CLIC Project Meeting #233

Some Laser stability concerns Laser Power and Beam Charge drift Beam position and charge jitter Double head Laser and Beam shape Maintenance of the Laser Lab. Air conditioning system this week (measured temperature fluctuation: 5 deg C) Some problems with laser synchronisation and phase jump (LLRF team knows how to fix) 40 min. Laser profile Beam profile Laser/Beam position correlations 01/121/2015CLIC Project Meeting #234

Test Beam Module (TBM) control PETS 2PETS Tank ACS4 PETS 1 ACS3ACS2ACS1 DB PB  A  A  43  21  31 11 Output powers Generated powers 01/121/2015CLIC Project Meeting #235

Principle of the Phase check PBDBCorrect if: Phase error without recirculation Phase error with recirculation  21 PB  21 DB Equal-6 o -4 o No control  43 PB  43 DB Equal-13 o -12 o No control  31 PB  31 DB Equal-31 o -6 o Priming control  1 PB  1 DB At 180 o 0 o CALIFES phase control RF distribution with WG spacersOutput phases from structures 01/121/2015CLIC Project Meeting #236

Power measures problem Very good agreement between Diodes and I/Q power But a strong discrepancy between ACS1 and ACS2 This discrepancy was not present up to the 27 April but with lower power (non linearity ?) 01/121/2015CLIC Project Meeting #237

Energy gain performance Without Priming With Priming Energy gain = 55 MeV Power In / Power Out = 2.44 (S 12 = 0.64) E gain [MeV] = 100/sqrt(42.6)*0.23 * sqrt(P In [MW]) = coef * sqrt(P In [MW]) E gain = coef* ((ACS4 in )^.5 + (ACS3 in )^.5 + (ACS2 in )^.5 +(2.65 * ACS1 in )^.5 ) = 21.6 MeV E gain = = 49.2 MeV 01/121/2015CLIC Project Meeting #238

Reflected Power from structures 180 superposed RF pulses (1 BD in ACS1) Some reflected power by ACS4 after 110 ns (last cells) Not OK OK Not OK OK Two-Beam Module in CLEX RF measurements of the SAS N3-N4 Andrey Olyunin Dmitry Gudkov Problem already known from the installation 01/121/2015CLIC Project Meeting #239

Vacuum activity during RF conditioning E. Paju Vacuum scheme to be actualized 01/121/2015CLIC Project Meeting #2310

Wake Fields Monitors The present installation (16 waveguides + filters) has been developed for the previous TD24. The location of the WFM pick-up have changed (2 nd cell instead of central cell) The TE-like and TM-like frequencies are now different (27.3 GHz instead of 24 GHz, and 16.5 GHz instead of 18 GHz) Some problems with the log-detector crates (too low bandwidth -> short the final amplifier) 01/121/2015CLIC Project Meeting #2311 Connection by waveguide to the gallery waveguide filters and log-detector crate

Noise problem from the Drive Beam TE mode TM mode TE mode Noise in TM mode when DB is in TBL Now solved by better grounding Noise in TM and TE modes when DB is in TBM Due to DB current or RF Power ? Still under investigation Necessity to have a clear picture of the useful bandwidth 01/121/2015CLIC Project Meeting #2312

Beam Horizontal position scan data Regular Horizontal beam scan Vertical beam jitter Consistent Horizontal WFM signals Good structure alignment Vertical beam jitter visible on WFM signals 01/121/2015CLIC Project Meeting #2313

WFM resolution R. Lillestol 01/121/2015CLIC Project Meeting #2314

Evolution of the WFM pulse shapes with number of bunches in train R. Lillestol 01/121/2015CLIC Project Meeting #2315

Impact of drive beam noise on the WFM TE signals R. Lillestol 01/121/2015CLIC Project Meeting #2316

Correlation between Califes BPMs Signals Horizontal Scan Vertical Scan N. Aftab S. Javeed 01/121/2015CLIC Project Meeting #2317

High Resolution Cavity BPMs BPMs are installed on vertical and horizontal stages:  Perfect alignment on the beam line  Calibration signal vs. position 3 Cavities for dipole mode + 1 for beam current measurement (normalisation)  Beam jitter free measures Many data taken but still to be processed to derive the resolution The 3 down mixing electronics have been destroyed by the drive beam losses.  Reparation on going and protective measures to be taken J. Towler 01/121/2015CLIC Project Meeting #2318

Optical Transition Radiation Interference R. Kieffer 01/121/2015CLIC Project Meeting #2319

Optical Transition Radiation Interference Experimental measurement of the shadowing of the electromagnetic field. R. Kieffer 01/121/2015CLIC Project Meeting #2320

Angular observation nm Red Filter OTRI Vertical Polarization R. Kieffer 01/121/2015CLIC Project Meeting #2321

Angular Distance Between peaks Vertical Polarization R. Kieffer 01/121/2015CLIC Project Meeting #2322

CLIC Beam Loss Monitor studies with Califes Measurements of BLM so-called “crosstalk” on the TBM o “Crosstalk” : losses of one beam line detected by the BLMs protecting the other one → limitations in sensitivity of CLIC BLMs Examined detectors: Little Ionisation Chambers (LIC) Optical fibre BLMs (OBLM) → Multi-Mode optical fibres coupled to photosensors ( pixel Multi Pixel Photon Counters) MB2 LICs 5 cm downstream of the AS7 m long Ø365 μm SiO 2 optical fibre, 4 m upstream the TBM DB 2 LICs 10 cm downstream of quads5 m long Ø200 μm SiO 2 optical fibre, 2 m upstream the TBM M. Kastriotou 01/121/2015CLIC Project Meeting #2323

Measurements during Califes nominal operation CLIC Project Meeting #23 Sensitivity scan with bunches, good beam transmission LICs insensitive in Califes losses → Measurements with optical fibre BLMs Beam charge calculated from the BPMs. High sensitivity: detection of the electron gun dark current and Califes beam losses. MB OBLM Califes beam losses measured by the MB OBLM Califes beam losses measured by the DB OBLM M. Kastriotou 01/121/201524

Measurements for a loss scenario (with LICs) Insertion of OTR screen to the beam Optical fibre BLM photosensor saturation → LICs used for measurements Future steps at Califes: Repeat the measurements with different setups to avoid saturation Crosstalk to DB estimated at 0.6% of the signal measured from the MB BLMs. M. Kastriotou 01/121/2015CLIC Project Meeting #2325

Beam for irradiation test bench Dark current from gun is used for irradiation  Stability, low bunch charge (< 0.2 pc), long train 600 ns FWHM: 1800 bunches, higher emittance  Rep. rate 5 Hz, 0.3 nC per pulse, 16 x 21 mm 2 Gaussian size downstream to scattering screen Beam transverse profile Dark current time profile ESA Monitor 4 memory chips 01/121/2015CLIC Project Meeting # ns

General Context The purpose of the 2015 R2E tests at CALIFES is that of validating the beamline for radiation effect with high energy electrons Main application: ESA JUICE mission to the Jovian system where high energy electrons are trapped in the magnetic field Other applications: Earth electron belt (though lower energies apply) High-energy accelerator environment (electrons present but typically dominated by hadrons) Main assets of CALIFES beamline for radiation tests: High energy (important for Single Event Effects) High intensity (important for total dose and displacement damage studies) Rubén García Alía (EN/STI/EET) Maris Tali (EN/STI/EET) Markus Brugger (EN/STI/EET) Salvatore Danzeca (EN/STI/ECE) Matteo Brucoli (EN/STI/ECE) 01/121/2015CLIC Project Meeting #2327

Electron induced SEUs 200 MeV electrons were found capable of inducing SEUs even in a relatively old technology (state-of-the-art electronics is expected to be much more sensitive) Error probability 4-5 orders of magnitude lower than for high energy protons and expected to be induce via electronuclear interactions Measured SEU probability in the order of magnitude of simulated results with FLUKA, but subject to a large uncertainty due to relatively small beam size and lack of dedicated dosimetry R. G. Alia 01/121/2015CLIC Project Meeting #2328

Dose Rate The dose rate was measured using the RadFET detectors and showed a linear response with time for two different test frequencies An independent measurement of the electron fluence at the DUT location is needed in order to calibrate the detectors for 200 MeV electrons R. G. Alia 01/121/2015CLIC Project Meeting #2329

Gold activation measurement 196 Au activity can be correlated with the electron fluence through FLUKA simulations Test will yield an independent measurement of the electron intensity at the DUT location which can then be correlated to the beam current value measured upstream Useful as a cross-check but not practical as long term solution R. G. Alia 01/121/2015CLIC Project Meeting #2330

Conclusions Promising first SEU and TID results confirm CALIFES’ potential for radiation effects testing Strong interest by ESA who would (if possible) like to perform measurements in 2016 for three identified nanoscale transistor technologies and through a subcontractor However, several key points need to be addressed before the facility can be operational for standard radiation effects testing: Beam size would need to be increased to (ideally) 5 x 5 cm 2 with a homogeneity of ~20% A dedicated dosimetry system would need to be installed in the DUT position (example: pencil shape ionization chamber placed instead of the DUT and calibrated against a linear beam intensity indicator permanently available – e.g. beam current monitor) R. G. Alia 01/121/2015CLIC Project Meeting #2331

Terminated Stripline BPM for CLIC TBM 32 Two units installed: CM.BPL0645, CM.BPL0685 New FESA class developed for BPM control and data acquisition (TBM and TBL): CLEXBPM. A. B. Morell 01/121/2015CLIC Project Meeting #23

Terminated Stripline BPM for CLIC TBM Parameter Shorted BPM Terminated BPM Stripline length 25 mm37.5 mm Angular coverage 12.5% (45°)5.55% (20°) Electrode thickness 3.1 mm1 mm Outer radius 17 mm13.54 mm Ch. Impedance 37 Ω50 Ω Duct aperture 23 mm Resolution 2 μm Accuracy 20 μm Time Resolution 10 ns D. Gudkov BE-RF dB A. B. Morell 01/121/2015CLIC Project Meeting #23

Beam tests for 2015/2016 Linearity/Sensitivity  Beam scan in H, V planes for two cases: Low PETS power Highest possible PETS power (max. achieved ~ 60 MW) Resolution  Synchronous acquisition of as many consecutive shots as possible for SVD analysis. 34 A. B. Morell 01/121/2015CLIC Project Meeting #23

Noise issues Unwanted noise observed in the absence of beam / CAL inputs  up to ~100 ADC counts ~25mV  Unacceptable Not present when cabling is removed Uncorrelated component  Ground loop Correlated component  ~230 kHz interference (switched power supply? ) Mitigation strategies being currently tested: Transformers Inductive common mode chokes Capacitive DC blocks 35 A. B. Morell 01/121/2015CLIC Project Meeting #23

Conclusions A large user’s community is conducting many challenging experiments in the CTF3/CLEX facility using the CALIFES beam and also the Drive beam. Despite the limited human resources we have been able to provide to most of them reliable beams and support all along the year. We are still keen to receive new experimental proposals. Many thanks to all the users who have provided me with many (too many ?) slides. Sorry for the cut. 01/121/2015CLIC Project Meeting #2336