Flare mini review- part 2 April 19, 2005 Petros Rapidis1 We wish to continue and bring to completion the current effort of producing a credible design.

Slides:



Advertisements
Similar presentations
SNOLAB and EXO David Sinclair SNOLAB Workshop August 2005.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
CERN LBNE Test Experiment. Plan view of Bat
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
David Finley / LArTPC Group Meeting / June 13, Fermilab Slide 1 LArTPC Detector Costs Context History Next (perhaps) steps.
David Finley / Liquid Argon TPC Workshop / July 11, Yale University Slide 1 The Ultimate Step The Penultimate Step Costs and NuSAG Some On-Going.
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Liquid Argon is a bright Scintillator (40,000 photons/MeV) and allows free electrons to drift meters under electric fields of 0.5 kV/cm. Liquid Argon presents.
Detector R&D Opportunities at Fermilab: a Must or a May Do? Adam Para.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Seattle / David Finley, Fermilab / September 21, 2006 Slide 1 Liquid Argon TPC Activities at Fermilab etc Big Tank Paradigms Technical Progress.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
Hans Jostlein, May 24, Large Liquid Argon Purity Demonstration— Phase I: Gas Flushing -What -Why ? -How ? -When ? -Define “Success”
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
TPC Design Concept: From MicroBooNE to LAr20
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
Experimental and Numerical studies on Bulk Micromegas SINP group in RD51 Applied Nuclear Physics Division Saha Institute of Nuclear Physics Kolkata, West.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon R & D work at Fermilab neutrinos WIMPS.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
David Finley / LongBaseLine Study / June 27, Fermilab Slide 1 Ultimate Step and Penultimate Step LArTPC Costing Methodology Ongoing LArTPC R&D Summary.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
S. Pordes - FNAL May 13th Purity Monitor - Description and Experience at Fermilab Production of Clean Argon - Description of Filtering System and.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
November 4, 2004Carl Bromberg, FNAL LAr Exp. Workshop Nov. 4-6, Liquid argon as an active medium Carl Bromberg Michigan State University & Fermilab.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Large Wire Chambers Or “To boldly go where nobody has gone before” –Frame chambers (say up to 5x5 meters) usually made on winding machines –Cylindrical.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
Thorsten Lux. Charged particles X-ray (UV) Photons Cathode Anode Amplification Provides: xy position Energy (z position) e- CsI coating 2 Gas (Mixture)
5/13/11 FCPA Mini-RetreatDarkSide - S.Pordes1 DarkSide 10 kg Prototype at Princeton Distillation Column for Depleted Argon at Fermilab DarkSide 50 at Gran.
Liquid Argon Detector Developments at Ciemat. Participation of Ciemat at the ArDM experiment in Canfranc. Luciano Romero Manuel Daniel María de Prado.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
Fred Hartjes 1 RD51 mini week, CERN, June 14, 2012 Implementing GridPix in a Darwin detector Matteo Alfonsi, Niels van Bakel, Patrick Decowski, Harry van.
Daniel H. Gutiérrez Velázquez Fermi National Accelerator Laboratory PPD – Neutrino MicroBooNE.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
A. Badertscher, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P
Presentation transcript:

Flare mini review- part 2 April 19, 2005 Petros Rapidis1 We wish to continue and bring to completion the current effort of producing a credible design document in a timely manner. We are thankful for the engineering effort devoted to this to date and want to convince you that it should continue at an increased pace.

Flare mini review- part 2 April 19, 2005 Petros Rapidis2 Costs as of LOI and as of now Site and site infrastructure costs are not yet included

Flare mini review- part 2 April 19, 2005 Petros Rapidis3 Request for manpower for preparation of a design report has been submitted Included are : Tank analysis, including truss design, roof, chimneys, and thermal and mechanical aspects of cooldown, industrial safety code requirements. Argon supply, delivery, and purification, condensers and cryogenic systems. HV and HV field cage system. Wire chamber construction and signal feedthroughs Electronics design and packaging Data acquisition system Site development E S & H issues Project technical leadership

Flare mini review- part 2 April 19, 2005 Petros Rapidis4 Tasks and manpower needed for preparation of Flare design report Based on document prepared by A. Para in early February 2005 Manpower and materials required for an R&D effort were not included.

Flare mini review- part 2 April 19, 2005 Petros Rapidis5 We have given reports on specific topics and we are focusing on generating a design report with a chosen set of parameters. We are also conducting studies in parallel aimed at optimizing the final design choices.

Flare mini review- part 2 April 19, 2005 Petros Rapidis6 Demonstrate the superior physics performance of this detector Establish the efficiency for electron-neutrino e events as a function of the rejection factor for neutral current events containing a  °. i.e. further MC studies, with a more realistic detector simulation, which will include electronic noise and ionization loss to explore the ultimate limitations of this detector. In addition the development of reconstruction algorithms, and the development of automatic (non-scanning) analysis remain to be developed.

Flare mini review- part 2 April 19, 2005 Petros Rapidis7 Optimization of detector parameters: Stereo angle of induction planes (now set at 30 degrees) Wire plane layout (do we need a 7 th plane for ground?) Field cage layout – how many ribs Variation (tolerances) in wire placement and in cathode plane location (flatness) How do we handle the uninstrumented regions of the wire planes (i.e. density of wires in the unused triangles). Study of signal shapes, including effects of wire and stray capacitances These are simulation studies using tools such as Garfield, Maxwell, … Support from CD and AD will be required for this

Flare mini review- part 2 April 19, 2005 Petros Rapidis8 Technical Studies Goal is to validate claims of ultimate purity to be achieved in a industrially constructed vessel. Study of materials to be used, or encountered: Study of outgassing and contamination of liquid argon. Nickel steel, G-10, PEEK, lake water residue, weld detritus (raw materials) Connectors, pulleys, cables (1200 m 2 !!), instrumentation components Human detritus (hair, skin flakes, fingerprints ) It goes without saying that everything that goes into the detector will have to be demonstrated to be non-contaminating Given the fact that long residence times of humans are envisioned, mostly during the wire-stringing period, one cannot eliminate the possibility of such contaminants. It is also not clear how clean an industrial tank will be at the end of the construction process (which may include a hydrostatic test). We need to establish at which level construction residues and human contaminants present a problem.

Flare mini review- part 2 April 19, 2005 Petros Rapidis9 Study and prototyping of penetrations into the tank : Signal feedthroughs – chimney design HV feedthroughs Instrumentation feedthroughs Temperature, liquid level, pressure, flow (?), electron lifetime (purity monitors) Sampling feedthroughs – to extract gas/liquid for analysis and monitoring. We envision using argon purging around all seals to the extent possible; we will use welded seals to the extent possible.

Flare mini review- part 2 April 19, 2005 Petros Rapidis10 Study and evaluate purification techniques : i.e. adsorbers and such Oxysorb, Engelhard (Trigon) catalysts, NuPure, Air Liquide system There are two approaches here that one may investigate – A turn-key system, such as the one from Air Liquide (or others) requires the capability of testing such a system. A home built system using FNAL procured components involves some R&D We will also need to investigate systems with the capacity of removing large quantities of oxygen to be used in the earlier stages of purification. We are considering using an existing on-site tank (e.g. MP9 tank) to study these issues, in a more ‘realistic’ environment, which will include the possible effects of water cleaning and the introduction of possible contaminants that may be encountered in an industrial setting. (Note that the only large imaging LAr system to date (ICARUS) employed clean room procedures and evacuated their vessel.)

Flare mini review- part 2 April 19, 2005 Petros Rapidis11 Tools of the trade – the purity monitor … Moral of this picture: The purity monitor is a good indicator of performance.

Flare mini review- part 2 April 19, 2005 Petros Rapidis12 Tools of the trade – the purity monitor … Zap with light Cathode (-)Grid (ground) Q a /Q c =exp(-t/  ) V drift = L / t Gas – not liquid ! PAB data ! We need to make this work. We will need many of these ! Anode (+) 19 cm

Flare mini review- part 2 April 19, 2005 Petros Rapidis13 Another tool of the trade would be a (small?) chamber Advantages You see real signals – gain experience, boost morale and establish credibility ! Allows one to study electronics and zero-suppression readout schemes. Disadvantages Requires resources – more about this later

Flare mini review- part 2 April 19, 2005 Petros Rapidis14 Request to PPD for support (March 2005) for PAB activities The PAB setup will be used to gain some experience with the operation of purity monitors, to evaluate oxygen and other impurity absorbers, and to evaluate the properties of materials to be used. The request was for funds and manpower to : Complete and instrument the (first) PAB setup. Continue work with the purity monitor, and build two more such devices. Based on the response to this review we may have to revisit this modest request

Flare mini review- part 2 April 19, 2005 Petros Rapidis15 Setup at PAB – mostly recycled equipment. being built even as we speak !

Flare mini review- part 2 April 19, 2005 Petros Rapidis16 Setup at PAB – mostly recycled equipment. This system will be heavily used. We will need to, at least, duplicate it !

Flare mini review- part 2 April 19, 2005 Petros Rapidis17 Explore techniques to be used for wire chamber stringing and construction Construct small-scale models to try out stringing and tensioning schemes The present scheme involves pulleys and weights Can we string many wires together ? x small number ($) = a big number of $ ! A segue into chamber construction logistics – a major concern that we are beginning to address Explore techniques for cathode plane and HV feedthrough construction Construct small-scale cathode plane models to try out some ideas. Issues – flatness, stiffness, support structures, construction scheme. Build models and test them at full voltage in liquid Argon environment. (note that HV feedthroughs will require full scale prototypes)

Flare mini review- part 2 April 19, 2005 Petros Rapidis18 Understand issues intrinsic to very long wire chambers (~30 meters) Electrostatic stability, Uniformity of wire spacing,Tensioning schemes Construct a full-scale model to try out all aspects of the wire stringing scheme – a tall area would be nice ! Noise issues due to large capacitances (can be simulated) and due to environment (pickup and microphonics – not as easy to simulate)

Flare mini review- part 2 April 19, 2005 Petros Rapidis19 Building prototypes An issue that has been the subject of spirited internal discussions. We are soliciting your advice on this ! a.Small prototypes : 0.1 to 2 cubic meters ( say up to 3 tons Ar) Advantages You see real signals – gain experience, boost morale and establish credibility ! Allows one to study electronics and zero-suppression readout schemes. Disadvantages Requires resources.

Flare mini review- part 2 April 19, 2005 Petros Rapidis20 b.Large prototypes : 100 to 1000 tons, and maybe a tall one (30m high)? Pro: Such devices allow one to test many of the issues involved in building the large detector. One can try to commit all the ‘sins’ here and find problems and solutions. In addition one can operate a substantially sized subset of the final purification system. Such devices, can be used as a near distance detector, but will not be optimized for such a purpose. Query: Is it the case that the issues of building a large detector are tractable engineering issues and their implementation in the final detector is standard engineering extrapolation, and, ipso facto, one does not need prototypes? There may be individual technical issues, but can they all be studied with specific individual prototyping? Con: (1) People, as well as money, will need to be devoted to such an effort and this will compete with, detract from, and delay the main tasks of designing, obtaining approval, and building the large detector. (2) There is a significant cost of such prototypes, due to fixed ‘end’ costs. We expect costs of ~ 2M$ to ~ 5 M$ or more depending on the size of the prototype.

Flare mini review- part 2 April 19, 2005 Petros Rapidis21 Develop a plan/design towards a 50 kTon detector, with the present design parameters. The final choice of detector size remains an open question; it will require input from many quarters (us, you, lab management, funding agencies, …). The 50 kTon design can be naturally scaled to a smaller size. Continue experimental studies to understand the technical issues of a LAr detector. Develop and refine the analysis and simulation programs. Our current plan is:

Flare mini review- part 2 April 19, 2005 Petros Rapidis22 Massive electronic imaging detectors provide a new modality needed for experimentation in high energy physics. We believe that a large LAr TPC is indeed such a detector. As such its introduction is somewhat akin to the introduction of large devices in the past, such as the bubble chamber, the large wire chamber systems, the silicon strip detectors. These devices, which in their time revolutionized the field, were brought to fruition by the significant involvement of the major laboratories. Such an institutional commitment is part of what we are requesting. Similarly, LAr imaging will revolutionize many aspects of our field. We have focused on the off-axis neutrino use of this device. But there are other uses: smaller experiments (see next talk by Bonnie Fleming), studies of proton decay, supernova neutrino detection, neutrinoless double beta decay, that can greatly benefit from this technology.